Skip to content
PlanIndex Get alerts
Menu

Planning application

Pencroft, Norville Lane, Cheddar, Somerset, BS27 3HJ

Granted Somerset 17/26/00033 Full Planning Permission

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey (North) side extension part on site of existing detached garage (to be demolished).

As published by the council, reference 17/26/00033

Application record

Reference
17/26/00033
Type
Full Planning Permission
Status
Permitted
Decision
Granted Permission
Received
11 Jun 2026
Validated
11 Jun 2026
Decided
10 Jul 2026
Parish
Cheddar
Decision by
Delegated
Postcode
BS27 3HJ

Timeline

Dates from the published record

  1. 11 Jun 2026

    Received by Somerset

  2. 10 Jul 2026

    Decision issued: Granted Permission

  3. 4 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Pencroft, Norville Lane, Cheddar, Somerset, BS27 3HJ

    17/26/00033 Submitted 11 Jun 2026 0m away

    Erection of a single storey (North) side extension part on site of existing detached garage (to be demolished).

    Granted Full applications Extension Demolition 7 docs
    Small domestic
  • Brecon, The Hayes, Cheddar, Somerset, BS27 3HP

    17/25/00066 Submitted 9 Sep 2025 53m away

    Erection of a two story side extension North elevation & erection of a single storey rear extension West elevation.

    Granted Full applications Extension 11 docs
    Small domestic
  • Brecon, The Hayes, Cheddar, Somerset, BS27 3HP

    17/25/00066 Submitted 9 Sep 2025 53m away

    Erection of a two story side extension North elevation & erection of a single storey rear extension West elevation.

    Granted Full applications Extension 11 docs
    Small domestic
  • 3 Charnwood Drive, Cheddar, Somerset, BS27 3HD

    17/24/00047 Submitted 22 Aug 2024 90m away

    Erection of single storey South extension on site of existing detached garage (to be demolished) and associated works.

    Granted Full applications Extension Demolition 13 docs
    Small domestic
  • 3 Charnwood Drive, Cheddar, Somerset, BS27 3HD

    17/24/00047 Submitted 22 Aug 2024 90m away

    Erection of single storey South extension on site of existing detached garage (to be demolished) and associated works.

    Granted Full applications Extension Demolition 13 docs
    Small domestic
  • ElectronicTelecommunications Apparatus adjacent East Haven, The Hayes, Cheddar, Somerset, BS27

    17/25/00083 Submitted 21 Oct 2025 134m away

    Notice of intent to install fixed line broadband electronic communications apparatus comprising of 1no. 9m Light wooden pole. Ref: OGEAA3136853

    Granted Telecoms 1 doc

In Somerset

  • 24/26/00013 Granted

    Sunnydale, Lake House Lane, East Brent, Highbridge, Somerset, TA9 4HN

    Erection of a two storey extension to the south elevation.

    1 Sep 2026 Full applications
  • 37/26/00064 Granted

    Land to the West of Taunton Road, and North of, Stockmoor Drove, Bridgwater, Somerset, TA6

    Erection of 2No. residental dwellings & garaging

    27 Aug 2026 Full applications
  • 08/26/00065 Granted

    2 Binford Place, Bridgwater, Somerset, TA6 3NJ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    17 Aug 2026 Full applications
  • 14/26/00008 Granted

    Brambles, Little Leaze Lane, Catcott, Bridgwater, Somerset, TA7 9HJ

    Erection of a garage.

    17 Aug 2026 Full applications
  • 11/26/00070 Granted

    83 High Street, Burnham On Sea, Somerset, TA8 1PE

    Installation of defibrillator and bleed kit cabinet to external wall of Nationwide Building Society branch.

    16 Jul 2026 Full applications