Skip to content
PlanIndex Get alerts
Menu

Planning application

Parcels 5.1, 5.2 And 5.3, Key Phase 1 Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire CB25 9PA

Granted South Cambridgeshire 25/01016/REM Approval of Reserved Matters

Works: Demolition Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Reserved matters approval of access, appearance, landscape, layout and scale for the construction of 90 dwellings at Parcels 5.1, 5.2 and 5.3 at Key Phase 1 of the Waterbeach Barracks and Airfield development pursuant to Condition 3 of the outline planning consent ref: S/0559/17/OL including: access junctions, access roads, parking, land reprofiling, utilities infrastructure including alignment of service runs, foul and surface water drainage infrastructure, street lighting, areas of open space and public realm including ecological mitigation, soft and hard landscaping, planting, productive landscape, footways / cycleways, boundary treatments, street furniture, any necessary temporary stockpiling of construction materials, areas for construction use, temporary haul routes and any necessary demolition

As published by the council, reference 25/01016/REM

Application record

Reference
25/01016/REM
Type
Approval of Reserved Matters
Status
Decided
Decision
Granted As published: Granted Permission
Received
14 Mar 2025
Validated
14 Mar 2025
Decided
8 Jul 2025
Ward
Milton & Waterbeach
Parish
Waterbeach CP
Decision by
Delegated Decision
Postcode
CB25 9PA

Site history

Applications at this address on the South Cambridgeshire register

This site has had 8 applications since 2025: 5 approved, 0 refused.

  • 25/01016/COND2A Awaiting decision

    Parcels 5.1, 5.2 And 5.3, Key Phase 1 Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire CB25 9PA

    Submission of details required by condition 2 (Materials) of Reserved Matters application 25/01016/REM

    Submitted 22 Sep 2026 Conditions
  • 25/01016/COND3A Awaiting decision

    Parcels 5.1, 5.2 And 5.3, Key Phase 1 Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire CB25 9PA

    Submission of details required by condition 3 (Materials) of Reserved Matters application 25/01016/REM

    Submitted 22 Sep 2026 Conditions
  • 25/01016/COND8 Awaiting decision

    Parcels 5.1, 5.2 And 5.3, Key Phase 1 Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire CB25 9PA

    Submission of details required by condition 8 (Boundary Treatment) of reserved matters application 25/01016/REM

    Submitted 7 Aug 2026 Conditions
  • 25/01016/COND10 Granted

    Parcels 5.1, 5.2 And 5.3, Key Phase 1 Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire CB25 9PA

    Submission of details required by condition 10 (Finished Floor Levels) of reserved matters application 25/01016/REM

    Decided 17 Sep 2026 Conditions
  • 25/01016/NMA2 Granted

    Parcels 5.1, 5.2 And 5.3, Key Phase 1 Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire CB25 9PA

    Non material amendment on application 25/01016/REM for amendment to affordable housing tenure mix.

    Decided 27 Apr 2026 Amendments
  • 25/01016/COND2 Granted

    Parcels 5.1, 5.2 And 5.3, Key Phase 1 Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire CB25 9PA

    Submission of details required by condition 2 (base course level) of Reserved Matters application 25/01016/REM

    Decided 5 Aug 2026 Conditions
  • 25/01016/COND3 Granted

    Parcels 5.1, 5.2 And 5.3, Key Phase 1 Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire CB25 9PA

    Submission of details required by condition 3 (materials, material treatment and architectural designs - Key Corner Buildings) of Reserved Matters application 25/01016/REM

    Decided 17 Aug 2026 Conditions

Timeline

Dates from the published record

  1. 14 Mar 2025

    Received by South Cambridgeshire

  2. 8 Jul 2025

    Decision issued: Granted Permission

  3. 12 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

2 later applications on the register refer to this one:

  • 25/01016/COND2A Awaiting decision

    Parcels 5.1, 5.2 And 5.3, Key Phase 1 Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire CB25 9PA

    Submission of details required by condition 2 (Materials) of Reserved Matters application 25/01016/REM

    Submitted 22 Sep 2026 Conditions
  • 25/01016/COND3A Awaiting decision

    Parcels 5.1, 5.2 And 5.3, Key Phase 1 Waterbeach Barracks Denny End Road Waterbeach Cambridgeshire CB25 9PA

    Submission of details required by condition 3 (Materials) of Reserved Matters application 25/01016/REM

    Submitted 22 Sep 2026 Conditions
  • Application: S/0559/17/OL (Decided)

Who's behind it

Company information only, from the register and Companies House

David Lock Associates Ltd Agent, registered in Milton Keynes

Active · incorporated 1989 · Milton Keynes

388 applications on PlanIndex · across 32 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

192 documents on file for this application

  • DELEGATED REPORT Application Committee / Delegated Report · 08 Jul 2025
  • DECISION NOTICE Application Decision Notice · 08 Jul 2025
  • DELEGATED REPORT Application Committee / Delegated Report · 04 Jul 2025
  • AMENDED HOUSETYPE 4 (VARIATION 4) Application Information · 26 Jun 2025
  • AMENDED HOUSETYPE 4 (VARIATION 4) Application Information · 26 Jun 2025
  • AMENDED HOUSETYPE 4 (VARIATION 1)) Application Information · 26 Jun 2025
  • AMENDED HOUSETYPE 4 (CORE) Application Information · 26 Jun 2025
  • AMENDED HOUSETYPE 3B (CORE) Application Information · 26 Jun 2025
  • AMENDED HOUSETYPE (VARIATION3) Application Information · 26 Jun 2025
  • AMENDED HOUSETYPE 2A (CORE) Application Information · 26 Jun 2025
  • VIEW 5 Application Information · 26 Jun 2025
  • VIEW 4 Application Information · 26 Jun 2025
  • VIEW 1 Application Information · 26 Jun 2025
  • 5.1 SITE ELEVATIONS Application Information · 26 Jun 2025
  • 5.2 SITE ELEVATIONS Application Information · 26 Jun 2025
  • 5.1 SITE ELEVATIONS Application Information · 26 Jun 2025
  • AMENDED PROPOSED MATERIALS Application Information · 26 Jun 2025
  • AMENDED CAR AND CYCLE PARKING PLAN Application Information · 26 Jun 2025
  • AMENDED ACCESS AND REFUSE PLAN Application Information · 26 Jun 2025
  • AMENDED BUILDING HEIGHTS Application Information · 26 Jun 2025
  • AMENDED ROOF LAYOUT Application Information · 26 Jun 2025
  • PROPOSED TENURE Application Information · 26 Jun 2025
  • PROPOSED BLOCK PLAN Application Information · 26 Jun 2025
  • AMENDED PROPOSED MASTERPLAN Application Information · 26 Jun 2025
  • DETAILED PLANTING PROPOSALS - 3 OF 3 Application Information · 26 Jun 2025
  • DETAILED PLANTING PROPOSALS - 2 OF 3 Application Information · 26 Jun 2025
  • DETAILED PLANTING PROPOSALS - 1 OF 3 Application Information · 26 Jun 2025
  • DETAILED HARD LANDSCAPING PROPOSALS - 3 OF 3 Application Information · 26 Jun 2025
  • DETAILED HARD LANDSCAPING PROPOSALS - 2 OF 3 Application Information · 26 Jun 2025
  • DETAILED HARD LANDSCAPING PROPOSALS - 1 OF 3 Application Information · 26 Jun 2025
  • LANDSCAPE MASTERPLAN Application Information · 26 Jun 2025
  • LANDSCAPE DETAILS - SURFACING & BOUNDARY TREATMENTS Application Information · 26 Jun 2025
  • STANDARD DRAINAGE DETAILS Application Information · 26 Jun 2025
  • FOUL WATER DRAINAGE LAYOUT SHEET 3 Application Information · 26 Jun 2025
  • FOUL WATER DRAINAGE LAYOUT SHEET 2 Application Information · 26 Jun 2025
  • FOUL WATER DRAINAGE LAYOUT SHEET 1 Application Information · 26 Jun 2025
  • SURFACE WATER DRAINAGE LAYOUT SHEET 3 Application Information · 26 Jun 2025
  • SURFACE WATER DRAINAGE LAYOUT SHEET 2 Application Information · 26 Jun 2025
  • SURFACE WATER DRAINAGE LAYOUT SHEET 1 Application Information · 26 Jun 2025
  • ADOPTABLE LIGHTING DESIGN SHEET 3 Application Information · 26 Jun 2025
  • ADOPTABLE LIGHTING DESIGN SHEET 2 Application Information · 26 Jun 2025
  • ADOPTABLE LIGHTING DESIGN SHEET 1 Application Information · 26 Jun 2025
  • FIRE HYDRANT LOCATION SHEET 3 Application Information · 26 Jun 2025
  • FIRE HYDRANT LOCATION SHEET 2 Application Information · 26 Jun 2025
  • FIRE HYDRANT LOCATION SHEET 1 Application Information · 26 Jun 2025
  • REFUSE STRATEGY DETAILS SHEET 2 Application Information · 26 Jun 2025
  • REFUSE STRATEGY DETAILS SHEET 1 Application Information · 26 Jun 2025
  • COMBINED UTILITIES PLAN SHEET 3 Application Information · 26 Jun 2025
  • COMBINED UTILITIES PLAN SHEET 2 Application Information · 26 Jun 2025
  • COMBINED UTILITIES PLAN SHEET 1 Application Information · 26 Jun 2025
  • VEHICLE TRACKING SHEET 3 Application Information · 26 Jun 2025
  • VEHICLE TRACKING SHEET 4 Application Information · 26 Jun 2025
  • VEHICLE TRACKING SHEET 2 Application Information · 26 Jun 2025
  • VEHICLE TRACKING CONTEXT PLAN Application Information · 26 Jun 2025
  • VEHICLE TRACKING SHEET 1 Application Information · 26 Jun 2025
  • GENERAL ARRANGEMENT Application Information · 26 Jun 2025
  • VISIBILITY SPLAYS SHEET 3 Application Information · 26 Jun 2025
  • VISIBILITY SPLAYS SHEET 2 Application Information · 26 Jun 2025
  • VISIBILITY SPLAYS SHEET 1 Application Information · 26 Jun 2025
  • ADOPTION PLAN SHEET 3 Application Information · 26 Jun 2025
  • ADOPTION PLAN SHEET 2 Application Information · 26 Jun 2025
  • ADOPTION PLAN SHEET 1 Application Information · 26 Jun 2025
  • SITE WASTE MANAGEMENT PLAN Application Information · 26 Jun 2025
  • AFFORDABLE HOUSING SCHEME Application Information · 26 Jun 2025
  • DESIGN AND ACCESS SCHEME Application Information · 26 Jun 2025
  • 5.3 RESULTS - FEH-22 WITH SENSITIVITY CHECK Application Information · 26 Jun 2025
  • 5.2 RESULTS - FEH-22 WITH SENSITIVITY CHECK Application Information · 26 Jun 2025
  • 5.1 RESULTS - FEH-22 WITH SENSITIVITY CHECK Application Information · 26 Jun 2025
  • LOCATION PLAN Application Information · 26 Jun 2025
  • APPLICATION PLAN Application Information · 26 Jun 2025
  • HOUSING STRATEGY Consultee Comments · 14 Apr 2025
  • LLFA Consultee Comments · 10 Apr 2025
  • ENVIRONMENTAL HEALTH Consultee Comments · 10 Apr 2025
  • LANDSCAPE Consultee Comments · 10 Apr 2025
  • URBAN DESIGN Consultee Comments · 09 Apr 2025
  • SUSTAINABILITY Consultee Comments · 08 Apr 2025
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 03 Apr 2025
  • ECOLOGY Consultee Comments · 02 Apr 2025
  • CONTAMINATED LAND Consultee Comments · 02 Apr 2025
  • CAMBRIDGESHIRE FIRE & RESCUE SERVICE Consultee Comments · 28 Mar 2025
  • WASTE - SHARED SERVICE Consultee Comments · 25 Mar 2025
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 20 Mar 2025
  • SITE NOTICE Application Press/Site Notices · 20 Mar 2025
  • SITE NOTICE Application Press/Site Notices · 20 Mar 2025
  • SITE NOTICE Application Press/Site Notices · 20 Mar 2025
  • SITE NOTICE Application Press/Site Notices · 20 Mar 2025
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 14 Mar 2025
  • FEE CALCULATION Application Information · 14 Mar 2025
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 14 Mar 2025
  • ADOPTION PLAN SHEET 3 Drawings · 14 Mar 2025
  • VISIBILITY SPLAYS SHEET 2 Drawings · 14 Mar 2025
  • VISIBILITY SPLAYS SHEET 1 Drawings · 14 Mar 2025
  • VISIBILITY SPLAYS SHEET 3 Drawings · 14 Mar 2025
  • VEHICLE TRACKING CONTEXT PLAN Drawings · 14 Mar 2025
  • VEHICLE TRACKING SHEET 1 Drawings · 14 Mar 2025
  • VEHICLE TRACKING SHEET 2 Drawings · 14 Mar 2025
  • ADOPTION PLAN SHEET 1 Drawings · 14 Mar 2025
  • GENERAL ARRANGEMENT Drawings · 14 Mar 2025
  • COMBINED UTILITIES PLAN SHEET 2 Drawings · 14 Mar 2025
  • ADOPTION PLAN SHEET 2 Drawings · 14 Mar 2025
  • REFUSE STRATEGY DETAILS SHEET 1 Drawings · 14 Mar 2025
  • REFUSE STRATEGY DETAILS SHEET 2 Drawings · 14 Mar 2025
  • FIRE HYDRANT LOCATION SHEET 1 Drawings · 14 Mar 2025
  • FIRE HYDRANT LOCATION SHEET 2 Drawings · 14 Mar 2025
  • FIRE HYDRANT LOCATION SHEET 3 Drawings · 14 Mar 2025
  • SURFACE WATER DRAINAGE LAYOUT SHEET 1 Drawings · 14 Mar 2025
  • SURFACE WATER DRAINAGE LAYOUT SHEET 2 Drawings · 14 Mar 2025
  • VEHICLE TRACKING SHEET 3 Drawings · 14 Mar 2025
  • COMBINED UTILITIES PLAN SHEET 1 Drawings · 14 Mar 2025
  • FOUL WATER DRAINAGE LAYOUT SHEET 2 Drawings · 14 Mar 2025
  • COMBINED UTILITIES PLAN SHEET 3 Drawings · 14 Mar 2025
  • STANDARD DRAINAGE DETAILS Drawings · 14 Mar 2025
  • DRAINAGE STRATEGY Application Information · 14 Mar 2025
  • EXTERNAL LIGHTING LAYOUT Drawings · 14 Mar 2025
  • SURFACE WATER DRAINAGE LAYOUT SHEET 3 Drawings · 14 Mar 2025
  • SITE WASTER MANAGEMENT PLAN Application Information · 14 Mar 2025
  • TRAVEL PLAN Application Information · 14 Mar 2025
  • LANDSCAPE DETAILS SURFACING BOUNDARY TREATMENTS Drawings · 14 Mar 2025
  • LANDSCAPE DETAILS TREE PLANTING Drawings · 14 Mar 2025
  • LANDSCAPE DETAILS LANDSCAPE SPECIFICATION PLANTING Drawings · 14 Mar 2025
  • TREE SURVEY AND METHOD STATEMENT Application Survey / Assessment / Statement · 14 Mar 2025
  • ECOLOGICAL IMPLEMENTATION AND MITIGATION PLAN Application Information · 14 Mar 2025
  • 5 YEAR LANDSCAPE AND ECOLOGY MAINTENANCE AND MANAGEMENT PLAN Application Information · 14 Mar 2025
  • LANDSCAPE MASTERPLAN Drawings · 14 Mar 2025
  • DETAILED HARD LANDSCAPE PROPOSALS 1 OF 3 Drawings · 14 Mar 2025
  • DETAILED HARD LANDSCAPE PROPOSALS 2 OF 3 Drawings · 14 Mar 2025
  • DETAILED HARD LANDSCAPE PROPOSALS 3 OF 3 Drawings · 14 Mar 2025
  • DETAILED PLANTING PROPOSALS 1 OF 3 Drawings · 14 Mar 2025
  • DETAILED PLANTING PROPOSALS 2 OF 3 Drawings · 14 Mar 2025
  • DETAILED PLANTING PROPOSALS 3 OF 3 Drawings · 14 Mar 2025
  • SITE SOILING PLAN Drawings · 14 Mar 2025
  • FOUL WATER DRAINAGE LAYOUT SHEET 1 Drawings · 14 Mar 2025
  • EXTERNAL LIGHTING REPORT Application Information · 14 Mar 2025
  • FOUL WATER DRAINAGE LAYOUT SHEET 3 Drawings · 14 Mar 2025
  • COVERING LETTER Application Information · 14 Mar 2025
  • SURFACE WATER DRAINAGE LAYOUT SHEET 1 Drawings · 14 Mar 2025
  • SURFACE WATER DRAINAGE LAYOUT SHEET 2 Drawings · 14 Mar 2025
  • EXTERNAL LIGHTING LAYOUT Drawings · 14 Mar 2025
  • FOUL WATER DRAINAGE LAYOUT SHEET 1 Drawings · 14 Mar 2025
  • FOUL WATER DRAINAGE LAYOUT SHEET 2 Drawings · 14 Mar 2025
  • FOUL WATER DRAINAGE LAYOUT SHEET 3 Drawings · 14 Mar 2025
  • PARCEL 5.1 RESULTS Application Information · 14 Mar 2025
  • PARCEL 5.2 RESULTS Application Information · 14 Mar 2025
  • PARCEL 5.3 RESULTS Application Information · 14 Mar 2025
  • SURFACE WATER DRAINAGE LAYOUT SHEET 3 Drawings · 14 Mar 2025
  • DAS PART1 Design and Access Statement · 14 Mar 2025
  • DAS PART2 Design and Access Statement · 14 Mar 2025
  • DAS PART3 Design and Access Statement · 14 Mar 2025
  • DAS PART4 Design and Access Statement · 14 Mar 2025
  • PROPOSED MASTERPLAN Drawings · 14 Mar 2025
  • PROPOSED BLOCK PLAN Drawings · 14 Mar 2025
  • PROPOSED TENURE Drawings · 14 Mar 2025
  • ROOF LAYOUT PLAN Drawings · 14 Mar 2025
  • BUILDING HEIGHTS SITE PLAN Drawings · 14 Mar 2025
  • ACCESS AND REFUSE PLAN Drawings · 14 Mar 2025
  • CAR AND CYCLE PARKING PLAN Drawings · 14 Mar 2025
  • PROPOSED MATERIALS Drawings · 14 Mar 2025
  • PARCEL 5.1 SITE ELEVATIONS Drawings · 14 Mar 2025
  • PARCEL 5.2 SITE ELEVATIONS Drawings · 14 Mar 2025
  • PARCEL 5.3 SITE ELEVATIONS Drawings · 14 Mar 2025
  • VIEW 1 Drawings · 14 Mar 2025
  • VIEW 2 Drawings · 14 Mar 2025
  • VIEW 3 Drawings · 14 Mar 2025
  • VIEW 4 Drawings · 14 Mar 2025
  • VIEW 5 Drawings · 14 Mar 2025
  • VIEW 6 Drawings · 14 Mar 2025
  • TYPE 2 HOUSETYPE (CORE) Drawings · 14 Mar 2025
  • TYPE 2A HOUSETYPE (CORE) Drawings · 14 Mar 2025
  • TYPE 2A HOUSETYPE (VARIATION 1) Drawings · 14 Mar 2025
  • TYPE 2A HOUSETYPE (VARIATION 2) Drawings · 14 Mar 2025
  • TYPE 2A(H) MID HOUSETYPE (CORE) Drawings · 14 Mar 2025
  • TYPE 2A(H) END HOUSETYPE (VARIATION 1) Drawings · 14 Mar 2025
  • TYPE 3 HOUSETYPE (CORE) Drawings · 14 Mar 2025
  • TYPE 3A HOUSETYPE (CORE) Drawings · 14 Mar 2025
  • TYPE 3A(H) MID HOUSETYPE (CORE) Drawings · 14 Mar 2025
  • TYPE 3A(H) END HOUSETYPE (VARIATION 1) Drawings · 14 Mar 2025
  • TYPE 3B HOUSETYPE (CORE) Drawings · 14 Mar 2025
  • TYPE 3B HOUSETYPE (VARIATION 1) Drawings · 14 Mar 2025
  • TYPE 3B HOUSETYPE (VARIATION 2) Drawings · 14 Mar 2025
  • TYPE 4 HOUSETYPE (CORE) Drawings · 14 Mar 2025
  • TYPE 4 HOUSETYPE (VARIATION 1) Drawings · 14 Mar 2025
  • TYPE 4 HOUSETYPE (VARIATION 2) Drawings · 14 Mar 2025
  • TYPE 4 HOUSETYPE (VARIATION 3) Drawings · 14 Mar 2025
  • PLANNING DESIGN CONFORMITY STATEMENT Application Survey / Assessment / Statement · 14 Mar 2025
  • AFFORDABLE HOUSING SCHEME Application Information · 14 Mar 2025
  • WASTE-MANAGEMENT-DESIGN-GUIDE-TOOLKIT Application Information · 14 Mar 2025
  • PARCELS 5-1 5-2 AND 5-3 RESERVED MATTERS APPLICATION PLAN Drawings · 14 Mar 2025
  • PARCELS 5-1 5-2 AND 5-3 RESERVED MATTERS SITE LOCATION PLAN Drawings · 14 Mar 2025
  • WATERBEACH CONSTRUCTION ENVIROMENT MANAGEMENT PLAN Application Information · 14 Mar 2025
  • SUSTAINABILITY CONFORMITY STATEMENT PAGE 1-49 Application Survey / Assessment / Statement · 14 Mar 2025
  • SUSTAINABILITY CONFORMITY STATEMENT PAGE 50-99 Application Survey / Assessment / Statement · 14 Mar 2025
  • SUSTAINABILITY CONFORMITY STATEMENT PAGE 100-167 Application Survey / Assessment / Statement · 14 Mar 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

South Cambridgeshire granted permission on 8 July 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About reserved matters applications

A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In South Cambridgeshire

  • 26/02776/REM Granted

    7 Honeysuckle Close Caxton Cambridgeshire CB23 3BB

    Reserved matters application for the layout, scale, appearance and landscaping of plot 7 following outline planning permission of 20/04704/OUT (Outline planning for the erection of up to nine self-build/custom-build dwellings and associated garaging with some matters reserved except for access from Rosemary Greene Close).

    Received 21 Jul, published by the council 31 Jul 2026 Reserved matters
  • 26/03515/REM Awaiting decision

    Northstowe Phase 2 Station Road Longstanton Cambridgeshire

    Reserved matters application for the approval of access, appearance, landscaping, layout and scale of a new access road and associated footways connecting Stirling Road to the proposed Town Hub, together with associated landscaping, highway infrastructure and parking following outline planning permission S/2011/14/OL, and the related partial discharge of outline conditions 9 (Design Code), 18 (Site Wide Surface Water Drainage Strategy), 19 (Drainage - Reserved Matters), 23 (Landscape and Design), 24 (Landscape Management and Maintenance Plan), 27 (Ecological Management Plan), 39 (Construction Environmental Management Plan), 41 (External Artificial Lighting) and 42 (Operational Noise) and 53 (Parking Management Strategy).

    Received 15 Sep, published by the council 25 Sep 2026 Reserved matters
  • 26/03440/REM Awaiting decision

    Northstowe Phase 2 Station Road Longstanton Cambridgeshire

    Reserved matters application for the approval of access, appearance, landscaping, layout and scale for Strategic Landscaping works to Pillbox Pool following outline planning permission S/2011/14/OL, and the related partial discharge of outline conditions 9 (Design Code), 18 (Site Wide Surface Water Drainage Strategy), 19 (Drainage - Reserved Matters), 23 (Landscape and Design), 24 (Landscape Management and Maintenance Plan), 27 (Ecological Management Plan), 30 (Management of Pillboxes), 39 (Construction Environmental Management Plan), 41 (External Artificial Lighting) and 42 (Operational Noise).

    Received 8 Sep, published by the council 25 Sep 2026 Reserved matters
  • 26/03359/REM Awaiting decision

    Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG

    Reserved matters application for approval of appearance, landscaping, layout and scale for the Installation of 1no. informal natural grass pitch and 2no. Multi-Use Games Areas enclosed with ball stop fencing for 2no. tennis courts (with line marking to accommodate netball and pickleball) together with associated landscaping, equipment storage and provision of new pathway to existing Woodland Walk following outline planning permission 22/00887/OUT (Outline application for the construction of student residential accommodation together will ancillary meeting, office and social space (maximum 14700sqm ), auditorium (maximum 1300sqm) replacement buildings and grounds maintenance workshops, one new and relocated sports pitch, additional ball-stop fencing, relocated tennis courts, a new vehicular access and replacement car park with some matters reserved except for access) as varied by 26/01599/S73 (S73 to vary condition 3 (approved drawings) of ref: 22/00887/OUT (Outline application for the construction of student residential accommodation together will ancillary meeting, office and social space (maximum 14700sqm ), auditorium (maximum 1300sqm) replacement buildings and grounds maintenance workshops, one new and relocated sports pitch, additional ball-stop fencing, relocated tennis courts, a new vehicular access and replacement car park with some matters reserved except for access) to update parameter landscape and land use plan.)

    Received 3 Sep, published by the council 6 Sep 2026 Reserved matters
  • 26/03381/REM Awaiting decision

    9 Soule Croft Gamlingay Cambridgeshire SG19 3FZ

    Plot 9 - Reserved matters application for access, appearance, landscaping, layout and scale for the construction of a self/custom build dwelling following outline planning permission 24/01080/OUT (Outline planning application with all matters reserved (except for access, layout of roads and plots) for nine self/custom build residential dwellings (replacement of planning permission S/3170/17/OL)

    Received 3 Sep, published by the council 9 Sep 2026 Reserved matters