Skip to content
PlanIndex Get alerts
Menu

Planning application

Jireh Chapel Malling Street Lewes East Sussex BN7 2RD

Decided South Downs National Park SDNP/26/01257/LIS

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Internal and external repairs, reinstatement of internal WC, installation of Baptistry and temporary netting beneath the barrel vaulted ceiling

As published by the council, reference SDNP/26/01257/LIS

Application record

Reference
SDNP/26/01257/LIS
Status
Application Determined
Received
31 Mar 2026
Validated
31 Mar 2026
Postcode
BN7 2RD

Timeline

Dates from the published record

  1. 31 Mar 2026

    Received by South Downs National Park

  2. 11 Sep 2026

    Added to PlanIndex

After the decision

South Downs National Park has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on South Downs National Park's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • 3 Malling Street Lewes East Sussex BN7 2RA

    SDNP/26/02058/LIS Submitted 27 May 2026 50 yards away

    92% historically approved · decision due ~28 Jul

    Remove existing flat roof to kitchen extension and replace with a glazed pitched roof and a smaller flat roof patio area, remove outside staircase and reconfigure existing brick steps. Steel-framed glazed Crittal doors to extension. Removal of fake chimney breast and internal alterations to ground floor. At first floor level, remove fake beams to modern partition wall and demolish dumb waiter shaft, and installation of Crittal doors to rear elevation. Installation of first-floor windows to side elevation. Remove render from rear elevation to expose flint wall

    Awaiting decision Extension Demolition +1
  • 3 Malling Street Lewes East Sussex BN7 2RA

    SDNP/26/02057/HOUS Submitted 27 May 2026 50 yards away

    92% historically approved · decision due ~28 Jul

    Remove existing flat roof to kitchen extension and replace with a glazed pitched roof and a smaller flat roof patio area, remove outside staircase and reconfigure existing brick steps. Steel-framed glazed Crittal doors to extension. Removal of fake chimney breast and internal alterations to ground floor. At first floor level, remove fake beams to modern partition wall and demolish dumb waiter shaft, and installation of Crittal doors to rear elevation. Installation of first-floor windows to side elevation. Remove render from rear elevation to expose flint wall

    Awaiting decision Extension Demolition +1
  • 49A Cliffe High Street Lewes East Sussex BN7 2AN

    SDNP/26/01991/DCOND Submitted 20 May 2026 100 yards away

    92% historically approved · decision due ~15 Jul

    Discharge of Condition 4 (Method statement) for SDNP/26/00510/FUL.

    Decided
  • 9 Cliffe High Street Lewes East Sussex BN7 2AH

    SDNP/26/02163/LIS Submitted 27 May 2026 100 yards away

    92% historically approved · decision due ~3 Aug

    Retrospective replacement of shopfront sign (resubmission of SDNP/25/03083/LIS) (amendments to SDNP/26/00783/LIS)

    Decided Windows or glazing
  • The Brewery Shop The Bridge Wharf Brewery 4 - 6 Cliffe High Street Lewes East Sussex BN7 2AH

    SDNP/26/02076/NMA Submitted 27 May 2026 100 yards away

    88% historically approved · decision due ~27 Jul

    Non-Material Amendment to Planning Approval SDNP/25/00929/FUL to include change of use of part of ground floor and upper floors from ancillary office and staff accommodation to Visitor Accommodation/Use Class C1 (first floor) and ancillary staff accommodation (second floor)

    Decided Amendments
  • 2 Cliffe High Street Lewes East Sussex BN7 2AH

    SDNP/26/02273/DCOND Submitted 9 Jun 2026 100 yards away

    92% historically approved · decision due ~4 Aug

    Discharge of Conditions 5 (CEMP), 11 (Sustainable Construction), 12 (Landscaping), 13 (External lighting), 14 ( Dark Skies Mitigation), 15 (Cycle Parking) and Partial Discharge of Condition 9 (Criteria iii), iv) v) vi) and vii)) (Schedule of Works) in relation to SDNP/25/00928/FUL

    Awaiting decision