Skip to content
PlanIndex Get alerts
Menu

Planning application

Sandalbrae Baltasound Unst Shetland ZE2 9DS

Granted Shetland Islands 2026/027/PPF Planning Permission Full

Works: Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing dwellinghouse and construction of new single storey 2 bedroom house with solar panels and ASHP, associated landscaping and drainage works.

As published by the council, reference 2026/027/PPF

Application record

Reference
2026/027/PPF
Type
Planning Permission Full
Status
Decided
Decision
Granted As published: Grant subject to conditions
Received
10 Feb 2026
Validated
10 Feb 2026
Decided
16 Mar 2026
Ward
Unst
Parish
UNST
Decision by
Delegated Decision
Postcode
ZE2 9DS

Site history

Applications at this address on the Shetland Islands register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • 2026/027/DCON Granted

    Sandalbrae Baltasound Unst Shetland ZE2 9DS

    Application for consent, agreement or approval required by planning Condition: 09 (soil,spoil or waste) (of planning application 2026/027/PPF.

    Decided 9 Apr 2026 Conditions

Timeline

Dates from the published record

  1. 10 Feb 2026

    Received by Shetland Islands

  2. 16 Mar 2026

    Decision issued: Grant subject to conditions

  3. 28 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 2026/027/DCON Granted

    Sandalbrae Baltasound Unst Shetland ZE2 9DS

    Application for consent, agreement or approval required by planning Condition: 09 (soil,spoil or waste) (of planning application 2026/027/PPF.

    Decided 9 Apr 2026 Conditions
  • Scottishbuildingwarrant: BW/2026/018 (Building Work Started)
  • Scottishbuildingwarrant: BW/2026/090 (Pending Consideration)

Who's behind it

Company information only, from the register and Companies House

PJP Architects LLP Agent, an architecture practice registered in Shetland

Active · incorporated 2007 · Shetland

31 applications on PlanIndex · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

  • SITE & LANDSCAPE PLAN Approved Plans · 09 Apr 2026
  • DECISION LETTER CONDITION 9 Decision · 09 Apr 2026
  • EXISTING SITE PLAN Approved Plans · 17 Mar 2026
  • A LOCATION PLAN Approved Plans · 17 Mar 2026
  • PROPOSED SITE AND LANDSCAPE PLAN Approved Plans · 17 Mar 2026
  • PROPOSED ELEVATIONS AND SITE SECTION Approved Plans · 17 Mar 2026
  • PROPOSED FLOOR PLAN Approved Plans · 17 Mar 2026
  • DELEGATED REPORT OF HANDLING Delegated Report of Handling · 17 Mar 2026
  • DECISION NOTICE Decision · 17 Mar 2026
  • DECISION NOTICE EMAIL Decision · 17 Mar 2026
  • ADVERT - SHETLAND TIMES Advert · 19 Feb 2026
  • SCOTTISH WATER - COMMENTS Consultee Comment · 13 Feb 2026
  • DRAIN/FLOOD - COMMENTS Consultee Comment · 12 Feb 2026
  • ROADS - COMMENTS Consultee Comment · 12 Feb 2026
  • ASHP SPECIFICATION Supporting Documents · 10 Feb 2026
  • EXISTING PHOTOS AND SUPPORTING INFORMATION Drawing · 10 Feb 2026
  • APPLICATION PDF Application Form · 10 Feb 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Shetland Islands granted permission on 16 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Sandalbrae Baltasound Unst Shetland ZE2 9DS

    2026/027/DCON Submitted 23 Mar 2026 211m away

    Application for consent, agreement or approval required by planning Condition: 09 (soil,spoil or waste) (of planning application 2026/027/PPF.

    Granted Conditions 3 docs

In Shetland Islands

  • 2026/081/PPF Granted

    The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN

    To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.

    Received 9 Apr, published by the council 28 Jul 2026 Full applications
  • 2026/103/PPF Granted

    Mossy Hill Wind Farm Lerwick Shetland

    To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry

    Received 22 May, published by the council 28 Jul 2026 Full applications
  • 2026/052/PPF Granted

    Land To The East Of A970, Hill Of Wethersta, Shetland.

    The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.

    Received 6 Mar, published by the council 28 Jul 2026 Full applications
  • 2026/093/PPF Granted

    Whirlie Sandwick Shetland ZE2 9HN

    To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.

    Received 11 May, published by the council 28 Jul 2026 Full applications
  • 2026/116/PPF Granted

    Cunningsburgh FC Changing Room Da Moors Cunningsburgh Shetland ZE2 9HB

    7.4m x 4.7m extension to changing facility

    Received 3 Jun, published by the council 28 Jul 2026 Full applications