Skip to content
PlanIndex Get alerts
Menu

Planning application

Plot 1 Aisterlea Cunningsburgh Shetland

Granted Shetland Islands 2024/238/PPF Planning Permission Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

To erect new single storey dwellinghouse; install air source heat pump; create new access track, turning and parking area; install surface water attenuation device.

As published by the council, reference 2024/238/PPF

Application record

Reference
2024/238/PPF
Type
Planning Permission Full
Status
Decided
Decision
Approved
Received
17 Sep 2024
Validated
18 Sep 2024
Decided
21 Nov 2024
Ward
Gulberwick, Quarff & Cunningsburgh
Parish
GULBERWICK, QUARFF & CUNNINGSBURGH
Decision by
Delegated Decision
Postcode
ZE2 9HB

Site history

Applications at this address on the Shetland Islands register

This site has had 2 applications since 2024: 2 approved, 0 refused.

  • 2024/238/DCON1 Granted

    Plot 1 Aisterlea Cunningsburgh Shetland

    Application for consent, agreement or approval required by planning condition 4 (Biodiversity).

    Decided 3 Dec 2024 Conditions

Timeline

Dates from the published record

  1. 17 Sep 2024

    Received by Shetland Islands

  2. 18 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 21 Nov 2024

    Decision issued: Approved

  4. 5 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Scottishbuildingwarrant: BW/2024/067 (Building Work Complete)

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Shetland

72 applications on PlanIndex · across 2 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

  • BIODIVERSITY PLAN Discharge of Condition(s) · 03 Dec 2024
  • DECISION LETTER Discharge of Condition(s) · 03 Dec 2024
  • EMAIL FROM AGENT RE: DCON REQUEST Discharge of Condition(s) · 26 Nov 2024
  • COMPLETED NID Discharge of Condition(s) · 26 Nov 2024
  • DECISION NOTICE Decision · 21 Nov 2024
  • DELEGATED REPORT OF HANDLING Delegated Report of Handling · 21 Nov 2024
  • CONSULTATION RESPONSE - COMMUNITY COUNCIL Consultee Comment · 08 Oct 2024
  • CONSULTATION RESPONSE - SCOTTISH WATER Consultee Comment · 01 Oct 2024
  • SHETLAND TIMES ADVERT Advert · 27 Sep 2024
  • CONSULTATION RESPONSE - DRAINAGE Consultee Comment · 23 Sep 2024
  • CONSULTATION RESPONSE - ROADS Consultee Comment · 19 Sep 2024
  • MCS-020 ASHP NOISE ASSESSMENT Supporting Documents · 17 Sep 2024
  • APPLICATION FORM Application Form · 17 Sep 2024

Trade members open them from here.

Open the documents

What this grant of permission means

Shetland Islands granted permission on 21 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Shetland Islands

  • 2025/317/PPF Granted

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.

    19 Dec 2025 Full applications
  • 2026/081/PPF Granted

    The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN

    To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.

    9 Apr 2026 Full applications
  • 2026/103/PPF Granted

    Mossy Hill Wind Farm Lerwick Shetland

    To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry

    22 May 2026 Full applications
  • 2026/052/PPF Granted

    Land To The East Of A970, Hill Of Wethersta, Shetland.

    The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.

    6 Mar 2026 Full applications
  • 2026/093/PPF Granted

    Whirlie Sandwick Shetland ZE2 9HN

    To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.

    11 May 2026 Full applications