Planning application
Land To The East Of A970, Hill Of Wethersta, Shetland.
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.
As published by the council, reference 2026/052/PPF
Application record
- Reference
- 2026/052/PPF
- Type
- Planning Permission Full
- Status
- Decided
- Decision
- Grant subject to conditions
- Received
- 6 Mar 2026
- Validated
- 10 Mar 2026
- Decided
- 6 Aug 2026
- Parish
- DELTING
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
6 Mar 2026
Received by Shetland Islands
-
10 Mar 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
6 Aug 2026
Decision issued: Grant subject to conditions
Related applications
Cases linked to this one on the register
- Application: 2025/184/SCR (Decided)
Who's behind it
Company information only, from the register and Companies House
Locogen Consulting Ltd Agent, registered in Edinburgh
Active · incorporated 2015 · Edinburgh
7 applications on PlanIndex · across 6 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
62 documents on file for this application
- ACCESS TRACK CROSS SECTION
- ARCHAEOLOGY REPORT
- CUSTOMER SUBSTATION PLAN AND ELEVATIONS
- DNO SUBSTATION PLAN AND ELEVATIONS
- HYDROLOGY ASSESSMENT
- LANDSCAPE AND VISUAL APPRAISAL
- A LOCATION PLAN
- NOISE IMPACT ASSESSMENT
- PEAT IMPACT ASSESSMENT - FIGURE 1
- PEAT IMPACT ASSESSMENT - FIGURE 2
- PEAT IMPACT ASSESSMENT - FIGURE 3A
- PEAT IMPACT ASSESSMENT - FIGURE 3B
- PEAT IMPACT ASSESSMENT - FIGURE 4
- PEAT IMPACT ASSESSMENT - FIGURE 5
- PEAT IMPACT ASSESSMENT - FIGURE 6
- PEAT IMPACT ASSESSMENT - FIGURE 7A
- PEAT IMPACT ASSESSMENT - FIGURE 7B
- SHADOW FLICKER ASSESSMENT
- SITE PLAN
- SOILS AND PEAT IMPACT ASSESSMENT
- TRANSFORMER PLAN AND ELEVATIONS
- TRANSPORT STATEMENT
- TYPICAL TURBINE ELEVATION
- ZTV 15KM WITH LANDSCAPE DESIGNATIONS
- ZTV 15KM WITH LCAS
- ZTV 15KM WITH VIEWPOINTS
- ZTV 35KM
- ZTV 15KM
- ZTV 5KM WITH LANDSCAPE AND CULTURAL DESIGNATIONS
- ZTV 35KM WITH CUMULATIVE DEVELOPMENTS
- ZTV CUMULATIVE WITH VIKING
- ACCESS TRACK AND SWALE SECTIONS
- DETENTION BASIN DETAILS
- DRAINAGE LAYOUT
- WATER AND DRAINAGE REPORT
- ECOLOGICAL IMPACT ASSESSMENT
- DECISION NOTICE
- NATURAL HERITAGE
- APPLICATION PDF
- WIRELINES AND PHOTOMONTAGES V2 PART 1
- WIRELINES AND PHOTOMONTAGES V2 PART 2
- COLLISION RISK MODELLING REPORT
- OUTLINE BIODIVERSITY AND PEATLAND RESTORATION PLAN
- APPLICATION PDF
- NATURE SCOT - COMMENTS
- NATURAL HERITAGE - COMMENTS
- COLLISION RISK MODELLING REPORT
- ECOLOGICAL IMPACT ASSESSMENT
- FLOOD DRAINAGE - COMMENTS
- DELTING CC - COMMENTS
- NATURESCOT - COMMENTS
- RSPB - COMMENTS
- ROADS TRAFFIC - COMMENTS
- OUTDOOR ACCESS - COMMENTS
- ARCHAEOLOGIST - COMMENTS
- FLOOD/DRAINAGE - COMMENTS
- ECOLOGICAL IMPACT ASSESSMENT
- PLANNING STATEMENT
- APPLICATION PDF
- SHADOW FLICKER ASSESSMENT APPENDIX A
- WIRELINES AND PHOTOMONTAGES PART 1
- WIRELINES AND PHOTOMONTAGES PART 2
Trade members open them from here.
Open the documentsWhat this grant of permission means
Shetland Islands granted permission on 6 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Shetland Islands
-
2026/081/PPF Granted
The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN
To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.
-
2026/103/PPF Granted
Mossy Hill Wind Farm Lerwick Shetland
To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry
-
2026/093/PPF Granted
Whirlie Sandwick Shetland ZE2 9HN
To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.
-
2026/116/PPF Granted
Cunningsburgh FC Changing Room Da Moors Cunningsburgh Shetland ZE2 9HB
7.4m x 4.7m extension to changing facility
-
2026/089/PPF Granted
48 Robertson Crescent Lerwick Shetland ZE1 0HS
Erection of single storey west side extension of dwellinghouse.