Skip to content
PlanIndex Get alerts
Menu

Planning application

8 High Street Biggar ML12 6BN

Granted South Lanarkshire CL/18/0017 Detailed planning application

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of 2 no. replacement timber windows, erection of replacement garage and outbuilding, and erection of conservatory to dwellinghouse

As published by the council, reference CL/18/0017

Application record

Reference
CL/18/0017
Type
Detailed planning application
Status
Decided
Decision
Application approved
Received
22 Dec 2017
Validated
22 Dec 2017
Decided
25 Apr 2018
Ward
03 Clydesdale East
Decision by
Delegated
Postcode
ML12 6BN

Timeline

Dates from the published record

  1. 22 Dec 2017

    Received by South Lanarkshire

  2. 25 Apr 2018

    Decision issued: Application approved

  3. 5 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

34 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 8 High Street Biggar ML12 6BN

    P/18/1672 Submitted 22 Nov 2018 1m away

    Erection of conservatory (listed building consent)

    Granted Heritage and listed buildings Extension 14 docs
  • 8 High Street Biggar ML12 6BN

    P/18/1673 Submitted 22 Nov 2018 1m away

    Erection of conservatory to dwellinghouse (amendment to previous planning consent CL/18/0017)

    Granted Householder Extension 15 docs
    Small domestic
  • 24 High Street Biggar ML12 6BN

    P/26/0968 Submitted 31 Jul 2026 35m away

    94% historically approved · decision due ~28 Sep

    Installation of a canopy, projecting sign, and fascia sign to the ground floor unit

    Awaiting decision 4 docs
  • Bethany Hall 29A High Street Biggar ML12 6DA

    P/26/0084 Submitted 22 Jan 2026 89m away

    Change of use from an office (Class 4) to a furniture school (Class 10)

    Granted Full applications 12 docs
  • 32 High Street Biggar ML12 6BN

    P/18/1744 Submitted 3 Dec 2018 100m away

    Refurbishment and alterations of existing timber sash and case windows including the replacement of the existing timber sashes with new timber sashes to match and fitted with slimline double glazing (4-6-4mm) (Listed Building Consent)

    Granted Heritage and listed buildings Windows or glazing 7 docs
  • 1-2 46 High Street Biggar ML12 6BJ

    P/26/0483 Submitted 16 Apr 2026 139m away

    Replacement of the existing boiler flue and installation of new external extract flues to the front and rear roof planes

    Granted Householder 8 docs
    Domestic

In South Lanarkshire

  • P/26/0264 Granted

    35 Howieshill Road Cambuslang G72 8PW

    Use of former guest house/office to children's residential care home to accommodate 4 children (Class 8 residential institution), with associated works

    2 Mar 2026 Full applications
  • P/26/0128 Refused

    Building A 5 Stroud Road East Kilbride G75 0YA

    Use of industrial/storage warehouse as a padel court sports facility with associated alterations (Retrospective)

    30 Jan 2026 Full applications
  • P/26/0125 Granted

    Electricity Sub Station - 43M North Of Cathkin Smithy House East Kilbride Road Rutherglen G73 5RB

    Redevelopment of Cathkin Primary Substation to provide Switchgear Housing Building, 2 x Transformer Buildings, Secondary Substation Building, Security Fencing and Ancillary Works.

    29 Jan 2026 Full applications
  • P/26/0144 Granted

    5 Alice Gardens (Plot 42) Ashgill Larkhall ML9 3RH

    Erection of dwellinghouse and associated works

    2 Feb 2026 Full applications
  • P/26/0465 Granted

    3 Auchincampbell Road Hamilton ML3 6PE

    Erection of a single storey rear extension, formation of front and rear dormer windows, erection of an ancillary garage, and associated alterations to the external walls of the existing house.

    14 Apr 2026 Full applications