Planning application
Friar Park Stables Gravel Hill Badgemore RG9 4NR
Works: Trees
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Discharge of condition 4 - Tree Protection on application ref. P15/S3801/FUL Erection of a barn for ancillary storage purposes to the existing equestrian use (revision to Planning Application ref: P15/S2167/FUL)
As published by the council, reference P16/S1075/DIS
Application record
- Reference
- P16/S1075/DIS
- Type
- Other (Discharge Conditions)
- Status
- Permitted
- Decision
- No decision Issued
- Received
- 30 Mar 2016
- Validated
- 30 Mar 2016
- Postcode
- RG9 4NR
Timeline
Dates from the published record
-
30 Mar 2016
Received by South Oxfordshire
-
12 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
South Oxfordshire has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Friar Park, Gravel Hill, Henley on Thames, RG9 4NR
1 x Mature Sycamore 1 x Mature Birch 1 x mature Sycamore - displaying sporadic canopy retrenchment and indicating decline and deterioration. This was confirmed by structural defect (cavity) to the northern aspect just above ground level yet below bifurcation. Fell to ground level. Clear all wood and debris from work area and remove from Friar Park. 1 x Mature Birch appears suppressed and with defects. Fell to ground level. Remarks:
Decided Trees 2 docs -
Friar Park Badgemore RG9 4NR
Discharge of conditions 4 (materials) and 8 (surface water drainage) on application ref. P23/S2815/FUL (Erection of a detached garage/cycle/buggy store in the grounds of Friar Park).
Granted Conditions 5 docs -
Badgemore Grange Badgemore RG9 4NR
Discharge of condition(s) 5 (Ecology) and 6 (Tree Protection) on planning application P22/S3367/HH. (Proposed demolition of existing part two storey/part single storey additions to north-east elevation and erection of a replacement part two storey/part single storey extension. Proposed creation of external swimming pool, erection of single storey leisure building and alterations to existing tennis pavilion building).
Granted Conditions Extension Demolition +1 5 docsSmall domestic -
The Walled Garden Badgemore Park Golf Club Badgemore RG9 4NR
Removal of existing buildings and erection of 5no dwelling houses (2 x 2-bed dwellings, 1 x 3-bed dwelling and 2 x 5-bed dwellings) within existing walled garden; provision of private amenity space, car parking, bin and cycle storage related to: P16/S2039/FUL P17/S3853/FUL
Granted Full applications 44 docsSeveral homes -
Badgemore Park Country Club Badgemore RG9 4NR
Non-material amendment to application ref P21/S4715/FUL - comprising removal of the word "indoor" from approved description of development. (Proposed extensions and alterations to clubhouse building to provide improved changing, fitness and social facilities (including improved changing and locker room facilities); new indoor swimming pool; enhancements to hard and soft landscaping)
Decided Amendments Extension 4 docs -
Friar Park End, Badgemore, Henley on Thames, Oxon, RG9 4NR
T1 - Tillia cordata T1 - Tillia cordata - re-pollard back to old growth points to manage regrowth. Remarks: Spec:
Decided Trees 2 docs
Other condition discharge and variation applications
In South Oxfordshire
-
P26/S2980/S73 Granted
Rectory Pavilion, Chinnor Rugby Football Club Kingsey Road Thame OX9 3JL
Variation of condition 4 (Hours of use of floodlighting), of planning permission P26/S1549/FUL (Construction of 8 floodlights with luminaires to provide floodlighting to existing rugby pitch following removal of existing lights).
-
P26/S3564/DIS Granted
Newlands, Northend, Henley-on-Thames, RG9 6LQ
Discharge of conditions 7 (surface water drainage works) and 8 (foul drainage works) on application ref. P25/S0770/S73 Variation of condition 2 (approved plans) on application P23/S2783/FUL (Demolition of the existing dwelling and erection of replacement dwelling with associated parking and landscaping) - brick work in lieu of render.
-
P26/S2573/DIS Granted
The Boathouse, 2 The Moorings, Sheepwash Lane, Whitchurch-on-Thames, RG8 7RA
Discharge of Conditions 5 (Construction Environmental Management Plan), 6 (Bat & Bird Boxes) and 7 (Lighting) on Planning Permission P26/S0178/FUL (Demolition of existing and construction of a self-build replacement boathouse incorporating a wet dock, dry boat store and workshop at ground level, with two-bedroom residential accommodation above).
-
P26/S3287/DIS Granted
Two Tanners Cottages 25 Tanners Lane Chalkhouse Green Reading RG4 9AE
Discharge of conditions 6(construction method statement for bats) and 7(enhancements for bats (and nesting birds)) on application ref. P24/S3165/HH Two storey side/rear extension. Single storey rear extension. Front porch extension.
-
P26/S1773/DIS Granted
Land at Oxford Brookes University Wheatley Campus Waterperry Road Holton OX33 1HX
Discharge condition(s) 8 (Drainage details) on planning application P17/S4254/O. Outline planning application, with all matters reserved for subsequent approval except details of vehicular access, for demolition of all existing structures and redevelopment of the site with up to 500 dwellings and associated works including; engineering operations, including site clearance, remediation, remodelling and deposition of inert fill material arising from demolition on site; installation of new and modification of existing services and utilities; construction of foul and surface water drainage systems, including SuDS; creation of noise mitigation bund and fencing; creation of public open space, leisure, sport and recreation facilities including equipped play areas; ecological mitigation works; construction of a building for community/sport use and associated car parking; construction of internal estate roads, private drives and other highways infrastructure and construction of pedestrian footpaths.