Mareel Carpark Gutters Gaet Lerwick Shetland ZE1 0WQ

Granted Shetland Islands 2025/254/PPF Planning Permission Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

To erect a bike shelter within Mareel's carpark with e-bike charging facilities.

As published by the council, reference 2025/254/PPF

Application record

Reference
2025/254/PPF
Type
Planning Permission Full
Status
Decided
Decision
Grant subject to conditions
Received
25 Sep 2025
Validated
25 Sep 2025
Decided
17 Dec 2025
Ward
Lerwick
Parish
LERWICK
Decision by
Delegated Decision
Postcode
ZE1 0WQ

Timeline

Dates from the published record

  1. 25 Sep 2025

    Received by Shetland Islands

  2. 17 Dec 2025

    Decision issued: Grant subject to conditions

  3. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

  • EMAIL TO AGENT Correspondence · 18 Dec 2025
  • LOCATION PLAN Approved Plans · 17 Dec 2025
  • ELEVATIONS, PLAN, SPECIFICATIONS OF E BIKE SHELTER Approved Plans · 17 Dec 2025
  • SITE PLAN Approved Plans · 17 Dec 2025
  • DECISION NOTICE Decision · 17 Dec 2025
  • DELEGATED REPORT OF HANDLING Delegated Report of Handling · 17 Dec 2025
  • ADVERT SHETLAND TIMES Advert · 20 Nov 2025
  • ELEVATIONS AND PLAN OF THE SHELTER Superseded Drawing · 09 Oct 2025
  • APPLICATION FORM - REVISED INFORMATION Application Form · 09 Oct 2025
  • CONSULTATION RESPONSE - DRAINAGE Consultee Comment · 02 Oct 2025
  • CONSULTATION RESPONSE - ROADS Consultee Comment · 30 Sep 2025
  • APPLICATION FORM - REVISED INFORMATION Application Form · 30 Sep 2025
  • SUPERSEDED SPECIFICATIONS OF E BIKE SHELTER Superseded Drawing · 25 Sep 2025
  • SUPERSEDED ELEVATIONS AND PLAN OF THE SHELTER Superseded Drawing · 25 Sep 2025
  • APPLICATION FORM Application Form · 25 Sep 2025

Trade members open them from here.

Open the documents

What this grant of permission means

Shetland Islands granted permission on 17 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Shetland Islands

  • 2026/081/PPF Granted

    The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN

    To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.

    9 Apr 2026 Full applications
  • 2026/103/PPF Granted

    Mossy Hill Wind Farm Lerwick Shetland

    To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry

    22 May 2026 Full applications
  • 2026/052/PPF Granted

    Land To The East Of A970, Hill Of Wethersta, Shetland.

    The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.

    6 Mar 2026 Full applications
  • 2026/093/PPF Granted

    Whirlie Sandwick Shetland ZE2 9HN

    To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.

    11 May 2026 Full applications
  • 2026/116/PPF Granted

    Cunningsburgh FC Changing Room Da Moors Cunningsburgh Shetland ZE2 9HB

    7.4m x 4.7m extension to changing facility

    3 Jun 2026 Full applications