Skip to content
PlanIndex Get alerts
Menu

Planning application

98 Empingham Road Stamford PE9 2RJ

Granted South Kesteven S21/1055 Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed dropped kerb for access to shared parking area accessed via Roman Bank. Resurfacing of parking area and access to rear. Erection of brick storage shed.

As published by the council, reference S21/1055

Application record

Reference
S21/1055
Type
Full Planning Permission
Status
Decided
Decision
Approved conditionally
Received
26 May 2021
Validated
23 Jun 2021
Decided
18 Aug 2021
Ward
Stamford St Marys Ward
Parish
Stamford Town Council
Decision by
Delegated Decision
Postcode
PE9 2RJ

Timeline

Dates from the published record

  1. 26 May 2021

    Received by South Kesteven

  2. 23 Jun 2021

    Validated

    Checked as complete and ready for consideration.

  3. 18 Aug 2021

    Decision issued: Approved conditionally

  4. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Thurlees 100 Empingham Road Stamford Lincolnshire PE9 2SU

    S26/1333 Submitted 13 Jul 2026 51m away

    87% historically approved · decision due ~15 Oct

    Replacement two storey dwelling

    Awaiting decision Full applications 9 docs
    Domestic
  • 25 Roman Bank Stamford PE9 2SS

    S21/1266 Submitted 24 Jun 2021 109m away

    Erection of single storey side and rear extension

    Granted Householder Extension 9 docs
    Small domestic
  • 8 The Hermitage Stamford PE9 2RF

    S24/1657 Submitted 25 Sep 2024 116m away

    Works to Hornbeam (T1) involving reduction back to previous point, 4 metre reduction in height, pruning to boundary and crown raise by 4 metres.

    Granted Trees 5 docs
  • 17 Exeter Gardens Stamford Lincolnshire PE9 2RN

    S23/0371 Submitted 27 Feb 2023 239m away

    Erection of single storey rear extension

    Granted Householder Extension 10 docs
    Small domestic
  • 93 Queens Walk Stamford Lincolnshire PE9 2QF

    S26/1065 Submitted 22 Jun 2026 276m away

    Redesign of the principal elevation including alterations to the existing dormers, the addition of a new gable and porch, single-storey rear extension, render to the facades and installation of photovoltaic (PV) panels.

    Granted Householder Extension Loft or dormer 10 docs
    Small domestic
  • 8 Torkington Street Stamford Lincolnshire PE9 2UY

    S21/1303 Submitted 28 Jun 2021 300m away

    Single storey flat roof rear extension

    Decided Prior approval Extension 9 docs
    Small domestic

In South Kesteven

  • S26/0771 Refused

    Land East Of 51 Towngate East Market Deeping Lincolnshire PE6 8DR

    Erection of bungalow and industrial units

    29 Apr 2026 Full applications
  • S26/1103 Granted

    The Bath House 16 Bath Row Stamford Lincolnshire PE9 2QU

    Change of use from office to residential dwelling

    25 Jun 2026 Full applications
  • S26/1019 Refused

    3 Red Lion Street Stamford Lincolnshire PE9 1PA

    Retrospective Application for the Painting of Front Facade

    15 Jun 2026 Full applications
  • S26/0630 Granted

    53 Grantley Street Grantham Lincolnshire NG31 6BW

    Change of use of from residential garden (C3) to mixed use of residential (C3) and commercial (B8) for garages and formation of new access

    31 Mar 2026 Full applications
  • S26/1000 Granted

    Little Farm 83 Station Street Rippingale Lincolnshire PE10 0SX

    Section 73 application to vary condition 2 (approved plans) of S25/1476 (Residential development of two detached dwellings)

    10 Jun 2026 Full applications