Skip to content
PlanIndex Get alerts
Menu

Planning application

Indian Manor (2016) Ltd 1 Old Mill Road Bothwell G71 8AY

Granted South Lanarkshire HM/18/0002 Detailed planning application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of single storey rear extension

As published by the council, reference HM/18/0002

Application record

Reference
HM/18/0002
Type
Detailed planning application
Status
Decided
Decision
Application approved
Received
22 Dec 2017
Validated
3 Jan 2018
Decided
6 Mar 2018
Ward
16 Bothwell And Uddingston
Decision by
Delegated
Postcode
G71 8AY

Timeline

Dates from the published record

  1. 22 Dec 2017

    Received by South Lanarkshire

  2. 3 Jan 2018

    Validated

    Checked as complete and ready for consideration.

  3. 6 Mar 2018

    Decision issued: Application approved

  4. 5 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 1 Silverwells Bothwell G71 8AZ

    P/25/1214 Submitted 13 Oct 2025 42m away

    Erection of 1.5 storey side extension, formation of front dormer window and enlargement of rear dormer window, erection of raised patio and associated alterations

    Granted Householder Extension Loft or dormer +1 8 docs
    Domestic
  • 5 Silverwells Crescent Bothwell G71 8SE

    P/22/1771 Submitted 19 Dec 2022 68m away

    Erection of two 2 storey rear extensions, a single storey rear extension, new front dormer window, side entrance porch with access ramp and detached timber decking with pergola & BBQ area in rear garden

    Withdrawn Householder Extension Loft or dormer +1 22 docs
    Small domestic
  • Silverwells House 1 Old Mill Road Bothwell G71 8AY

    P/26/0653 Submitted 25 May 2026 93m away

    94% historically approved · decision due ~20 Jul

    Reinstatement of interiors after fire damage, internal alterations to a B listed building and retrospective decking and canopies to rear of building

    Awaiting decision 16 docs
  • 31 Dunlop Crescent Bothwell G71 8SG

    P/25/1221 Submitted 15 Oct 2025 149m away

    Demolition of existing garage and erection of ancillary outbuilding (Certificate of lawfulness- Proposed)

    Granted Lawful development Demolition 5 docs
  • 6 Langside Road Bothwell G71 8NG

    P/25/1452 Submitted 4 Dec 2025 150m away

    89% historically approved · decision due ~27 Mar

    Formation of a new driveway through the widening of the existing pedestrian access to 6 metres; erection of three retaining walls forming an enclosure; and erection of a garden room, together with associated ground engineering works.

    Awaiting decision Full applications 13 docs
  • 4 Orchard Avenue Bothwell G71 8NF

    P/26/0032/V Submitted 10 Jun 2026 150m away

    94% historically approved · decision due ~5 Aug

    NMV to the side extension, including an increase in the footprint of the extension and the replacement of a single rooflight with two rooflights (granted under P/24/1064).

    Decided Extension Loft or dormer 3 docs

In South Lanarkshire

  • P/26/0264 Granted

    35 Howieshill Road Cambuslang G72 8PW

    Use of former guest house/office to children's residential care home to accommodate 4 children (Class 8 residential institution), with associated works

    2 Mar 2026 Full applications
  • P/26/0128 Refused

    Building A 5 Stroud Road East Kilbride G75 0YA

    Use of industrial/storage warehouse as a padel court sports facility with associated alterations (Retrospective)

    30 Jan 2026 Full applications
  • P/26/0125 Granted

    Electricity Sub Station - 43M North Of Cathkin Smithy House East Kilbride Road Rutherglen G73 5RB

    Redevelopment of Cathkin Primary Substation to provide Switchgear Housing Building, 2 x Transformer Buildings, Secondary Substation Building, Security Fencing and Ancillary Works.

    29 Jan 2026 Full applications
  • P/26/0144 Granted

    5 Alice Gardens (Plot 42) Ashgill Larkhall ML9 3RH

    Erection of dwellinghouse and associated works

    2 Feb 2026 Full applications
  • P/26/0465 Granted

    3 Auchincampbell Road Hamilton ML3 6PE

    Erection of a single storey rear extension, formation of front and rear dormer windows, erection of an ancillary garage, and associated alterations to the external walls of the existing house.

    14 Apr 2026 Full applications