Planning application
Harefurlong 31 Back Lane Marshfield South Gloucestershire SN14 8NQ
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of single storey link extension to form entrance way.
As published by the council, reference P21/02010/F
Application record
- Reference
- P21/02010/F
- Type
- Full Planning
- Status
- Decided
- Decision
- Approve with Conditions
- Received
- 22 Mar 2021
- Validated
- 29 Mar 2021
- Decided
- 11 May 2021
- Ward
- Boyd Valley
- Parish
- Marshfield Parish Council
- Decision by
- Fully Delegated
- Postcode
- SN14 8NQ
Timeline
Dates from the published record
-
22 Mar 2021
Received by South Gloucestershire
-
29 Mar 2021
Validated
Checked as complete and ready for consideration.
-
11 May 2021
Decision issued: Approve with Conditions
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
3 Hitchen Close Marshfield CHIPPENHAM South Gloucestershire SN14 8LW
Erection of 2 metre high boundary garden wall (repositioning of existing wall).
Granted Full applications 9 docs -
Building To The Rear Of Elmslea 66 High Street Marshfield South Gloucestershire
Conversion of outbuilding to form 1no. self build dwelling (Class C3) with associated works.
Refused Full applications New dwelling 28 docsSmall domestic -
Apple Tree Barn 37 Back Lane Marshfield South Gloucestershire SN14 8NG
82% historically approved · decision due ~30 Dec
Conversion of outbuilding to form 1no. self Build dwelling (Class C3) with associated works.
Awaiting decision Full applications New dwelling 21 docsSmall domestic -
44 High Street Marshfield South Gloucestershire SN14 8LP
Discharge of condition 3 (Detailed design) attached to planning permission P21/06941/LB Partial demolition of internal and external walls, erection of single storey side/rear extension and the application of damp-proof membrane to basement walls. Removal of existing first floor bathroom and installation of 2 no. new first floor bathrooms. Installation of timber studwork and plaster to detached storage room to form habitable room. Re-roof former tannery outbuilding and installation of new windows, doors, staircase and wall lining to facilitate the formation of a two-storey incidental outbuilding.
Decided Conditions Extension Roofing +2 5 docsSmall domestic -
Fairfield House Back Lane Marshfield South Gloucestershire SN14 8NQ
Works to 1no. Beech, to reduced by approximately 3 metres to leave at a finished height of approximately 3 metres. Works to fell 1no. Holly.
Granted Trees 6 docs -
Harefurlong 31 Back Lane Marshfield South Gloucestershire SN14 8NQ
96% historically approved · decision due ~19 Oct
Works to 1no. Yew to crown reduction of approx 1-1.5 metres and to leave a finished height of 6 metres and a radial spread of 5 metres covered by Tree Preservation Order SGTPO 17/06 dated 21 November 2006.
Awaiting decision Trees 3 docs
Other full applications applications
In South Gloucestershire
-
P26/00179/F Granted
Land At Damson House 139 Down Road Winterbourne Down South Gloucestershire BS36 1DF
Erection of 1 no. self-build dwelling with garage and associated works.
-
P25/01701/F Granted
Land North And South Of The Henbury Loop Railway Line At The Former Filton Airfield South Gloucestershire
Construction of a new pedestrian bridge linking the former Filton Airfield and the Brabazon Hangar sites over the Henbury Spur railway line, including earthworks and associated development.
-
P26/01408/F Refused
199 Gloucester Road Patchway South Gloucestershire BS34 6ND
Change of use of garage building to 1no. dwelling with associated works.
-
P26/01602/F Withdrawn
28 Station Road Yate South Gloucestershire BS37 4PW
Change of use from builders' merchants to a mixed-use hand car wash facility and tyre fitting garage (Sui Generis) as defined in the Town and Country Planning (Use Classes) Order 1987 (as amended) and the erection of 1no. wash shelter, associated boundary mitigation, and drainage works.
-
P25/00887/F Withdrawn
Land At Hollybush Farm The Street Acton Turville South Gloucestershire
Creation of 4no. space parking area with associated works.