Planning application
Henleaze Farm Holt Lane Witham Friary Frome Somerset BA11 5HJ
Works: New dwelling Demolition Several homes
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of existing agricultural buildings and erection of 3 self-build dwellings following grant of Prior notification for the change of use of an agricultural building to form 3 No. dwellings (2024/1737/PAA) with associated landscaping
As published by the council, reference 2026/0836/FUL
Application record
- Reference
- 2026/0836/FUL
- Type
- Full Application
- Status
- Registered
- Received
- 28 Apr 2026
- Validated
- 28 Apr 2026
- Ward
- Mendip Central And East Division
- Parish
- Witham Friary Parish Council
- Postcode
- BA11 5HJ
Timeline
Dates from the published record
-
28 Apr 2026
Received by Exmoor National Park
-
2 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Exmoor National Park took a median of 44 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Templecombe
210 applications on PlanIndex · across 4 councils · 97% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
31 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Exmoor National Park for determination, against a statutory target of eight weeks. Over the last year Exmoor National Park decided full applications in a median of 52 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Moorpark Bungalow Holt Lane Witham Friary Frome Somerset BA11 5HJ
Construction ground floor extension and roof alterations, including dormer windows, to form an annexe and first floor.
Granted Householder Extension Loft or dormer +2 8 docsDomestic
Other full applications
In Exmoor National Park
-
24/26/00013 Granted
Sunnydale, Lake House Lane, East Brent, Highbridge, Somerset, TA9 4HN
Erection of a two storey extension to the south elevation.
-
37/26/00064 Granted
Land to the West of Taunton Road, and North of, Stockmoor Drove, Bridgwater, Somerset, TA6
Erection of 2No. residental dwellings & garaging
-
54/26/00006 Granted
Land to the West of, The Causeway, Woolavington, Bridgwater, Somerset, TA7
Installation of a synchronous condenser facility, switchroom, with ancillary 400kV infrastructure, and associated works including upgraded access, internal drives, diversion of 33kV overhead line and cable connection to New Woolavington Substation.
-
14/26/00008 Granted
Brambles, Little Leaze Lane, Catcott, Bridgwater, Somerset, TA7 9HJ
Erection of a garage.
-
08/26/00065 Granted
2 Binford Place, Bridgwater, Somerset, TA6 3NJ
Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch