Skip to content
PlanIndex Get alerts
Menu

Planning application

Agricultural Building To The Rear Of 38 Histon Road Cottenham Cambridgeshire

Granted South Cambridgeshire 25/00054/REM Approval of Reserved Matters

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Reserved matters application for the approval of appearance, landscape, layout and scale and the discharge of conditions 11 (Low Emission Strategy), Condition 12 (Provision of an updated Preliminary Ecology Appraisal), Condition 13 (Construction Ecological Management Plan), Condition 25 (Water Conversation Strategy), Condition 37 (Biodiversity Net Gain (BNG) Plan) and Condition 38 (Sustainability Statement) of outline planning permission 20/04906/OUT (Outline application for the erection of up to 34 new residential units as a Social Housing Rural Exception Site in the Greenbelt and new pedestrian footway with all matters reserved except for access from Histon Road).

As published by the council, reference 25/00054/REM

Application record

Reference
25/00054/REM
Type
Approval of Reserved Matters
Status
Decided
Decision
Granted As published: Granted Permission
Received
8 Jan 2025
Validated
15 Jan 2025
Decided
24 Sep 2025
Ward
Cottenham
Parish
Cottenham CP
Decision by
Committee Decision (Area/Main)

Site history

Applications at this address on the South Cambridgeshire register

This site has had 5 applications since 2025: 3 approved, 0 refused.

  • 25/00054/CONDC Awaiting decision

    Agricultural Building To The Rear Of 38 Histon Road Cottenham Cambridgeshire

    Submission of details required by conditions 2 (external surfaces) and 4 (sample panel brickwork) of Reserved Matters application 25/00054/REM

    Submitted 2 Sep 2026 Conditions
  • 25/00054/CONDB Granted

    Agricultural Building To The Rear Of 38 Histon Road Cottenham Cambridgeshire

    Submission of details required by condition 16 (surface water drainage) of Reserved Matters application 25/00054/REM

    Decided 12 Aug 2026 Conditions
  • 26/01662/NMA1 Granted

    Agricultural Building To The Rear Of 38 Histon Road Cottenham Cambridgeshire

    Nonmaterial amendment on ref: 25/00054/REM for the alteration to the decorative brick detailing, reduction in the window head brick courses from four to three, replacement of the stone door surrounds to House Type 3A and Maisonettes 1 and 2 with a canopy, insertion of an additional window at first-floor level to Maisonette 2 and additional window in apartment block stair core.

    Decided 13 Aug 2026 Amendments
  • 25/00054/CONDA Awaiting decision

    Agricultural Building To The Rear Of 38 Histon Road Cottenham Cambridgeshire

    Submission of details required by condition 5 (boundary treatments), 6 (tree pits), 7 (landscape management), 14 (fire hydrants), 15 (water scheme for fire hydrants) of reserved matters application 25/00054/REM

    Submitted 29 Apr 2026 Conditions

Timeline

Dates from the published record

  1. 8 Jan 2025

    Received by South Cambridgeshire

  2. 15 Jan 2025

    Validated

    Checked as complete and ready for consideration.

  3. 24 Sep 2025

    Decision issued: Granted Permission

  4. 12 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 20/04906/OUT (Decided)

Who's behind it

Company information only, from the register and Companies House

Carter Jonas LLP Agent

1,102 applications on PlanIndex · across 146 councils · 89% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

182 documents on file for this application

  • DECISION NOTICE Application Decision Notice · 24 Sep 2025
  • COMMITTEE REPORT Application Committee / Delegated Report · 24 Sep 2025
  • EOT AGREED Agent / Applicant Comments · 23 Sep 2025
  • EOT REQUEST Extension of Time Request · 17 Sep 2025
  • COMMITTEE REPORT Application Committee / Delegated Report · 16 Sep 2025
  • ACCOMMODATION SCHEDULE Application Information · 08 Sep 2025
  • AGENT/APPLICANT PUBLIC SPEAKING LETTER Application Officer Correspondence · 01 Sep 2025
  • EOT AGREED Agent / Applicant Comments · 25 Aug 2025
  • PARISH Consultee Comments · 22 Aug 2025
  • EOT REQUEST Extension of Time Request · 21 Aug 2025
  • ECOLOGY Consultee Comments · 19 Aug 2025
  • SUNLIGHT TEST EXISTING MARCH 9AM-12NOON Application Information · 19 Aug 2025
  • SUNLIGHT TEST EXISTING MARCH 3-5PM Application Information · 19 Aug 2025
  • SUNLIGHT TEST PROPOSED MARCH 3-5PM Application Information · 19 Aug 2025
  • SUNLIGHT TEST PROPOSED MARCH 9AM-10AM Application Information · 19 Aug 2025
  • SUNLIGHT TEST PROPOSED MARCH 11AM-12NOON Application Information · 19 Aug 2025
  • ENVIRONMENTAL HEALTH Consultee Comments · 15 Aug 2025
  • TREES Consultee Comments · 14 Aug 2025
  • BNE LANDSCAPE Consultee Comments · 14 Aug 2025
  • HOUSING STRATEGY Consultee Comments · 14 Aug 2025
  • LOCAL LEAD FLOOD AUTHORITY COMMENTS Consultee Comments · 12 Aug 2025
  • ARCHAEOLOGY COMMENTS Consultee Comments · 11 Aug 2025
  • OLD WEST INTERNAL DRAINAGE BOARD Consultee Comments · 08 Aug 2025
  • URBAN DESIGN Consultee Comments · 08 Aug 2025
  • SUSTAINABILITY Consultee Comments · 08 Aug 2025
  • CONTAMINATED LAND Consultee Comments · 07 Aug 2025
  • DRAINAGE Consultee Comments · 06 Aug 2025
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 06 Aug 2025
  • POLICE ARCHITECTURAL LIAISON OFFICER Consultee Comments · 06 Aug 2025
  • ENVIRONMENTAL HEALTH Consultee Comments · 05 Aug 2025
  • ENVIRONMENT AGENCY Consultee Comments · 05 Aug 2025
  • CONDITION37 - BIODIVERSITY NET GAIN V5.0 Application Information · 31 Jul 2025
  • PROPOSED HIGHWAY WORKS Drawings · 31 Jul 2025
  • ILLUSTRATIVE MASTERPLAN Drawings · 31 Jul 2025
  • LANDSCAPE KEY PLAN Drawings · 31 Jul 2025
  • HARDWORKS PLAN (SHEET 1) Drawings · 31 Jul 2025
  • HARDWORKS PLAN (SHEET 2) Drawings · 31 Jul 2025
  • PLANTING PLAN (SHEET 1) Drawings · 31 Jul 2025
  • PLANTING PLAN (SHEET 2) Drawings · 31 Jul 2025
  • LANDSCAPE CHAPTER Design and Access Statement · 31 Jul 2025
  • TREE PIT DETAILS Drawings · 31 Jul 2025
  • COLOURED SITE LAYOUT - ROOF PLAN Drawings · 31 Jul 2025
  • PROPOSED SITE LAYOUT ROOF PLANTYPES - COMPRESSED Drawings · 31 Jul 2025
  • PROPOSED SITE LAYOUT - TENURE PLAN Drawings · 31 Jul 2025
  • PROPOSED SITE LAYOUT - PARKING PLAN Drawings · 31 Jul 2025
  • PROPOSED SITE LAYOUT - M4(2) UNITS - COMPRESSED Drawings · 31 Jul 2025
  • BNG METRIC CALCULATION Application Information · 31 Jul 2025
  • FILE COPY OF AMENDMENT LETTER Application Officer Correspondence · 31 Jul 2025
  • TREES Consultee Comments · 02 Jul 2025
  • SUSTAINABILITY Consultee Comments · 01 Jul 2025
  • ENVIRONMENTAL HEALTH Consultee Comments · 27 Jun 2025
  • HOUSING STRATEGY Consultee Comments · 27 Jun 2025
  • CLLR COMMENTS Third Party Comments · 27 Jun 2025
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 26 Jun 2025
  • BNE LANDSCAPE Consultee Comments · 26 Jun 2025
  • CLIMATE, WASTE & ENVIRONMENT Consultee Comments · 25 Jun 2025
  • ANGLIAN WATER Consultee Comments · 25 Jun 2025
  • DRAINAGE Consultee Comments · 24 Jun 2025
  • URBAN DESIGN Consultee Comments · 23 Jun 2025
  • INTERNAL DRAINAGE BOARD Consultee Comments · 23 Jun 2025
  • PARISH Consultee Comments · 20 Jun 2025
  • LLFA Consultee Comments · 20 Jun 2025
  • ECOLOGY Consultee Comments · 19 Jun 2025
  • ENVIRONMENTAL HEALTH Consultee Comments · 16 Jun 2025
  • NATURAL ENGLAND Consultee Comments · 13 Jun 2025
  • ARCHAEOLOGY Consultee Comments · 12 Jun 2025
  • CAMBS FIRE AND RESCUE Consultee Comments · 09 Jun 2025
  • UK HEALTH SECURITY AGENCY Consultee Comments · 09 Jun 2025
  • FILE COPY OF AMENDMENT LETTER Application Officer Correspondence · 06 Jun 2025
  • EOT REQUEST Extension of Time Request · 06 Jun 2025
  • TREE SURVEY AND ARBORICULTURAL IMPACT ASSESSMENT Application Survey / Assessment / Statement · 05 Jun 2025
  • PRELIM AIA Drawings · 05 Jun 2025
  • DESIGN & ACCESS STATEMENT Design and Access Statement · 05 Jun 2025
  • FRA & DRAINAGE STRATEGY REPORT - REVB Application Survey / Assessment / Statement · 05 Jun 2025
  • FRA APPENDIX A - TOPO SURVEY HISTON ROAD Drawings · 05 Jun 2025
  • FRA APPENDIX A - TOPO SURVEY SITE Drawings · 05 Jun 2025
  • FRA APPENDIX B - GREENFIELD RUNOFF RATE ESTIMATION Application Survey / Assessment / Statement · 05 Jun 2025
  • FRA APPENDIX C - DRAINAGE STRATEGY TO DITCH OUTFALL Drawings · 05 Jun 2025
  • FRA APPENDIX C - SITE DRAINAGE OUTFALL Drawings · 05 Jun 2025
  • FRA APPENDIX C - SUDS CONSTRUCTION DETAILS Drawings · 05 Jun 2025
  • FRA APPENDIX D - FEH DATA 1 IN 10 YEAR CONSECUTIVE EVENT CALCULATIONS Application Survey / Assessment / Statement · 05 Jun 2025
  • FRA APPENDIX D - FSR DATA 1 IN 10 YEAR CONSECUTIVE EVENT CALCULATIONS Application Survey / Assessment / Statement · 05 Jun 2025
  • FRA APPENDIX E - PRE APPLICATION CHECK LIST Application Survey / Assessment / Statement · 05 Jun 2025
  • FRA APPENDIX F - CAMBRIDGESHIRE SUDS PRO-FORMA Application Survey / Assessment / Statement · 05 Jun 2025
  • APARTMENT BLOCK ELEVATIONS AND PLANS Drawings · 05 Jun 2025
  • PROPOSED- WALK UP APARTMENTS Drawings · 05 Jun 2025
  • PROPOSED HOUSE TYPE C Drawings · 05 Jun 2025
  • PROPOSED HOUSETYPE C V2/V3 Drawings · 05 Jun 2025
  • PROPOSED HOUSETYPE D Drawings · 05 Jun 2025
  • PROPOSED HOUSETYPE E Drawings · 05 Jun 2025
  • PROPOSED HOUSETYPE F Drawings · 05 Jun 2025
  • PROPOSED HOUSETYPE C - TERRACE -V1 Drawings · 05 Jun 2025
  • PROPOSED HOUSETYPE B WALK UP APARTMENTS Drawings · 05 Jun 2025
  • PROPOSED LAYOUT TENURE PLAN Drawings · 05 Jun 2025
  • PROPOSED LAYOUT PARKING PLAN Drawings · 05 Jun 2025
  • DRAWING REGISTER Application Information · 05 Jun 2025
  • LOCATION PLAN Drawings · 05 Jun 2025
  • PROPOSED LAYOUT ROOF PLAN Drawings · 05 Jun 2025
  • PROPOSED LAYOUT PARKING-PLAN Drawings · 05 Jun 2025
  • EXTERNAL CYCLE STORE PLANS AND ELEVATIONS Drawings · 05 Jun 2025
  • PLOT 8 SECTION Drawings · 05 Jun 2025
  • PLOT 17-20 SECTION TO BOUNDARY Drawings · 05 Jun 2025
  • ENERGY STATEMENT REV B (PAGE 1-60) Application Survey / Assessment / Statement · 05 Jun 2025
  • ENERGY STATEMENT REV B (PAGE 61-110) Application Survey / Assessment / Statement · 05 Jun 2025
  • LOW EMISSION STRATEGY Application Survey / Assessment / Statement · 05 Jun 2025
  • OVERHEATING ASSESSMENT REV B PAGE 1-50 Application Survey / Assessment / Statement · 05 Jun 2025
  • OVERHEATING ASSESSMENT REV B PAGE 51-100 Application Survey / Assessment / Statement · 05 Jun 2025
  • OVERHEATING ASSESSMENT REV B PAGE 101-156 Application Survey / Assessment / Statement · 05 Jun 2025
  • PLANNING STATEMENT SCHEME AMENDMENTS MAY 2025(7953146.1) Application Survey / Assessment / Statement · 05 Jun 2025
  • SUSTAINABILITY STATEMENT REV C Application Survey / Assessment / Statement · 05 Jun 2025
  • TRANSPORT STATEMENT Application Survey / Assessment / Statement · 05 Jun 2025
  • COUNCILLOR EILEEN WILSON COMMENTS Consultee Comments · 25 Feb 2025
  • LEAD LOCAL FLOOD AUTHORITY Consultee Comments · 20 Feb 2025
  • URBAN DESIGN Consultee Comments · 17 Feb 2025
  • BNE LANDSCAPE Consultee Comments · 17 Feb 2025
  • SUSTAINABILITY Consultee Comments · 12 Feb 2025
  • ECOLOGY Consultee Comments · 06 Feb 2025
  • 34 HISTON ROAD Third Party Comments · 06 Feb 2025
  • TREES Consultee Comments · 06 Feb 2025
  • CLIMATE, WASTE & ENVIRONMENT Consultee Comments · 06 Feb 2025
  • LOCAL HIGHWAY AUTHORITY Consultee Comments · 04 Feb 2025
  • DRAINAGE Consultee Comments · 04 Feb 2025
  • ENVIRONMENT AGENCY Consultee Comments · 04 Feb 2025
  • ENVIRONMENT AGENCY Consultee Comments · 04 Feb 2025
  • DESIGNING OUT CRIME OFFICER Consultee Comments · 04 Feb 2025
  • CLIMATE, WASTE & ENVIRONMENT Consultee Comments · 30 Jan 2025
  • HOUSING STRATEGY Consultee Comments · 30 Jan 2025
  • FIRE & RESCUE SERVICES Consultee Comments · 28 Jan 2025
  • 2 COSSINGTON CLOSE Third Party Comments · 27 Jan 2025
  • CONTAMINATED LAND Consultee Comments · 27 Jan 2025
  • PARISH Consultee Comments · 24 Jan 2025
  • ACKNOWLEDGEMENT LETTER Application Officer Correspondence · 16 Jan 2025
  • MAP OF NOTIFIED NEIGHBOURS Neighbour/Consultee Notification List · 16 Jan 2025
  • SITE NOTICE Application Press/Site Notices · 16 Jan 2025
  • SITE NOTICE Application Press/Site Notices · 16 Jan 2025
  • ARCHAEOLOGICAL OFFICER Consultee Comments · 16 Jan 2025
  • INVALID LETTER Application Information · 15 Jan 2025
  • BNG METRIC CALCULATION Application Information · 15 Jan 2025
  • APPLICATION FORM - NO PERSONAL INFO Application Information · 08 Jan 2025
  • FEE CALCULATION Application Information · 08 Jan 2025
  • ATTACHMENT SUMMARY FROM PORTAL Attachment Summary · 08 Jan 2025
  • PROPOSED APARTMENTS Drawings · 08 Jan 2025
  • PROPOSED HOUSETYPE B Drawings · 08 Jan 2025
  • PROPOSED HOUSETYPE C Drawings · 08 Jan 2025
  • PROPOSED HOUSETYPE D Drawings · 08 Jan 2025
  • LOCATION PLAN Drawings · 08 Jan 2025
  • PROPOSED HOUSETYPE F Drawings · 08 Jan 2025
  • STREET SCENES Drawings · 08 Jan 2025
  • PART 2 OF 2 DESIGN AND ACCESS STATEMENT Design and Access Statement · 08 Jan 2025
  • PART 1 OF 2 DESIGN AND ACCESS STATEMENT Design and Access Statement · 08 Jan 2025
  • ACOUSTIC REPORT Application Information · 08 Jan 2025
  • CONSTRUCTION ECOLOGICAL MANAGEMENT PLAN Application Survey / Assessment / Statement · 08 Jan 2025
  • SCHEME OF ECOLOGY ENHANCEMENT Application Survey / Assessment / Statement · 08 Jan 2025
  • UPDATED PEA Application Survey / Assessment / Statement · 08 Jan 2025
  • PRELIM AIA Drawings · 08 Jan 2025
  • PROPOSED HOUSETYPE E Drawings · 08 Jan 2025
  • TREE SURVEY AND AIA Application Survey / Assessment / Statement · 08 Jan 2025
  • FRA AND DRAINAGE STRATEGY REPORT Application Survey / Assessment / Statement · 08 Jan 2025
  • FRA APPENDIX A TOPO SURVEY HISTON ROAD Drawings · 08 Jan 2025
  • FRA APPENDIX A TOPO SURVEY SITE Drawings · 08 Jan 2025
  • FRA APPENDIX B GREENFIELD RUNOFF RATE ESTIMATION Application Information · 08 Jan 2025
  • FRA APPENDIX C DRAINAGE STRATEGY Drawings · 08 Jan 2025
  • FRA APPENDIX C SUDS CONSTRUCTION DETAILS Drawings · 08 Jan 2025
  • FRA APPENDIX D FEH Application Information · 08 Jan 2025
  • FRA APPENDIX D FSR DATA Application Information · 08 Jan 2025
  • FRA APPENDIX E PRE APPLICATION CHECK LIST Application Information · 08 Jan 2025
  • FRA APPENDIX F CAMBRIDGESHIRE SUDS PRO-FORMA Application Information · 08 Jan 2025
  • TRANSPORT STATEMENT Application Survey / Assessment / Statement · 08 Jan 2025
  • SUSTAINABILITY STATEMENT Application Survey / Assessment / Statement · 08 Jan 2025
  • GA LANDSCAPE PLAN Drawings · 08 Jan 2025
  • GROUNDCOVER PLAN Drawings · 08 Jan 2025
  • MATERIALS AND FINISHES PLAN Drawings · 08 Jan 2025
  • LEGEND AND PLANTING SCHEDULE Drawings · 08 Jan 2025
  • TREE PLAN Drawings · 08 Jan 2025
  • PLANNING STATEMENT Application Survey / Assessment / Statement · 08 Jan 2025
  • LOW EMISSION STRATEGY PAGE 1-49 Application Information · 08 Jan 2025
  • LOW EMISSION STRATEGY PAGE 50-77 Application Information · 08 Jan 2025
  • ENERGY STATEMENT PAGE 1-50 Application Survey / Assessment / Statement · 08 Jan 2025
  • ENERGY STATEMENT PAGE 51-110 Application Survey / Assessment / Statement · 08 Jan 2025
  • OVERHEATING ASSESSMENT PAGE 1-49 Application Survey / Assessment / Statement · 08 Jan 2025
  • OVERHEATING ASSESSMENT PAGE 50-99 Application Survey / Assessment / Statement · 08 Jan 2025
  • OVERHEATING ASSESSMENT PAGE 100-156 Application Survey / Assessment / Statement · 08 Jan 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

South Cambridgeshire granted permission on 24 September 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About reserved matters applications

A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In South Cambridgeshire

  • 26/02776/REM Granted

    7 Honeysuckle Close Caxton Cambridgeshire CB23 3BB

    Reserved matters application for the layout, scale, appearance and landscaping of plot 7 following outline planning permission of 20/04704/OUT (Outline planning for the erection of up to nine self-build/custom-build dwellings and associated garaging with some matters reserved except for access from Rosemary Greene Close).

    Received 21 Jul, published by the council 31 Jul 2026 Reserved matters
  • 26/03515/REM Awaiting decision

    Northstowe Phase 2 Station Road Longstanton Cambridgeshire

    Reserved matters application for the approval of access, appearance, landscaping, layout and scale of a new access road and associated footways connecting Stirling Road to the proposed Town Hub, together with associated landscaping, highway infrastructure and parking following outline planning permission S/2011/14/OL, and the related partial discharge of outline conditions 9 (Design Code), 18 (Site Wide Surface Water Drainage Strategy), 19 (Drainage - Reserved Matters), 23 (Landscape and Design), 24 (Landscape Management and Maintenance Plan), 27 (Ecological Management Plan), 39 (Construction Environmental Management Plan), 41 (External Artificial Lighting) and 42 (Operational Noise) and 53 (Parking Management Strategy).

    Received 15 Sep, published by the council 25 Sep 2026 Reserved matters
  • 26/03440/REM Awaiting decision

    Northstowe Phase 2 Station Road Longstanton Cambridgeshire

    Reserved matters application for the approval of access, appearance, landscaping, layout and scale for Strategic Landscaping works to Pillbox Pool following outline planning permission S/2011/14/OL, and the related partial discharge of outline conditions 9 (Design Code), 18 (Site Wide Surface Water Drainage Strategy), 19 (Drainage - Reserved Matters), 23 (Landscape and Design), 24 (Landscape Management and Maintenance Plan), 27 (Ecological Management Plan), 30 (Management of Pillboxes), 39 (Construction Environmental Management Plan), 41 (External Artificial Lighting) and 42 (Operational Noise).

    Received 8 Sep, published by the council 25 Sep 2026 Reserved matters
  • 26/03359/REM Awaiting decision

    Girton College Huntingdon Road Girton Cambridgeshire CB3 0JG

    Reserved matters application for approval of appearance, landscaping, layout and scale for the Installation of 1no. informal natural grass pitch and 2no. Multi-Use Games Areas enclosed with ball stop fencing for 2no. tennis courts (with line marking to accommodate netball and pickleball) together with associated landscaping, equipment storage and provision of new pathway to existing Woodland Walk following outline planning permission 22/00887/OUT (Outline application for the construction of student residential accommodation together will ancillary meeting, office and social space (maximum 14700sqm ), auditorium (maximum 1300sqm) replacement buildings and grounds maintenance workshops, one new and relocated sports pitch, additional ball-stop fencing, relocated tennis courts, a new vehicular access and replacement car park with some matters reserved except for access) as varied by 26/01599/S73 (S73 to vary condition 3 (approved drawings) of ref: 22/00887/OUT (Outline application for the construction of student residential accommodation together will ancillary meeting, office and social space (maximum 14700sqm ), auditorium (maximum 1300sqm) replacement buildings and grounds maintenance workshops, one new and relocated sports pitch, additional ball-stop fencing, relocated tennis courts, a new vehicular access and replacement car park with some matters reserved except for access) to update parameter landscape and land use plan.)

    Received 3 Sep, published by the council 6 Sep 2026 Reserved matters
  • 26/03381/REM Awaiting decision

    9 Soule Croft Gamlingay Cambridgeshire SG19 3FZ

    Plot 9 - Reserved matters application for access, appearance, landscaping, layout and scale for the construction of a self/custom build dwelling following outline planning permission 24/01080/OUT (Outline planning application with all matters reserved (except for access, layout of roads and plots) for nine self/custom build residential dwellings (replacement of planning permission S/3170/17/OL)

    Received 3 Sep, published by the council 9 Sep 2026 Reserved matters