Skip to content
PlanIndex Get alerts
Menu

Archive · South Cambridgeshire · 2025

Planning applications in South Cambridgeshire, July 2025

Page 2 of 2, newest first. Back to the first page for July 2025.

Applications, July 2025

Newest first ยท page 2 of 2

  • 24/03783/COND7 Granted

    Land North Of Cherry Hinton Coldhams Lane Cambridge CB1 3LG

    Submission of details required by condition 7 (hard and soft landscaping scheme - blocks 4a, b and c) of planning permission 24/03783/S73

    Submitted 1 Jul 2025 Conditions
  • 25/02599/REM Granted

    Pumping Station 1 Land North Of Cherry Hinton Road Cambridge

    Reserved Matters Application for landscaping, access, appearance, layout and scale following outline planning permission S/1231/18/OL and 22/01966/S73 for landscaping and storage tank associated with pumping station 1. The outline planning application was EIA development and was accompanied by an environmental statement.

    Submitted 1 Jul 2025 Reserved matters
  • 25/02584/HFUL Granted

    9 Fowlmere Road Heydon Cambridgeshire SG8 8PT

    Extension to rear of existing outbuilding with alterations to roof and installation of roof lights

    Submitted 1 Jul 2025 Householder
  • 25/02600/REM Awaiting decision

    Land West Of Station Road Longstanton Cambridgeshire

    Reserved matters application for details of the appearance, means of access, landscaping, layout and scale of commercial/community unit (Class E & F1) with parking areas, landscaping and all associated infrastructure pursuant to conditions 1 and 2 of outline application ref: 20/03598/OUT. Including details to discharge conditions 9 (hard and soft landscaping scheme), 13 (waste Management and Minimisation Strategy), 17 (Arboricultural Method Statement and Tree Protection Strategy), 26 (layout of the site including roads, footways, cycleways, buildings, visibility splays, parking provision and surface water drainage), 35 (surface water drainage scheme), 36 (long term maintenance arrangements for surface water drainage system), 37 (foul drainage), 38 (finished floor levels), 40 (Sustainability Statement), and 46 (artificial lighting scheme).

    Submitted 1 Jul 2025 Reserved matters

Other months in 2025

All of 2025