Skip to content
PlanIndex Get alerts
Menu

Planning application

S26/1211

5 Sutherland Way Stamford Lincolnshire PE9 2TA

Awaiting decision South Kesteven Householder

Proposal

Installation of air source heat pump to side (north) elevation of dwelling.

As published by the council, reference S26/1211

Timeline

Dates from the published record

  1. 14 Jul 2026

    Received by South Kesteven

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with South Kesteven for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About householder applications

How this application type works

Householder applications cover work to an existing house and its garden: extensions, loft and garage conversions, porches, outbuildings and similar alterations within the boundary of the home. They cannot be used to create a separate dwelling or change what the building is used for. Councils aim to decide them within eight weeks, and immediate neighbours are usually notified and given a chance to comment.

More on householder applications in our guide

Nearby applications

Within 500 metres

  • S24/1315 Granted

    18 Highgrove Gardens Stamford Lincolnshire PE9 2GR

    Reduce height by 3m and width by 4m of Tulip Tree (TP.4)

    30 Jul 2024 103m away Trees
  • S21/1137 Granted

    158 Empingham Road Stamford Lincolnshire PE9 2SZ

    T1 - Mature ash - Remove deadwood over 4cm diameter and reduce height to 6m

    7 Jun 2021 163m away Trees
  • S26/1109 Awaiting decision

    14 Argyll Way Stamford Lincolnshire PE9 2XQ

    Extensions and alterations to dwelling.

    26 Jun 2026 234m away Householder
  • S26/1111 Awaiting decision

    19 Stirling Road Stamford Lincolnshire PE9 2XF

    Non-material amendment to planning permission S21/2356 (Single storey extensions to the front and rear with first floor extensions to the front, side and rear. Resubmission of S21/1625) to relocate ground floor WC, change internal configuration of kitchen, replace bedroom 1 walk-in wardrobe with en-suite to bedroom 2 and minor internal changes to wall and door positions of bedrooms 3 and 4.

    26 Jun 2026 290m away Amendments
  • S22/2370 Granted

    63 Sutherland Way Stamford Lincolnshire PE9 2TD

    Erection of two storey rear extension and single storey side extension following removal of existing garage, insertion of first floor side window

    6 Dec 2022 307m away Householder
  • S26/1016 Awaiting decision

    25 Cromarty Road Stamford Lincolnshire PE9 2TQ

    Proposed single storey rear extension to replace existing Conservatory and proposed first floor side extension.

    12 Jun 2026 319m away Householder

In South Kesteven

  • S26/0833 Granted

    38 Station Road Morton Lincolnshire PE10 0NN

    Erection of a single storey front extension to the principal elevation to form a bay projection and external porch

    5 May 2026 Householder
  • S26/0772 Granted

    5 Church Street South Witham Lincolnshire NG33 5PJ

    Proposed replacement doors and windows

    30 Apr 2026 Householder
  • S26/0859 Granted

    7 Belton Grove Grantham Lincolnshire NG31 9HH

    First floor side extension

    18 May 2026 Householder
  • S26/0942 Granted

    1A Essex Way Bourne Lincolnshire PE10 9NH

    Construction of a cabin/garden room 3.7m x 2.8m

    1 Jun 2026 Householder
  • S26/0604 Granted

    11 Northorpe Thurlby Lincolnshire PE10 0HH

    Two-storey front/side extension to form additional living space and entrance lobby to ground floor, additional master bedroom and en-suite to first floor, new windows and render finish throughout, rear bi-fold door opening and associated internal alterations

    7 Apr 2026 Householder