Planning application
2 Coniston Road Patchway South Gloucestershire BS34 5PA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of two storey building to form 4no. residential units, 2 units for maximum of 10 people and 2 units for a maximum of 12 people as a large house in multiple occupation (HMO) (Use Class C4) with new access and parking
As published by the council, reference P22/06440/F
Application record
- Reference
- P22/06440/F
- Type
- Full Planning
- Status
- Decided
- Decision
- Approve with Conditions
- Received
- 11 Nov 2022
- Validated
- 14 Nov 2022
- Decided
- 27 Jan 2023
- Ward
- Patchway Coniston
- Parish
- Patchway Town Council
- Decision by
- Circulated Schedule
- Postcode
- BS34 5PA
Timeline
Dates from the published record
-
11 Nov 2022
Received by South Gloucestershire
-
14 Nov 2022
Validated
Checked as complete and ready for consideration.
-
27 Jan 2023
Decision issued: Approve with Conditions
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
31 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2-8 Coniston Road Patchway South Gloucestershire BS34 5PA
Discharge of condition 3 (Landscape) attached to planning permission P23/01626/RVC. Variation of condition 13 attached to P22/06440/F to supersede plan numbers 3520/3,4,5, and 6 and replace with plan number 4166.PL.03 and 4166.PL.04.
Decided Conditions 4 docs -
7 Coniston Road Patchway South Gloucestershire BS34 5PA
86% historically approved · decision due ~3 Aug
Discharge of conditions 2 (ventilation upgrade) and 4 (operational management statement) attached to planning permission P25/01812/F. Installation of 1no. shipping container forming fast food takeaway (Sui Generis) with associated works (retrospective).
Awaiting decision Conditions 9 docs -
Rolls Royce Plc Rolls Royce Site Gloucester Road North Filton South Gloucestershire BS34 7QE
86% historically approved · decision due ~21 Oct
Agent has asked for this to be allocated to another officer in Tom's absence Discharge of condition 5 (The General BNG Condition) attached to planning permission P26/00296/F. Realignment and installation of ground services and utilities ahead of future redevelopment.
Awaiting decision Conditions 3 docs -
Rolls Royce Plc Assistant Property Manager Rolls Royce Site Gloucester Road North Filton South Gloucestershire BS34 7QE
Screening opinion for P23/00004/F.
Decided Outline -
Rolls Royce Plc Rolls Royce Site Gloucester Road North Filton South Gloucestershire BS34 7QE
82% historically approved · decision due ~12 Oct
Erection of 2no. buildings to form engine test bed facility with associated development and works.
Awaiting decision Full applications 28 docs -
Rolls Royce Plc Rolls Royce Site Gloucester Road North Filton South Gloucestershire BS34 7QE
Discharge of condition 4 (LEMP) attached to permission P25/01239/F Relocation of waste compound facility comprising the erection of an open sided covered waste area and a forklift workshop including office and welfare facilities.
Decided Conditions 7 docs
Other full applications applications
In South Gloucestershire
-
P26/00179/F Granted
Land At Damson House 139 Down Road Winterbourne Down South Gloucestershire BS36 1DF
Erection of 1 no. self-build dwelling with garage and associated works.
-
P25/01701/F Granted
Land North And South Of The Henbury Loop Railway Line At The Former Filton Airfield South Gloucestershire
Construction of a new pedestrian bridge linking the former Filton Airfield and the Brabazon Hangar sites over the Henbury Spur railway line, including earthworks and associated development.
-
P26/01408/F Refused
199 Gloucester Road Patchway South Gloucestershire BS34 6ND
Change of use of garage building to 1no. dwelling with associated works.
-
P26/01602/F Withdrawn
28 Station Road Yate South Gloucestershire BS37 4PW
Change of use from builders' merchants to a mixed-use hand car wash facility and tyre fitting garage (Sui Generis) as defined in the Town and Country Planning (Use Classes) Order 1987 (as amended) and the erection of 1no. wash shelter, associated boundary mitigation, and drainage works.
-
P25/00887/F Withdrawn
Land At Hollybush Farm The Street Acton Turville South Gloucestershire
Creation of 4no. space parking area with associated works.