Planning application
Lakeside Healthcare Sheepmarket Surgery Ryhall Road Stamford Lincolnshire PE9 1YA
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Replacement of a louvred entrance door with a composite door and the provision of an external wall mounted A/C unit.
As published by the council, reference S26/1652
Application record
- Reference
- S26/1652
- Type
- Lawful Development (Proposed)
- Status
- Awaiting decision
- Received
- 21 Sep 2026
- Validated
- 21 Sep 2026
- Ward
- Stamford St Marys Ward
- Parish
- Stamford Town Council
- Postcode
- PE9 1YA
Comment by 27 October 2026
The council is taking comments on this application until then. Have your say on South Kesteven's portal.
Timeline
Dates from the published record
-
21 Sep 2026
Received by South Kesteven
-
12 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 16 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
South Kesteven took a median of 64 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Belvoir Architecture Agent, an architecture practice
38 applications on PlanIndex · across 5 councils · 88% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with South Kesteven for determination, against a statutory target of eight weeks. Over the last year South Kesteven decided lawful development applications in a median of 74 days. More in our guide to how long planning decisions take.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Stamford And Rutland Hospital Ryhall Road Stamford Lincolnshire PE9 1UA
Submission of details reserved by condition 4 (landscaping) of planning permission S24/0244 (Erection of a new building within the Stamford and Rutland Hospital campus to accommodate clinical accommodation, with new plant at roof level and associated landscaping works)
Granted Conditions 5 docs -
Stamford And Rutland Hospital Ryhall Road Stamford Lincolnshire PE9 1UA
Submission of details reserved by condition 3 (surface water management) of planning permission S24/0244 (erection of a new building within the Stamford and Rutland Hospital campus to accommodate clinical accommodation, with new plant at roof level and associated landscaping works)
Granted Conditions 10 docs -
Stamford And Rutland Hospital Ryhall Road Stamford Lincolnshire PE9 1UA
Submission of details reserved by condition 5 (materials) of planning permission S24/0244 (Erection of a new building within the Stamford and Rutland Hospital campus to accommodate clinical accommodation, with new plant at roof level and associated landscaping works)
Granted Conditions 9 docs -
Stamford And Rutland Hospital Ryhall Road Stamford Lincolnshire PE9 1UA
85% historically approved · decision due ~14 Aug
Roof works including removal of chimney and installation of in-roof solar panels
Awaiting decision Full applications 13 docs -
Stamford And Rutland Hospital Ryhall Road Stamford Lincolnshire PE9 1UA
Erection of a temporary modular building for use as a training centre (retrospective)
Granted Full applications 16 docs -
Stamford And Rutland Hospital Ryhall Road Stamford Lincolnshire PE9 1UA
Prior approval for the installation of roof-mounted solar photovoltaic panels
Refused 9 docs
Other lawful development applications
In South Kesteven
-
S26/1268 Refused
The Bothy Green Lane Syston Lincolnshire NG32 2BZ
New car port
-
S26/1332 Refused
Wildwood Nightingale Lane Aisby Lincolnshire NG32 3NE
Proposed formation of a private agricultural access track with a washed gravel permeable surface under Schedule 2, Part 6 of the GPDO 2015 (as amended).
-
S26/1280 Refused
117 Manthorpe Road Grantham Lincolnshire NG31 8DQ
Conversion of Residential Dwelling (C3) into a 6 Bed HMO (C4). Internal Works to provide en-suite accommodation.
-
S26/1213 Granted
Old Smithy 12 Church Street Corby Glen Lincolnshire NG33 4NJ
Lawful development certificate (existing) for the change of use of property, including outbuilding, as single dwellinghouse (C3).
-
S26/0913 Granted
Development Balfour Beatty East Of Folkingham Road Morton Lincolnshire PE10 0NS
Application for Certificate of Lawful Development for confirmation of lawful commencement of S19/1784