Skip to content
PlanIndex Get alerts
Menu

Planning application

S26/1103

The Bath House 16 Bath Row Stamford Lincolnshire PE9 2QU

Awaiting decision South Kesteven Full Planning Permission

Proposal

Change of use from office to residence.

As published by the council, reference S26/1103

Timeline

Dates from the published record

  1. 25 Jun 2026

    Received by South Kesteven

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with South Kesteven for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • S21/0982 Granted

    1 Sheep Market Stamford Lincolnshire PE9 2QZ

    Vent at side of building

    17 May 2021 82m away Heritage and listed buildings
  • S23/0021 Granted

    Austin House 4 Austin Street Stamford Lincolnshire PE9 2QR

    Installation of solar panels to existing garage.

    6 Jan 2023 90m away Householder
  • S23/0022 Granted

    Austin House 4 Austin Street Stamford Lincolnshire PE9 2QR

    Installation of solar panels to existing garage.

    6 Jan 2023 92m away Heritage and listed buildings
  • S24/1438 Granted

    Street Record Horseshoe Lane Stamford Lincolnshire PE9 2RB

    Proposed Metallic Archway to sit at the bottom of Horse shoe Lane.

    20 Aug 2024 126m away Full applications
  • S23/0169 Granted

    11 Austin Street Stamford Lincolnshire PE9 2QR

    T1 - Fell beech tree, repollard all beech along the boundary wall back to previously established points. Approx 1.5m reduction.

    27 Jan 2023 140m away Trees
  • S26/0738 Awaiting decision

    7 Red Lion Square Stamford Lincolnshire PE9 2AJ

    Installation of a bespoke metal vent cover over existing kitchen extractor fan.

    27 Apr 2026 150m away Heritage and listed buildings

In South Kesteven

  • S26/0743 Granted

    Lincolnshire Herbs Ltd Spalding Road Bourne Lincolnshire PE10 0AU

    Single storey extension to existing agricultural building to match existing and construction of link extension to provide additional office space

    27 Apr 2026 Full applications
  • S26/0801 Granted

    The Barn 59 Northorpe Thurlby Lincolnshire PE10 0HH

    Erection of single storey warehouse in connection with the existing business on the site.

    5 May 2026 Full applications
  • S26/0660 Granted

    1 Victoria Stables Essex Way Bourne Lincolnshire PE10 9JZ

    Construction of a detached garage

    16 Apr 2026 Full applications
  • S26/0318 Granted

    21 St Peters Street Stamford Lincolnshire PE9 2PF

    Single storey side extension, replacement gate and vehicle paving to No 21 and external render to Nos 21 and 21a.

    23 Feb 2026 Full applications
  • S26/0821 Granted

    81 High Street Market Deeping Lincolnshire PE6 8ED

    S73 application to vary condition 3 (Flood Risk Assessment) of planning permission S25/1895 (Section 73 application for a variation of conditions 2 (amended plans) and 4 (materials) of S20/1432 (Erection of two-storey, detached dwelling) relating to changing details of the building and external materials)

    11 May 2026 Full applications