Planning application
Toonigarth Gossabrough Yell Shetland ZE2 9AU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
To erect a single detached garage/workshop building.
As published by the council, reference 2025/236/PPF
Application record
- Reference
- 2025/236/PPF
- Type
- Planning Permission Full
- Status
- Decided
- Decision
- Granted As published: Grant subject to conditions
- Received
- 17 Sep 2025
- Validated
- 29 Oct 2025
- Decided
- 3 Feb 2026
- Ward
- Yell
- Parish
- YELL
- Decision by
- Delegated Decision
- Postcode
- ZE2 9AU
Timeline
Dates from the published record
-
17 Sep 2025
Received by Shetland Islands
-
29 Oct 2025
Validated
Checked as complete and ready for consideration.
-
3 Feb 2026
Decision issued: Grant subject to conditions
-
28 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
- LOCATION PLAN
- EXISTING SITE PLAN
- REVISED FLOOR PLAN AND ELEVATIONS
- PROPOSED SITE PLAN
- DECISION NOTICE
- DELEGATED REPORT OF HANDLING
- FLOOD DRAINAGE - COMMENTS
- APPLICATION SUMMARY PDF
- APPLICATION PDF
- CONSULTATION RESPONSE - ROADS
- DRAIN/FLOOD - COMMENTS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Shetland Islands granted permission on 3 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Shetland Islands
-
2026/081/PPF Granted
The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN
To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.
-
2026/103/PPF Granted
Mossy Hill Wind Farm Lerwick Shetland
To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry
-
2026/052/PPF Granted
Land To The East Of A970, Hill Of Wethersta, Shetland.
The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.
-
2026/093/PPF Granted
Whirlie Sandwick Shetland ZE2 9HN
To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.
-
2026/116/PPF Granted
Cunningsburgh FC Changing Room Da Moors Cunningsburgh Shetland ZE2 9HB
7.4m x 4.7m extension to changing facility