Planning application
Stromfirth Whiteness Shetland
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Retrospective application to site static caravan (5 years)
As published by the council, reference 2025/286/PPF
Application record
- Reference
- 2025/286/PPF
- Type
- Planning Permission Full
- Status
- Pending Consideration
- Received
- 10 Nov 2025
- Validated
- 10 Nov 2025
- Ward
- Tingwall, Whiteness & Weisdale
- Parish
- TINGWALL, WHITENESS & WEISDALE
- Postcode
- ZE2 9LH
Timeline
Dates from the published record
-
10 Nov 2025
Received by Shetland Islands
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Shetland Islands took a median of 58 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Vega Technical Services (Shetland) Limited Agent, registered in Shetland
Active · incorporated 2013 · Shetland
79 applications on PlanIndex · across 2 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
34 documents on file for this application
- ROADS- COMMENTS RECONSULTATION
- PROPOSED SITE PLAN
- COVER EMAIL WITH REVISED DRAWING
- ROADS - COMMENTS RECONSULTATION
- PROPOSED SITE PLAN
- COVER EMAIL WITH REVISED SITE PLAN
- DRAIN/FLOOD - RECONSULTATION COMMENTS
- ROADS - COMMENTS RECONSULTATION
- PROPOSED SITE PLAN
- FLOOD DRAINAGE - COMMENTS
- COVER EMAIL FROM AGENT
- PROPOSED SITE PLAN
- EXISTING SITE PLAN
- SITE SECTIONS
- CORRESPONDENCE WITH AGENT RE FURTHER INFO AS RETROSPECTIVE
- EMAIL CORRESPONDENCE WITH AGENT
- EMAIL CORRESPONDENCE WITH AGENT
- EMAIL TO AGENT RE STOP THE CLOCK
- EMAIL REPLY FROM AGENT
- PROPOSED SITE PLAN
- EMAIL FROM AGENT REGARDING ROADS CONSULTATION RESPONSE
- ROADS TRAFFIC - COMMENTS
- PROPOSED SITE PLAN
- EMAIL CORRESPONDENCE
- ADVERT SHETLAND TIMES
- SCOTTISH WATER - COMMENTS
- ROADS - COMMENTS
- DRAIN/FLOOD - COMMENTS
- CARAVAN DETAILS
- PROPOSED SITE PLAN
- SITE SECTIONS
- PREDEVELOPMENT SITE PLAN
- A LOCATION PLAN
- APPLICATION PDF
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Shetland Islands for determination, against a statutory target of eight weeks. Over the last year Shetland Islands decided full applications in a median of 74 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Shetland Islands
-
2026/081/PPF Granted
The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN
To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.
-
2026/103/PPF Granted
Mossy Hill Wind Farm Lerwick Shetland
To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry
-
2026/052/PPF Granted
Land To The East Of A970, Hill Of Wethersta, Shetland.
The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.
-
2026/093/PPF Granted
Whirlie Sandwick Shetland ZE2 9HN
To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.
-
2026/116/PPF Granted
Cunningsburgh FC Changing Room Da Moors Cunningsburgh Shetland ZE2 9HB
7.4m x 4.7m extension to changing facility