Skip to content
PlanIndex Get alerts
Menu

Planning application

Brightside Brae Shetland ZE2 9QJ

Granted Shetland Islands 2026/030/PPF Planning Permission Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erect general purpose steel framed greenhouse on current hard standing area.

As published by the council, reference 2026/030/PPF

Application record

Reference
2026/030/PPF
Type
Planning Permission Full
Status
Decided
Decision
Grant subject to conditions
Received
16 Feb 2026
Validated
17 Feb 2026
Decided
9 Apr 2026
Ward
Delting
Parish
DELTING
Decision by
Delegated Decision
Postcode
ZE2 9QJ

Timeline

Dates from the published record

  1. 16 Feb 2026

    Received by Shetland Islands

  2. 17 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 9 Apr 2026

    Decision issued: Grant subject to conditions

  4. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

  • SITE PLAN Approved Plans · 09 Apr 2026
  • FOUNDATION PLAN Approved Plans · 09 Apr 2026
  • ELEVATIONS Approved Plans · 09 Apr 2026
  • FLOOR PLAN Approved Plans · 09 Apr 2026
  • ROAD DETAILS Approved Plans · 09 Apr 2026
  • LOCATION PLAN Approved Plans · 09 Apr 2026
  • SITE PLAN Approved Plans · 09 Apr 2026
  • DELEGATED REPORT OF HANDLING Delegated Report of Handling · 09 Apr 2026
  • DECISION NOTICE Decision · 09 Apr 2026
  • DRAIN/FLOOD - RE CONSULTATION COMMENTS Consultee Comment · 03 Mar 2026
  • ROADS - COMMENTS Consultee Comment · 26 Feb 2026
  • SOAKAWAY CALCULATIONS Supporting Documents · 26 Feb 2026
  • FLOOD DRAINAGE - COMMENTS Consultee Comment · 18 Feb 2026
  • PHOTOS OF SHEDS USING CLEAR POLY-CARBONATE SHEETS FROM GREENHILL SYSTEMS Supporting Documents · 16 Feb 2026
  • APPLICATION PDF Application Form · 16 Feb 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Shetland Islands granted permission on 9 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Brae High School Brae Shetland ZE2 9QJ

    2026/092/PAN Submitted 7 May 2026 80m away

    Proposal of Application Notice of proposed erection of new through Campus with associated parking and provision of external landscape and sport spaces

    Decided 5 docs
  • Brae High School Brae Shetland ZE2 9QJ

    2026/192/PPF Submitted 8 Sep 2026 299m away

    99% historically approved · decision due ~3 Nov

    Erection of a new Brae Campus incorporating ELC, primary, secondary and enhanced learning provision with associated car parking and provision of external landscape spaces within the boundary of the existing Brae primary and secondary school site and adjacent pitch.

    Awaiting decision 32 docs
  • 2 Camp Brae Shetland ZE2 9BY

    2025/288/CLUP Submitted 11 Nov 2025 338m away

    Proposed development of a new ancillary detached garage 8.5M x 5.5M

    Granted Lawful development 3 docs
  • Drumquin Brae Shetland ZE2 9QJ

    2026/035/PPF Submitted 18 Feb 2026 385m away

    Change of use of part of dwellinghouse to form a guest house (8 letting bedrooms) with associated shared facilities.

    Granted Full applications 12 docs
    Domestic

In Shetland Islands

  • 2026/081/PPF Granted

    The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN

    To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.

    9 Apr 2026 Full applications
  • 2026/103/PPF Granted

    Mossy Hill Wind Farm Lerwick Shetland

    To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry

    22 May 2026 Full applications
  • 2026/052/PPF Granted

    Land To The East Of A970, Hill Of Wethersta, Shetland.

    The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.

    6 Mar 2026 Full applications
  • 2026/093/PPF Granted

    Whirlie Sandwick Shetland ZE2 9HN

    To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.

    11 May 2026 Full applications
  • 2026/116/PPF Granted

    Cunningsburgh FC Changing Room Da Moors Cunningsburgh Shetland ZE2 9HB

    7.4m x 4.7m extension to changing facility

    3 Jun 2026 Full applications