Planning application

Land At 349414 139537 Northload Bridge Glastonbury Somerset

Granted Somerset 2024/1600/FUL Full Application

Works: Demolition Several homes

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing commercial barns, erection of 9 dwellings, vehicular access from Godney Road, public open space, landscaping, sustainable drainage system & associated works

As published by the council, reference 2024/1600/FUL

Application record

Reference
2024/1600/FUL
Type
Full Application
Status
Decided
Decision
Approval
Received
9 Sep 2024
Validated
16 Sep 2024
Decided
24 Oct 2025
Ward
Glastonbury Division
Parish
Glastonbury Town Council
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 9 Sep 2024

    Received by Somerset

  2. 16 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 24 Oct 2025

    Decision issued: Approval

  4. 4 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

92 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land At 349414 139537 Northload Bridge Glastonbury Somerset

    2026/1085/APP Submitted 9 Jun 2026 0m away

    90% historically approved · decision due ~4 Aug

    Approval of details reserved by condition 3 (Materials), condition 8 (Construction Management Plan), condition 9 (Estate Roads), condition 15 (Biodiversity Gain Plan), condition 16 (Lighting Scheme), condition 17 (Construction Environmental Management Plan), condition 20 (Detailed Arboricultural Method Statement) and condition 22 (Finished Floor Levels) on consent 2024/1600/FUL.

    Awaiting decision Conditions 17 docs
  • Land At 349414 139537 Northload Bridge Glastonbury Somerset

    2024/1600/FUL Submitted 9 Sep 2024 0m away

    Demolition of existing commercial barns, erection of 9 dwellings, vehicular access from Godney Road, public open space, landscaping, sustainable drainage system & associated works

    Granted Full applications Demolition 92 docs
    Several homes
  • Land At 349414 139537 Northload Bridge Glastonbury Somerset

    2026/1085/APP Submitted 9 Jun 2026 0m away

    90% historically approved · decision due ~4 Aug

    Approval of details reserved by condition 3 (Materials), condition 8 (Construction Management Plan), condition 9 (Estate Roads), condition 15 (Biodiversity Gain Plan), condition 16 (Lighting Scheme), condition 17 (Construction Environmental Management Plan), condition 20 (Detailed Arboricultural Method Statement) and condition 22 (Finished Floor Levels) on consent 2024/1600/FUL.

    Awaiting decision Conditions 17 docs
  • Land At 349491 139468 Northload Bridge Glastonbury Somerset

    2023/0012/FUL Submitted 5 Jan 2023 41m away

    Demolition of existing commercial barns and the erection of 27no. dwellings (30% affordable housing), with access, public open space, landscaping, and associated works. (Additional information received 29/08/2023).

    Refused Full applications Demolition 163 docs
    Major scheme
  • Land At 349491 139468 Northload Bridge Glastonbury Somerset

    2025/1788/TPO Submitted 1 Oct 2025 75m away

    98% historically approved · decision due ~26 Nov

    (M1398) - Pollarding of existing working pollard Willow trees.

    Awaiting decision Trees 5 docs
  • Land At 349491 139468 Northload Bridge Glastonbury Somerset

    2025/1788/TPO Submitted 1 Oct 2025 75m away

    98% historically approved · decision due ~26 Nov

    (M1398) - Pollarding of existing working pollard Willow trees.

    Awaiting decision Trees 5 docs

In Somerset

  • 24/26/00013 Granted

    Sunnydale, Lake House Lane, East Brent, Highbridge, Somerset, TA9 4HN

    Erection of a two storey extension to the south elevation.

    1 Sep 2026 Full applications
  • 37/26/00064 Granted

    Land to the West of Taunton Road, and North of, Stockmoor Drove, Bridgwater, Somerset, TA6

    Erection of 2No. residental dwellings & garaging

    27 Aug 2026 Full applications
  • 08/26/00065 Granted

    2 Binford Place, Bridgwater, Somerset, TA6 3NJ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    17 Aug 2026 Full applications
  • 14/26/00008 Granted

    Brambles, Little Leaze Lane, Catcott, Bridgwater, Somerset, TA7 9HJ

    Erection of a garage.

    17 Aug 2026 Full applications
  • 11/26/00070 Granted

    83 High Street, Burnham On Sea, Somerset, TA8 1PE

    Installation of defibrillator and bleed kit cabinet to external wall of Nationwide Building Society branch.

    16 Jul 2026 Full applications