Skip to content
PlanIndex Get alerts
Menu

Planning application

S26/0647

Land Off 4 New Road Lincolnshire Langtoft

Granted South Kesteven Full Planning Permission

Proposal

Construction of a three bedroom bungalow and car parking.

As published by the council, reference S26/0647

Timeline

Dates from the published record

  1. 13 Apr 2026

    Received by South Kesteven

  2. 23 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jun 2026

    Decision issued: Approved conditionally

  4. 22 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • S24/1604 Granted

    26 Cloven Ends Langtoft Lincolnshire PE6 9LF

    Section 73 application to vary Condition 2 (Approved Plans) and for the approval of details of Condition 4 (Landscaping) of planning permission S23/1164 (Erection of one detached dwelling)

    18 Sep 2024 98m away Full applications
  • S23/0266 Granted

    East End Park, Langtoft

    Cherry (T1) - fell, cherry (T2) - fell, willow (T3) - re-pollard to 3m in height, willow (T4) - pollard to 3m in height, willow (T5) - pollard to 3m in height, willow (T6) - fell

    9 Feb 2023 122m away Trees
  • S26/0776 Granted

    13 Deer Park Road Langtoft Lincolnshire PE6 9RD

    Demolition of existing conservatory and erection of single storey rear extension

    30 Apr 2026 129m away Householder
  • S26/1037 Granted

    The Church Barn East End Langtoft Lincolnshire PE6 9LP

    Section 211 notice to fell Rowan tree (retrospective).

    16 Jun 2026 347m away Trees
  • S21/1169 Granted

    1A West End Langtoft Lincolnshire PE6 9LS

    Removal of sycamore tree

    9 Jun 2021 469m away Trees
  • S24/1893 Granted

    4 The Rides Langtoft Lincolnshire PE6 9RR

    Removal of tree trunk

    11 Oct 2024 486m away Trees

In South Kesteven

  • S26/0743 Granted

    Lincolnshire Herbs Ltd Spalding Road Bourne Lincolnshire PE10 0AU

    Single storey extension to existing agricultural building to match existing and construction of link extension to provide additional office space

    27 Apr 2026 Full applications
  • S26/0801 Granted

    The Barn 59 Northorpe Thurlby Lincolnshire PE10 0HH

    Erection of single storey warehouse in connection with the existing business on the site.

    5 May 2026 Full applications
  • S26/0660 Granted

    1 Victoria Stables Essex Way Bourne Lincolnshire PE10 9JZ

    Construction of a detached garage

    16 Apr 2026 Full applications
  • S26/0318 Granted

    21 St Peters Street Stamford Lincolnshire PE9 2PF

    Single storey side extension, replacement gate and vehicle paving to No 21 and external render to Nos 21 and 21a.

    23 Feb 2026 Full applications
  • S26/0821 Granted

    81 High Street Market Deeping Lincolnshire PE6 8ED

    S73 application to vary condition 3 (Flood Risk Assessment) of planning permission S25/1895 (Section 73 application for a variation of conditions 2 (amended plans) and 4 (materials) of S20/1432 (Erection of two-storey, detached dwelling) relating to changing details of the building and external materials)

    11 May 2026 Full applications