Skip to content
PlanIndex Get alerts
Menu

Planning application

Mid Yell Pier Mid Yell Shetland

Granted Shetland Islands 2025/316/PPF Planning Permission Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

To erect Pier Amenity Building with 14 solar panels on roof

As published by the council, reference 2025/316/PPF

Application record

Reference
2025/316/PPF
Type
Planning Permission Full
Status
Decided
Decision
Approved
Received
19 Dec 2025
Validated
7 Jan 2026
Decided
14 Apr 2026
Ward
Yell
Parish
YELL
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 19 Dec 2025

    Received by Shetland Islands

  2. 7 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 14 Apr 2026

    Decision issued: Approved

  4. 28 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Scottishbuildingwarrant: BW/2026/077 (Pending Consideration)

Who's behind it

Company information only, from the register and Companies House

PJP Architects LLP Agent, an architecture practice registered in Shetland

Active · incorporated 2007 · Shetland

31 applications on PlanIndex · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

  • DELEGATED REPORT OF HANDLING Delegated Report of Handling · 14 Apr 2026
  • DECISION NOTICE Decision · 14 Apr 2026
  • DECISION EMAIL Decision · 14 Apr 2026
  • SCOTTISH WATER - COMMENTS Consultee Comment · 24 Mar 2026
  • EMAIL FROM AGENT REQUESTING UPDATE RE: SUBMISSION DETAILS Correspondence · 16 Feb 2026
  • YELL CC - COMMENTS Consultee Comment · 26 Jan 2026
  • FLOOD DRAIN - COMMENTS Correspondence · 16 Jan 2026
  • APPLICATION PDF Application Form · 19 Dec 2025
  • LOCATION PLAN Approved Plans · 19 Dec 2025
  • EXISTING AND PROPOSED SITE PLAN Approved Plans · 19 Dec 2025
  • PROPOSED FLOOR PLAN_ELEVATIONS_3-D IMAGES_FLOOD RISK AND BIODIVERSITY Approved Plans · 19 Dec 2025

Trade members open them from here.

Open the documents

What this grant of permission means

Shetland Islands granted permission on 14 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Shetland Islands

  • 2026/081/PPF Granted

    The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN

    To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.

    9 Apr 2026 Full applications
  • 2026/103/PPF Granted

    Mossy Hill Wind Farm Lerwick Shetland

    To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry

    22 May 2026 Full applications
  • 2026/052/PPF Granted

    Land To The East Of A970, Hill Of Wethersta, Shetland.

    The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.

    6 Mar 2026 Full applications
  • 2026/093/PPF Granted

    Whirlie Sandwick Shetland ZE2 9HN

    To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.

    11 May 2026 Full applications
  • 2026/116/PPF Granted

    Cunningsburgh FC Changing Room Da Moors Cunningsburgh Shetland ZE2 9HB

    7.4m x 4.7m extension to changing facility

    3 Jun 2026 Full applications