Planning application
33 Gressy Loan Lerwick Shetland ZE1 0YB
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
To demolish porch and erect new front porch to the existing dwellinghouse.
As published by the council, reference 2024/232/PPF
Application record
- Reference
- 2024/232/PPF
- Type
- Planning Permission Full
- Status
- Decided
- Decision
- Grant subject to conditions
- Received
- 11 Sep 2024
- Validated
- 11 Sep 2024
- Decided
- 31 Oct 2024
- Ward
- Lerwick
- Parish
- LERWICK
- Decision by
- Delegated Decision
- Postcode
- ZE1 0YB
Timeline
Dates from the published record
-
11 Sep 2024
Received by Shetland Islands
-
31 Oct 2024
Decision issued: Grant subject to conditions
-
5 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
23 Gressy Loan Lerwick Shetland ZE1 0YB
99% historically approved · decision due ~27 Oct
To erect single storey extension to south elevation, install SUDS device and relocate oil tank
Awaiting decision Extension 5 docsSmall domestic -
Old Anderson High School Twageos Road Lerwick Shetland
Proposed Installation of CCTV cameras 6No to exterior of building.
Granted Heritage and listed buildings 12 docs -
Coastguard Station Knab Road Lerwick Shetland ZE1 0AX
99% historically approved · decision due ~7 Oct
Erection of a replacement 28m high galvanised steel lattice radio mast upon which 7 folded dipole antennas and a sloping long wire antenna will be mounted.
Awaiting decision 10 docs -
Bruce Hostel Twageos Road Lerwick Shetland ZE1 0BA
99% historically approved · decision due ~3 Sep
Proposed change of use, restoration and conversion of former hostel building and groundskeepers cottage to form 8 no flats plus 1 no. 1 bedroom residential unit. Demolition of block-built fire-stair extension & outbuilding stores / garage, reconfiguration of parking & landscaping.
Awaiting decision New dwelling Extension +1 35 docsSeveral homes -
Bruce Hostel Twageos Road Lerwick Shetland ZE1 0BA
99% historically approved · decision due ~3 Sep
Alterations to former hostel building including removal of chimneys, reinstatement of window opening on NW elevation, removal and replacement of harling, reconfiguration of internal layout to form 8no. flats, construction of roof over central courtyard, construction of new accessible entrance door, lift and fire/access stair, alterations to existing stairs, replacement doors and windows, demolition of block-built fire-stair extension & outbuilding stores / garage. Alteration and extension of former groundskeepers cottage to form one residential unit.
Awaiting decision Heritage and listed buildings New dwelling Extension +2 36 docsSeveral homes -
Leog House 2 Leog Lane Lerwick ZE1 0AH
99% historically approved · decision due ~7 Aug
Non-Material Variation to vary planning permission 2020/111/PPF - Remove rooflights, add window to east elevation and rainwater pipe to south elevation, reduce height of, and remove grass roof from extension and change external boarding.
Awaiting decision Extension Loft or dormer +1 6 docs
Other full applications applications
In Shetland Islands
-
2025/317/PPF Granted
Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU
The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.
-
2026/081/PPF Granted
The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN
To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.
-
2026/103/PPF Granted
Mossy Hill Wind Farm Lerwick Shetland
To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry
-
2026/052/PPF Granted
Land To The East Of A970, Hill Of Wethersta, Shetland.
The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.
-
2026/093/PPF Granted
Whirlie Sandwick Shetland ZE2 9HN
To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.