Planning application
Rear of 8 High Street Holbeach Spalding PE12 7DU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of written scheme of archaeology (Condition 19 of H09-1150-20)
As published by the council, reference H09-0514-21
Application record
- Reference
- H09-0514-21
- Type
- CONDITION COMPLIANCE
- Status
- Approved
- Decision
- Granted As published: Permitted
- Received
- 7 May 2021
- Validated
- 11 May 2021
- Decided
- 5 Jul 2021
- Parish
- Holbeach
- Postcode
- PE12 7DU
Site history
Applications at this address on the South Holland register
This site has had 2 applications since 2021: 1 approved, 0 refused.
-
H09-0776-24 Withdrawn
Rear of 8 High Street Holbeach Spalding PE12 7DU
Details of final report relating to archaeology (Condition 21 of H09-1150-20)
Timeline
Dates from the published record
-
7 May 2021
Received by South Holland
-
11 May 2021
Validated
Checked as complete and ready for consideration.
-
5 Jul 2021
Decision issued: Permitted
-
17 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
South Holland granted permission on 5 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
17 HIGH STREET HOLBEACH SPALDING PE12 7DU
Demolition of single-storey rear wing (retrospective), removal and rebuild of upper part of front elevation (retrospective), construction of two-storey rear wing and change of use of first and second floors to offices - approved under H09-0465-15. Modification of Condition 6 to allow upvc windows in lieu of wooden windows.
Granted Amendments Demolition Windows or glazing 5 docsSmall domestic -
-
Rear of 8 High Street Holbeach Spalding PE12 7DU
Details of final report relating to archaeology (Condition 21 of H09-1150-20)
Withdrawn Conditions 6 docs -
19 High Street Holbeach Spalding PE12 7DU
Renovation and conversion to create 5 flats
Granted Full applications New dwelling 16 docsSeveral homes -
9-11 High Street Holbeach Spalding PE12 7DU
Convert first and second floor of front building into residential and ground and first floor of rear building into residential - creating 3 one bed flats in total.
Granted Full applications New dwelling 12 docs -
9 - 11 High Street Holbeach Spalding PE12 7DU
Change of Use of First and Second Floor Offices (Front Building) and Ground and First Floor Ancillary Retail Storage Space (Rear Building) to Residential Dwellings (Use Class C3) to provide a total of three one-bedroom flats
Granted Full applications New dwelling
Other condition discharge and variation applications
In South Holland
-
H13-1006-26 Awaiting decision
West View Farm Red Cow Drove Moulton Marsh PE12 6LW
Details of BNG Plan, 30 Year HMMP, Landscaping & Boundary Treatments (Conditions 2, 3, 5 & 6 of H13-0781-26)
-
H05-0823-26 Granted
Foxburrow Farm Winslow Gate Holbeach PE12 8LS
Details of biodiversity gain plan and written 30-year Habitat Management and Maintenance Plan (HMMP) (Conditions 4 and 5 of H05-0456-26)
-
H14-0999-26 Awaiting decision
The Bell Inn 33 Church Street Pinchbeck PE11 3UB
Details of construction management plan & method statement, landscaping & tree planting, foul & surface water disposal & contamination of land or pollution of controlled water (Conditions 9, 10, 20 & 21 of H14-0523-26)
-
H14-0985-26 Awaiting decision
Land off Stephenson Avenue Pinchbeck Spalding PE11 3SW
Details of surface water disposal, scheme of mitigation relating to nesting birds, biodiversity gain plan, written 30-year Habitat Management and Maintenance Plan (HMMP) (Conditions 8, 9, 10, 11 of H14-1286-25)
-
H09-0980-26 Awaiting decision
Methodist Church Chapel Drove Holbeach Drove PE12 0PT
Details of photographic building recording (Condition 3 of H09-0697-24)