Planning application
Lee Of Burrafirth, Aith Voe
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Application for prior notification under classes 21A, 21B, 21C and 21G of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): To modify an existing fish farm by replacing 10 x 90m-circumference cages with 8 x 100m-circumference cages, to replace existing barge in same location, to change top net system to pole-supported top nets and to change moorings
As published by the council, reference 2026/013/MPN
Application record
- Reference
- 2026/013/MPN
- Status
- Unknown
- Decision
- Prior Approval Required
- Received
- 11 Aug 2026
- Validated
- 12 Aug 2026
- Decided
- 7 Sep 2026
Site history
Applications at this address on the Shetland Islands register
This site has had 2 applications since 2026.
-
2026/013/PAM Awaiting decision
Lee Of Burrafirth, Aith Voe
Application for prior notification under classes 21A, 21B, 21C and 21G of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): To modify an existing fish farm by replacing 10 x 90m-circumference cages with 8 x 100m-circumference cages, to replace existing barge in same location, to change top net system to pole-supported top nets and to change moorings
Timeline
Dates from the published record
-
11 Aug 2026
Received by Shetland Islands
-
12 Aug 2026
Validated
Checked as complete and ready for consideration.
-
13 Aug 2026
Added to PlanIndex
-
7 Sep 2026
Decision issued: Prior Approval Required
-
16 Sep 2026
Status changed to Unknown
Previously Pending Consideration.
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
- CONSULTATION RESPONSE - SEPA
- CONSULTATION RESPONSE - SCOTTISH GOVERNMENT MARINE DIRECTORATE
- APPLICATION FORM
- EXISTING SITE MAP
- PROPOSED LAYOUT
- PROPOSED EQUIPMENT
- SITE PLAN
- COORDINATES
- PREDATOR AND MITIGATION PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Shetland Islands has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Shetland Islands's portal will say. Our guide explains the common types.