Watchman Energy Park Kirkhope Elvanfoot Biggar South Lanarkshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 13 turbines with a maximum blade tip height of up to 240 metres, a Battery Energy Storage System and associated infrastructure (section 36 consultation)
As published by the council, reference P/26/0443
Application record
- Reference
- P/26/0443
- Type
- Electricity notification S36 application
- Status
- Awaiting decision
- Decision
- Permitted
- Received
- 9 Apr 2026
- Validated
- 9 Apr 2026
- Decided
- 12 Aug 2026
- Ward
- 03 Clydesdale East
- Parish
- Crawford And Elvanfoot Community Council
- Decision by
- Planning committee
Timeline
Dates from the published record
-
9 Apr 2026
Received by South Lanarkshire
-
28 Jul 2026
Added to PlanIndex
-
12 Aug 2026
Decision issued: Permitted
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
South Lanarkshire granted permission on 12 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Other less common application types
In South Lanarkshire
-
P/25/0887 Decided
Land At Blantyre North Of Calderside Road Blantyre G72 9UF
Installation of Solar Array (PV) with ancillary substations and associated infrastructure (Section 36 Consultation).
-
P/26/0156 Granted
Land 140 NNW Of 3 Leadhills Road Leadhills Road Elvanfoot Biggar
Installation of overhead line (Consultation request under Section 37 of the Electricity Act 1989)
-
P/25/1165 Granted
East Kilbride BESS Cairnmuir Highway East Kilbride G74 4NU
Section 36 Consultation, Construction of 55MW BESS and associated infrastructure and land northwest if East Rogerton Cottage, East Kilbride.
-
P/25/0985 Granted
Birkenhead Farm Holmhead Road Lesmahagow Lanark ML11 0HW
Section 37 Simplified Wayleave Request
-
P/24/1168 Granted
A702 From Abington To Boundary At Dalveen Pass Elvanfoot Biggar
Installation of a replacement 11kV overhead line (16.8 km in length) (Simplified Notification)