Skip to content
PlanIndex Get alerts
Menu

Planning application

Bath Ales Ltd Hare House Southway Drive Warmley South Gloucestershire BS30 5LW

Granted South Gloucestershire P21/02833/F Full Planning

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of an external waste yeast tank connected to existing brewery plant.

As published by the council, reference P21/02833/F

Application record

Reference
P21/02833/F
Type
Full Planning
Status
Decided
Decision
Approve with Conditions
Received
21 Apr 2021
Validated
28 Apr 2021
Decided
2 Jul 2021
Ward
Bitton And Oldland Common
Parish
Bitton Parish Council
Decision by
Circulated Schedule
Postcode
BS30 5LW

Timeline

Dates from the published record

  1. 21 Apr 2021

    Received by South Gloucestershire

  2. 28 Apr 2021

    Validated

    Checked as complete and ready for consideration.

  3. 2 Jul 2021

    Decision issued: Approve with Conditions

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2 Willow Close Bridgeyate South Gloucestershire BS30 5HZ

    P21/04508/F Submitted 21 Jun 2021 65m away

    Erection of a single storey rear extension to form additional living accommodation.

    Granted Full applications Extension 6 docs
    Small domestic
  • 72A Bath Road Bridgeyate South Gloucestershire BS30 5JR

    P25/02058/HH Submitted 29 Aug 2025 125m away

    Erection of a single storey side, rear and first floor side extension to form additional living accommodation. Installation of front and rear dormers and raising of roofline to facilitate loft conversion.

    Granted Householder Extension Loft or dormer 17 docs
    Small domestic
  • Unit 3 Southway Drive Warmley BRISTOL South Gloucestershire BS30 5LW

    PK06/3262/RVC Submitted 25 Oct 2006 127m away

    Variation of Condition 12 of Planning Permission P97/4145 to change operation times from 6.00am - 10.00pm Mondays to Fridays and 8.00am - 12.00pm Saturdays only to 6.00am - 10.00pm Mondays to Fridays and 8.00am - 6.00pm Saturdays only. Variation of Condition 13 to change delivery times from 7.00am - 4.00pm Monday to Fridays only to 7.00am - 7.00pm Mondays to Fridays and 8.00 - 6.00pm Saturdays only. (Resubmission of application PK06/2657/VAR)

    Granted Amendments 12 docs
  • 74-76 Poplar Road Warmley South Gloucestershire BS30 5JS

    P21/01012/F Submitted 23 Feb 2021 137m away

    Demolition of 2no. existing dwellings. Erection of 7no. dwellings with access, parking and associated works (resubmission of P20/16806/F).

    Granted Full applications Demolition 62 docs
    Several homes
  • Land South Of The Hollybush Inn 29 Bath Road Bridgeyate Bristol South Gloucestershire BS30 5JP

    P20/01833/O Submitted 29 Jan 2020 143m away

    Erection of 2 no. Bungalows (Outline) with all matters reserved (resubmission of application PK18/0257/O).

    Refused Outline 33 docs
  • 2 Cann Lane Oldland Common South Gloucestershire BS30 5NH

    P21/02558/F Submitted 6 Apr 2021 146m away

    Erection of 1 no. detached garage.

    Granted Full applications 15 docs

In South Gloucestershire

  • P26/00179/F Granted

    Land At Damson House 139 Down Road Winterbourne Down South Gloucestershire BS36 1DF

    Erection of 1 no. self-build dwelling with garage and associated works.

    23 Jan 2026 Full applications
  • P25/01701/F Granted

    Land North And South Of The Henbury Loop Railway Line At The Former Filton Airfield South Gloucestershire

    Construction of a new pedestrian bridge linking the former Filton Airfield and the Brabazon Hangar sites over the Henbury Spur railway line, including earthworks and associated development.

    11 Jul 2025 Full applications
  • P26/01408/F Refused

    199 Gloucester Road Patchway South Gloucestershire BS34 6ND

    Change of use of garage building to 1no. dwelling with associated works.

    18 Jun 2026 Full applications
  • P26/01602/F Withdrawn

    28 Station Road Yate South Gloucestershire BS37 4PW

    Change of use from builders' merchants to a mixed-use hand car wash facility and tyre fitting garage (Sui Generis) as defined in the Town and Country Planning (Use Classes) Order 1987 (as amended) and the erection of 1no. wash shelter, associated boundary mitigation, and drainage works.

    16 Jul 2026 Full applications
  • P25/00887/F Withdrawn

    Land At Hollybush Farm The Street Acton Turville South Gloucestershire

    Creation of 4no. space parking area with associated works.

    1 Apr 2025 Full applications