Skip to content
PlanIndex Get alerts
Menu

Planning application

Fairview, New Road, East Huntspill, Highbridge, Somerset, TA9 3QB

Granted Somerset 25/21/00020 Full Planning Permission

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a porch to the front (South) elevation, erection of a single storey extension to the side (East) elevation and erection of a two storey extension to the rear (North) elevation, on site of existing (to be demolished and raising of roof height.

As published by the council, reference 25/21/00020

Application record

Reference
25/21/00020
Type
Full Planning Permission
Status
Permitted
Decision
Granted Permission
Received
9 Jun 2021
Validated
9 Jun 2021
Decided
11 Jul 2021
Parish
East Huntspill
Decision by
Delegated
Postcode
TA9 3QB

Timeline

Dates from the published record

  1. 9 Jun 2021

    Received by Somerset

  2. 11 Jul 2021

    Decision issued: Granted Permission

  3. 4 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Somerset

  • 08/26/00065 Granted

    2 Binford Place, Bridgwater, Somerset, TA6 3NJ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    17 Aug 2026 Full applications
  • 14/26/00008 Granted

    Brambles, Little Leaze Lane, Catcott, Bridgwater, Somerset, TA7 9HJ

    Erection of a garage.

    17 Aug 2026 Full applications
  • 11/26/00070 Granted

    83 High Street, Burnham On Sea, Somerset, TA8 1PE

    Installation of defibrillator and bleed kit cabinet to external wall of Nationwide Building Society branch.

    16 Jul 2026 Full applications
  • 54/26/00006 Granted

    Land to the West of, The Causeway, Woolavington, Bridgwater, Somerset, TA7

    Installation of a synchronous condenser facility, switchroom, with ancillary 400kV infrastructure, and associated works including upgraded access, internal drives, diversion of 33kV overhead line and cable connection to New Woolavington Substation.

    20 Aug 2026 Full applications
  • 11/26/00071 Granted

    45 Priestley Way, Burnham On Sea, Somerset, TA8 1QX

    Conversion of garage to living accommodation (bedroom) by removal of garage door and replacing with bricks and window as per submitted drawings

    24 Aug 2026 Full applications