Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Maiden Lane Stamford Lincolnshire PE9 2AZ

Granted South Kesteven S23/0365 Full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replace existing front windows/door to black crittall style windows and door

As published by the council, reference S23/0365

Application record

Reference
S23/0365
Type
Full Planning Permission
Status
Decided
Decision
Approved conditionally
Received
24 Feb 2023
Validated
16 Mar 2023
Decided
3 May 2023
Ward
Stamford St Marys Ward
Parish
Stamford Town Council
Decision by
Delegated Decision
Postcode
PE9 2AZ

Timeline

Dates from the published record

  1. 24 Feb 2023

    Received by South Kesteven

  2. 16 Mar 2023

    Validated

    Checked as complete and ready for consideration.

  3. 3 May 2023

    Decision issued: Approved conditionally

  4. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • The Old Bank 52 High Street Stamford Lincolnshire PE9 2BD

    S26/1323 Submitted 20 Jul 2026 12m away

    Application for a pavement café licence - public notice.

    Granted Outline 3 docs
  • 29 High Street Stamford Lincolnshire PE9 2BB

    S26/1291 Submitted 14 Jul 2026 37m away

    Application for a pavement café licence - public notice.

    Granted Outline 5 docs
  • 32 High Street Stamford PE9 2BB

    S21/1078 Submitted 1 Jun 2021 47m away

    Installation/erection of flue to rear elevation

    Granted Full applications 10 docs
  • Rear Of 39 High Street Stamford Lincolnshire PE9 2BB

    S24/1542 Submitted 6 Sep 2024 78m away

    Proposed remodelling of existing office, rendering of front elevation in sterling white silicone render, replacement anthracite grey UPVC windows and Aluminium doors

    Granted Full applications Windows or glazing 8 docs
  • 21 High Street Stamford Lincolnshire PE9 2AL

    S26/1203 Submitted 8 Jul 2026 81m away

    License Application - Proposed Outdoor Seating.

    Granted Outline 7 docs
  • 56 High Street Stamford Lincolnshire PE9 2AW

    S26/1024 Submitted 15 Jun 2026 93m away

    91% historically approved · decision due ~10 Aug

    New decorations to external shopfront and building facade. New aperture within existing internal wall to allow access to staircase. Removal of floorboards and ceilings to create opening to internal entrance area.

    Awaiting decision Heritage and listed buildings Windows or glazing 26 docs

In South Kesteven

  • S26/0771 Refused

    Land East Of 51 Towngate East Market Deeping Lincolnshire PE6 8DR

    Erection of bungalow and industrial units

    29 Apr 2026 Full applications
  • S26/1103 Granted

    The Bath House 16 Bath Row Stamford Lincolnshire PE9 2QU

    Change of use from office to residential dwelling

    25 Jun 2026 Full applications
  • S26/1019 Refused

    3 Red Lion Street Stamford Lincolnshire PE9 1PA

    Retrospective Application for the Painting of Front Facade

    15 Jun 2026 Full applications
  • S26/0630 Granted

    53 Grantley Street Grantham Lincolnshire NG31 6BW

    Change of use of from residential garden (C3) to mixed use of residential (C3) and commercial (B8) for garages and formation of new access

    31 Mar 2026 Full applications
  • S26/1000 Granted

    Little Farm 83 Station Street Rippingale Lincolnshire PE10 0SX

    Section 73 application to vary condition 2 (approved plans) of S25/1476 (Residential development of two detached dwellings)

    10 Jun 2026 Full applications