Skip to content
PlanIndex Get alerts
Menu

Planning application

Lee Of Burrafirth, Aith Voe

Awaiting decision Shetland Islands 2026/013/MPN

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Application for prior notification under classes 21A, 21B, 21C and 21G of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): To modify an existing fish farm by replacing 10 x 90m-circumference cages with 8 x 100m-circumference cages, to replace existing barge in same location, to change top net system to pole-supported top nets and to change moorings

As published by the council, reference 2026/013/MPN

Application record

Reference
2026/013/MPN
Status
Unknown
Received
11 Aug 2026
Validated
12 Aug 2026

Site history

Applications at this address on the Shetland Islands register

This site has had 2 applications since 2026.

  • 2026/013/PAM Awaiting decision

    Lee Of Burrafirth, Aith Voe

    Application for prior notification under classes 21A, 21B, 21C and 21G of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): To modify an existing fish farm by replacing 10 x 90m-circumference cages with 8 x 100m-circumference cages, to replace existing barge in same location, to change top net system to pole-supported top nets and to change moorings

    Submitted 15 Sep 2026

Timeline

Dates from the published record

  1. 11 Aug 2026

    Received by Shetland Islands

  2. 12 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 13 Aug 2026

    Added to PlanIndex

  4. 16 Sep 2026

    Status changed to Unknown

    Previously Pending Consideration.

  5. Decision

    Awaiting decision

    Decision expected by 7 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Shetland Islands took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

  • CONSULTATION RESPONSE - SEPA Consultee Comment · 28 Aug 2026
  • CONSULTATION RESPONSE - SCOTTISH GOVERNMENT MARINE DIRECTORATE Consultee Comment · 27 Aug 2026
  • APPLICATION FORM Application Form · 12 Aug 2026
  • EXISTING SITE MAP Drawing · 11 Aug 2026
  • PROPOSED LAYOUT Drawing · 11 Aug 2026
  • PROPOSED EQUIPMENT Drawing · 11 Aug 2026
  • SITE PLAN Drawing · 11 Aug 2026
  • COORDINATES Drawing · 11 Aug 2026
  • PREDATOR AND MITIGATION PLAN Drawing · 11 Aug 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Shetland Islands for determination, against a statutory target of eight weeks. Over the last year Shetland Islands's median decision took 57 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Shetland Islands's portal will say. Our guide explains the common types.