Planning application
Oakly Park House Bromfield Shropshire SY8 2JW
Works: Extension Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Enlargement of existing infill extension, new openings from existing rooms, removal of partitions, alterations/repairs to conservatory wall, proposed new bathrooms at ground and first floor, installation of dumb-waiter, overhaul/repairs to existing windows and doors, lining of all fireplace flues, installation of air source heat pumps
As published by the council, reference 26/03095/FUL
Application record
- Reference
- 26/03095/FUL
- Category
- Full applications
- Status
- Pending Consideration
- Validated
- 28 Aug 2026
- Postcode
- SY8 2JW
Timeline
Dates from the published record
-
28 Aug 2026
Validated
Checked as complete and ready for consideration.
-
28 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Shropshire took a median of 42 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Shropshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Oakly Park House Bromfield Shropshire SY8 2JW
90% historically approved · decision due ~23 Oct
Enlargement of existing infill extension, new openings from existing rooms, removal of partitions, alterations/repairs to conservatory wall, proposed new bathrooms at ground and first floor, installation of dumb-waiter, overhaul/repairs to existing windows and doors, lining of all fireplace flues, installation of air source heat pumps
Awaiting decision Heritage and listed buildings Extension Windows or glazing
Other full applications applications
In Shropshire
-
26/03216/FUL Awaiting decision
9 Fairburn Drive Shrewsbury Shropshire SY3 6DQ
Proposed first floor side and front extensions, two storey rear side extension and internal alterations.
-
26/03192/FUL Awaiting decision
6 Cruckton Hall Gardens Cruckton Shrewsbury Shropshire SY5 8PQ
Erection of single storey rear extension and installation of 15 solar panels to existing rear roofline
-
26/03138/FUL Awaiting decision
1 Ashlett Cottages High Street Church Stretton Shropshire SY6 6DB
Insertion of new first floor window and replacement of existing windows and doors
-
26/03185/FUL Awaiting decision
Heath View Schoolhouse Lane Bishops Castle Shropshire SY9 5ER
Erection of replacement dwelling
-
26/03084/FUL Awaiting decision
Perrydene Brownhill Ruyton Xi Towns Shrewsbury Shropshire SY4 1LR
Single storey side extensions, conversion of part workshop into ancillary accommodation