Skip to content
PlanIndex Get alerts
Menu

Planning application

TEL/2025/13

26, Burnham Park, Priory Road, Burnham, Berkshire, SL1 6DP

Decided Slough Tele Notifications

Proposal

The replacement of the existing 17.5m monopole and 5no. cabinets, with a 20m monopole supporting 12no. antennas, 6no. cabinets, and ancillary works thereto.

As published by the council, reference TEL/2025/13

Timeline

Dates from the published record

  1. 29 Sep 2025

    Received by Slough

  2. 29 Sep 2025

    Decision issued: Notification Accepted

  3. 25 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Slough is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • Y/08149/003 Granted

    8, Leaholme Gardens, Slough, SL1 6LD

    The erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 4.3m, with a maximum height of 3.4m, and an eaves height of 2.5m

    25 Jun 2021 76m away Prior approval
  • PL/25/5417/FA Granted

    Windrush 54 Hogfair Lane Burnham Buckinghamshire SL1 7HQ

    Construction of first and second floor rear extension with two additional roof lights on the front roof slope, one on the side and one on the rear and removal of chimney stack

    10 Nov 2025 186m away Full applications
  • PL/25/5431/FA Granted

    Windrush 54 Hogfair Lane Burnham Buckinghamshire SL1 7HQ

    Construction of first and second floor rear extension with two rear dormers and one roof light on the rear roof slope, three additional roof lights on the front roof slope and one roof light on the side roof slope

    10 Nov 2025 186m away Full applications
  • Y/02549/001 Granted

    46, Priory Road, Slough, SL1 6DR

    The erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 4.5m, with a maximum height of 3m, and an eaves height of 2.95m

    16 Feb 2026 212m away Prior approval
  • P/19116/002 Granted

    6, Ramsey Court, Slough, Slough, SL2 2PB

    Planning application for the change of use of land from green verge to residential garden and the erection of a 1.8 metre close board fence set back 1 metre from the footpath with landscaping of verge area.

    21 Nov 2025 218m away Full applications
  • P/19032/002 Granted

    7, Ramsey Court, Slough, SL2 2PB

    Retrospective application for material change of use of the land from green verge to residential garden and proposed erection of boundary treatment set back 1 metre from the footpath with landscaped verge

    1 Dec 2025 224m away Full applications