Planning application
Land At Wyck Beck Road And Fishpool Hill Patchway Cribbs Causeway Bristol South Gloucestershire
Works: New dwelling Major scheme
Read from the description, not a valuation. How we read the register
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Discharge of conditions 6 (Masterplan) and 8 (Phasing) attached to permission PT12/1930/O. Mixed use development across 53.80 hectares of land comprising up to 1,100 new dwellings (Use Class C3) a local centre (Use Classes A1,A2,A3,A4, A5,B1,D1,D2) a primary school together with supporting infrastructure and facilities including: new vehicular access with Wyck Beck Road, public open space and landscaping. Outline application including access with all other matters reserved.
As published by the council, reference DOC23/00095
Application record
- Reference
- DOC23/00095
- Type
- Discharge of Conditions
- Status
- Decided
- Decision
- Withdrawn
- Received
- 16 Mar 2023
- Validated
- 16 Mar 2023
- Decided
- 26 May 2023
- Ward
- Charlton And Cribbs
- Parish
- Almondsbury Parish Council
- Decision by
- Fully Delegated
Site history
Applications at this address on the South Gloucestershire register
This site has had 5 applications since 2023: 1 approved, 0 refused.
-
DOC26/00337 Awaiting decision
Land At Wyck Beck Road And Fishpool Hill Patchway Cribbs Causeway Bristol South Gloucestershire
Discharge of conditions 18 (Solar PV Details) and 19 (Thermal Assessment) attached to planning permission P24/02113/RM. Approval of Reserved Matters, to be read in conjunction with outline permission PT12/1930/O, for the erection of 147 no. new dwellings, setting out of public open space, including a leap, 2 no. allotments and associated landscaping, and infrastructure at parcels H8, H9, H10 and H11 with appearance, landscaping, layout, and scale to be determined.
-
DOC26/00263 Granted
Land At Wyck Beck Road And Fishpool Hill Patchway Cribbs Causeway Bristol South Gloucestershire
Discharge of conditions 2(Archaeology WSI), 3(Archaeology Recording) and 9(Samples) attached to planning permission P24/02113/RM Approval of Reserved Matters, to be read in conjunction with outline permission PT12/1930/O, for the erection of 147 no. new dwellings, setting out of public open space, including a leap, 2 no. allotments and associated landscaping, and infrastructure at parcels H8, H9, H10 and H11 with appearance, landscaping, layout, and scale to be determined.
-
DOC25/00175 Awaiting decision
Land At Wyck Beck Road And Fishpool Hill Patchway Cribbs Causeway Bristol South Gloucestershire
Discharge of conditions 8 (Phasing Plan) , 13 (Archaeology), 14 (Waste Management Audit), 15 (Drainage Masterplan), 17 (Flood Risk Assessment), 23 Ecological Mitigation Strategy), 24 (Hare/Hedgehogs), 25 (LEMP), 26 (Qualified Ecological Contractor), 27 (Badgers), 34 (Energy Statement), 35 (Waste and Recysling Strategy), 36 (Internet), 38 (Affordable Housing Phases) and 40 (Noise) attached to planning permission PT12/1930/O. Mixed use development across 53.80 hectares of land comprising up to 1,100 new dwellings (Use Class C3) a local centre (Use Classes A1,A2,A3,A4, A5,B1,D1,D2) a primary school together with supporting infrastructure and facilities including: new vehicular access with Wyck Beck Road, public open space and landscaping. Outline application including access with all other matters reserved.
-
P24/02466/RM Awaiting decision
Land At Wyck Beck Road And Fishpool Hill Patchway, Cribbs Causeway Bristol South Gloucestershire
Erection of 2no. buildings to form mixed-use Local Centre to comprise 1,077m2of retail floorspace (Class A1/A2/A3/A4/A5/B1/B), community use floor space (D1 and D2) and 36 no. dwellings, with car parking, landscaping and infrastructure works with appearance, landscaping, layout, and scale to be determined (Approval of reserved matters to be read in conjunction with planning permission PT12/1930/O).
Timeline
Dates from the published record
-
16 Mar 2023
Received by South Gloucestershire
-
26 May 2023
Decision issued: Withdrawn
-
3 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before South Gloucestershire decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land At Wyck Beck Road And Fishpool Hill Patchway Cribbs Causeway Bristol South Gloucestershire
100% historically approved · decision due ~1 Aug
Discharge of conditions 8 (Phasing Plan) , 13 (Archaeology), 14 (Waste Management Audit), 15 (Drainage Masterplan), 17 (Flood Risk Assessment), 23 Ecological Mitigation Strategy), 24 (Hare/Hedgehogs), 25 (LEMP), 26 (Qualified Ecological Contractor), 27 (Badgers), 34 (Energy Statement), 35 (Waste and Recysling Strategy), 36 (Internet), 38 (Affordable Housing Phases) and 40 (Noise) attached to planning permission PT12/1930/O. Mixed use development across 53.80 hectares of land comprising up to 1,100 new dwellings (Use Class C3) a local centre (Use Classes A1,A2,A3,A4, A5,B1,D1,D2) a primary school together with supporting infrastructure and facilities including: new vehicular access with Wyck Beck Road, public open space and landscaping. Outline application including access with all other matters reserved.
Awaiting decision Conditions New dwelling 40 docsMajor scheme -
Land At Wyck Beck Road And Fishpool Hill Patchway Cribbs Causeway South Gloucestershire
100% historically approved · decision due ~23 Jul
Discharge of conditions 6, 7, 12, 29, 30 and 32 attached to Planning Permission PT12/1930/O. Mixed use development across 53.80 hectares of land comprising up to 1,100 new dwellings (Use Class C3) a local centre (Use Classes A1,A2,A3,A4, A5,B1,D1,D2) a primary school together with supporting infrastructure and facilities including: new vehicular access with Wyck Beck Road, public open space and landscaping. Outline application including access with all other matters reserved.
Awaiting decision Conditions New dwelling 54 docsMajor scheme -
Land At Wyck Beck Road And Fishpool Hill Fishpool Hill Patchway Bristol Cribbs Causeway
Siting of 1no. sales cabin for the temporary period of 2 years.
Withdrawn Full applications 17 docs -
Land At Wyck Beck Road And Fishpool Hill Patchway, Cribbs Causeway Bristol South Gloucestershire
88% historically approved · decision due ~24 Jan
Erection of 2no. buildings to form mixed-use Local Centre to comprise 1,077m2of retail floorspace (Class A1/A2/A3/A4/A5/B1/B), community use floor space (D1 and D2) and 36 no. dwellings, with car parking, landscaping and infrastructure works with appearance, landscaping, layout, and scale to be determined (Approval of reserved matters to be read in conjunction with planning permission PT12/1930/O).
Awaiting decision Reserved matters 171 docsMajor scheme -
15 Telford Way Almondsbury South Gloucestershire BS10 7UW
Erection of single storey outbuilding to form gym.
Granted Householder 11 docsSmall domestic -
Land At Wyck Beck Road And Fishpool Hill Brentry South Gloucestershire BS10 6SW
Erection of 1 no. electrical substation with parking for 1no. maintenance vehicle with associated works.
Granted Full applications 15 docs
Other condition discharge and variation applications
In South Gloucestershire
-
DOC26/00264 Granted
Units 4 And 14 Stover Road Yate South Gloucestershire BS37 5JN
Discharge of condition 5 (Landscaping) attached to planning permission P25/02882/RVC Variation of condition 2 attached to planning permission P25/00447/F to make alterations to the approved plans - Demolition of existing body-repair workshop and erection of new body-repair workshop and storage area (Class B2) with associated works, including laying of hard surface area to form additional car parking.
-
DOC26/00367 Awaiting decision
Henfield Farm The Hollows Coalpit Heath South Gloucestershire BS36 2UU
Discharge of conditions 7 (Coal), 9 (Lighting Design) and 10 (Ecological Enhancement Plan) attached to Planning Permission P21/05739/F. Demolition of existing commercial buildings. Erection of 5no. detached dwellings with associated works.
-
DOC26/01462 Granted
1120 Park Avenue Aztec West Almondsbury South Gloucestershire BS32 4SX
Discharge of condition 5 (LEMP) attached to planning consent P25/01889/F - Refurbishment and roof-level renovation of the main facility, including the replacement of mechanical and electrical (plant and installation of associated rooftop and lower-ground screening enclosures.
-
DOC26/00365 Awaiting decision
Land West Of Iron Acton Substation Latteridge Lane Iron Acton South Gloucestershire BS35 3TF
Discharge of condition 9 (Archaeology Scheme of Written Investigation) attached to Planning Permission P23/02405/F. Formation of Battery Energy Storage System (BESS), with substation, associated infrastructure, fencing, security, access road, landscaping, and associated works.
-
DOC26/00162 Granted
Former Avlon Works Severn Road Hallen South Gloucestershire
Discharge of Condition 9 (AEMP) attached to planning permission P25/00232/RVC. Variation of condition 18 attached to permission P21/06880/F to vary the extent of last mile distribution floorspace. (Hybrid planning application, comprising of full planning permission for raising of site levels and associated enabling works to create pre-development plateau; and outline planning permission for erection of strategic employment development comprising of industrial (Class B2) and/or storage and distribution (Class B8) with ancillary office space, external yards, parking and associated works, with access to be determined and all other matters reserved).