Planning application
Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The Proposed Development replaces two previously consented wind turbines at Luggies Knowe, Gremista and will comprise the construction and operation of one wind turbine with a ground to blade tip height of up to 149.9 m, battery energy storage system units, site access tracks and associated infrastructure
As published by the council, reference 2024/006/PPF
Application record
- Reference
- 2024/006/PPF
- Type
- Planning Permission Full
- Status
- Decided
- Decision
- Grant subject to conditions
- Received
- 8 Dec 2025
- Validated
- 22 Jan 2024
- Decided
- 28 Nov 2024
- Parish
- LERWICK
- Decision by
- Delegated Decision
Site history
Applications at this address on the Shetland Islands register
This site has had 5 applications since 2025: 3 approved, 0 refused.
-
2024/006/DCON3 Decided
Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.
Application for consent, agreement or approval required by planning condition: 6 (Decommissioning) of planning application 2024/006/PPF
-
2024/006/DCON Awaiting decision
Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.
Application for consent, agreement or approval required by planning condition: 14 (Written Scheme of Investigation for Archaeology) of planning application 2024/006/PPF
-
2024/006/DCON2 Granted
Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.
Application for consent, agreement or approval required by planning condition: 16 (Aviation Lighting) of planning application 2024/006/PPF
-
2024/006/DCON1 Granted
Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.
Application for consent, agreement or approval required by planning condition: 12 (Ecological Clerk of Works) of planning application 2024/006/PPF
Timeline
Dates from the published record
-
22 Jan 2024
Validated
Checked as complete and ready for consideration.
-
28 Nov 2024
Decision issued: Grant subject to conditions
-
8 Dec 2025
Received by Shetland Islands
-
11 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
5 later applications on the register refer to this one:
-
2024/006/DCON3 Decided
Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.
Application for consent, agreement or approval required by planning condition: 6 (Decommissioning) of planning application 2024/006/PPF
-
2024/006/DCON Awaiting decision
Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.
Application for consent, agreement or approval required by planning condition: 14 (Written Scheme of Investigation for Archaeology) of planning application 2024/006/PPF
-
2024/006/DCON2 Granted
Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.
Application for consent, agreement or approval required by planning condition: 16 (Aviation Lighting) of planning application 2024/006/PPF
-
2026/014/VCON Granted
Luggies Knowe, Hill of Gremista
Section 42 application to vary Condition 8 on 2024/006/PPF - Change of hub height from 82m to 92m
-
2024/006/DCON1 Granted
Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.
Application for consent, agreement or approval required by planning condition: 12 (Ecological Clerk of Works) of planning application 2024/006/PPF
Who's behind it
Company information only, from the register and Companies House
Agent on file
7 applications on PlanIndex · across 5 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
211 documents on file for this application
- DISCHARGE OF CONDITION 16 - APPROVED
- AVIATION LIGHTING
- DISCHARGE OF CONDITION 12- APPROVED
- DCON APPLICATION
- COVER LETTER / CV
- SHETLAND TIMES ADVERT - DECISION MADE
- A LOCATION PLAN
- EIAR CHAPTER 1 INTRODUCTION
- EIAR CHAPTER 1 FIGURE 1_1 SITE LOCATION PLAN
- EIAR CHAPTER 1 FIGURE 1_2 SITE LAYOUT PLAN
- EIAR - LUGGIES KNOWE EIA REPORT FRONT COVERS CONTENTS AND ABBREVIATIONS
- EIAR CHAPTER 1 FIGURE 8_1 HERITAGE ASSETS WITHIN 1KM
- EIAR CHAPTER 11 FIG 11_2 SUPERFICIAL GEOLOGY
- EIAR CHAPTER 11 FIGURE 11_1 HYDROLOGICAL FEATURES
- EIAR CHAPTER 11 FIGURE 11_3 PEAT DEPTH CONTOUR
- EIAR CHAPTER 11 FIGURE 11_4 BEDROCK GEOLOGY
- EIAR CHAPTER 11 FIGURE 11_5 HYDROGEOLOGICAL OVERVIEW
- EIAR CHAPTER 11 FIGURE 11_6 GWDTE
- EIAR CHAPTER 12 FIGURE 12_1 TELECOMMUNICATIONS LINK
- EIAR CHAPTER 3 FIGURE 3_2 LAYOUT 1
- EIAR CHAPTER 3 FIGURE 3_3 LAYOUT 2
- EIAR CHAPTER 3 FIGURE 3_4 LAYOUT 3
- EIAR CHAPTER 3 FIGURE 3_5 LAYOUT 4
- EIAR CHAPTER 3 FIGURE 3_6 LAYOUT 5
- EIAR CHAPTER 3 FIGURE 3_7 LAYOUT 6
- EIAR CHAPTER 5 FIGURE 2_2_2A BLADE TIP ZTV QUADRANT A
- EIAR CHAPTER 5 FIGURE 5_1_1 LVIA STUDY AREA
- EIAR CHAPTER 5 FIGURE 5_1_2 LVIA DESIGNATIONS
- EIAR CHAPTER 5 FIGURE 5_1_3 LVIA CHARACTER TYPES
- EIAR CHAPTER 5 FIGURE 5_1_4 LVIA VIEWPOINNTS
- EIAR CHAPTER 5 FIGURE 5_2_1 BLADE TIP ZTV
- EIAR CHAPTER 5 FIGURE 5_2_10 COMPARATIVE ZTV OVERLAID WITH LANDSCAPE DESIGNATION
- EIAR CHAPTER 5 FIGURE 5_2_11 PROPOSED LUGGIES KNOWE EXTENSION VS VISIBILITY OF B
- EIAR CHAPTER 5 FIGURE 5_2_2B BLADE TIP ZTV QUADRANT B
- EIAR CHAPTER 5 FIGURE 5_2_2C BLADE TIP ZTV QUADRANT C
- EIAR CHAPTER 5 FIGURE 5_2_2D BLADE TIP ZTV QUADRANT D
- EIAR CHAPTER 5 FIGURE 5_2_3 HUB HEIGHT ZTV
- EIAR CHAPTER 5 FIGURE 5_2_4A HUB HEIGHT ZTV QUADRANT A
- EIAR CHAPTER 5 FIGURE 5_2_4B HUB HEIGHT ZTV QUADRANT B
- EIAR CHAPTER 5 FIGURE 5_2_4C HUB HEIGHT ZTV QUADRANT C
- EIAR CHAPTER 5 FIGURE 5_2_4D HUB HEIGHT ZTV QUADRANT D
- EIAR CHAPTER 5 FIGURE 5_2_5 BLADE TIP ZTV OVERLAID WITH LANDSCAPE DESIGNATIONS L
- EIAR CHAPTER 5 FIGURE 5_2_6 HUB HEIGHT ZTV OVERLAID WITH LANDSCAPE DESIGNATIONS
- EIAR CHAPTER 6 FIGURE 6_5 GWDTE
- EIAR CHAPTER 7 FIGURE 7_1 PROPOSED VPS AND VIEWSHEDS AND SITE LOCATION
- EIAR CHAPTER 7 FIGURE 7_2 ORNITHOLOGICAL DESIGNATIONS
- EIAR CHAPTER 8 FIGURE 8_2 HERITAGE ASSETS WITHIN 5KM
- EIAR CHAPTER 8 FIGURE 8_3 DESIGNATED HERITAGE ASSETS WITHIN 10KM
- EIAR CHAPTER 8 FIGURE 8_4 EXTRACT FROM ORDNANCE SURVEY MAP 1881
- EIAR CHAPTER 9 FIGURE 9_1 NSRS AND 35 DB CONTOUR
- EIAR CHAPTER 9 FIGURE 9_2 CUMULATIVE STUDY AREA
- EIAR CHAPTER 5 FIGURE 5_3_10A VIEWPOINT 10 GIRLSTA A970 VIEWPOINT LOCATION PLAN
- EIAR CHAPTER 5 FIGURE 5_3_10B VIEWPOINT 10 GIRLSTA A970
- EIAR CHAPTER 5 FIGURE 5_2_7 BLADE TIP ZTV OVERLAID WITH LANDSCAPE DESIGNATIONS L
- EIAR CHAPTER 5 FIGURE 5_2_9 COMPARATIVE ZTV OVERLAID WITH LANDSCAPE DESIGNATIONS
- EIAR CHAPTER 5 FIGURE FIGURE 5_2_8 HUB HEIGHT ZTV OVERLAID WITH LANDSCAPE DESIGN
- EIAR CHAPTER 5 FIGURE 5_4_1A LVIA CUMULATIVE SITE PLAN 60KM
- EIAR CHAPTER 5 FIGURE 5_4_1B LVIA CUMULATIVE SITE PLAN 40KM
- EIAR CHAPTER 5 FIGURE 5_5_1 CUMULATIVE BLADE TIP ZTV WITH BUILT AND CONSENTED SI
- EIAR CHAPTER 6 FIGURE 6_1 SITE LOCATION PLAN
- EIAR CHAPTER 6 FIGURE 6_2 DESIGNATED SITES
- EIAR CHAPTER 6 FIGURE 6_3 NVC RESULTS
- EIAR CHAPTER 6 FIGURE 6_4 PHASE 1 CORRESPONDING HABITATS
- EIAR CHAPTER 5 FIGURE 5_3_7B VIEWPOINT 7 GARDIE HOUSE BRESSAY EXISTING WIRE
- EIAR CHAPTER 5 FIGURE 5_3_7C VIEWPOINT 7 GARDIE HOUSE BRESSAY PLANAR WIRE
- EIAR CHAPTER 5 FIGURE 5_3_7D VIEWPOINT 7 GARDIE HOUSE BRESSAY PLANAR MONTAGE
- EIAR CHAPTER 5 FIGURE 5_3_8A VIEWPOINT A THE KNAB LERWICK VIEWPOINT LOCATION PLA
- EIAR CHAPTER 5 FIGURE 5_3_8B VIEWPOINT 8 THE KNAB LERWICK EXISTING WIRE
- EIAR CHAPTER 5 FIGURE 5_3_8C VIEWPOINT 8 THE KNAB LERWICK PLANAR WIRE
- EIAR CHAPTER 5 FIGURE 5_3_8D VIEWPOINT 8 PLANAR MONTAGE
- EIAR CHAPTER 5 FIGURE 5_3_9A VIEWPOINT 9 BEOSETTER BRESSAY VIEWPOINT LOCATION PL
- EIAR CHAPTER 5 FIGURE 5_3_9B VIEWPOINT 9 BEOSETTER BRESSAY EXISTING WIRE
- EIAR CHAPTER 5 FIGURE 5_3_9D VIEWPOINT 9 BEOSETTER BRESSAY PLANAR MONTAGE
- EIAR CHAPTER 5 FIGURE 5_6_1A CUMULATIVE VIEWPOINT 1 VIEWPOINT 11 NEBISTER HILL V
- EIAR CHAPTER 5 FIGURE 5_6_1B CUMULATIVE VIEWPOINT 1 VIEWPOINT 11 NEBISTER HILL N
- EIAR CHAPTER 5 FIGURE 5_6_1C CUMULATIVE VIEWPOINT 1 VIEWPOINT 11 NEBISTER HILL E
- EIAR CHAPTER 5 FIGURE 5_6_2A CUMULATIVE VIEWPOINT 2 VIEWPOINT 17 SCORE HILL AITH
- EIAR CHAPTER 5 FIGURE 5_6_2B CUMULATIVE VIEWPOINT 2 VIEWPOINT 17 SCORE HILL AITH
- EIAR CHAPTER 5 FIGURE 5_6_2C CUMULATIVE VIEWPOINT 2 VIEWPOINT 17 SCORE HILL AITH
- EIAR CHAPTER 5 FIGURE 8_5_1A - ARCHWIRE 1 CULTURAL HERITAGE VIEWPOINT 1 TEIND BA
- EIAR CHAPTER 5 FIGURE 8_5_1B ARCHWIRE 1 VIEWPOINT 1 EXISTING WIRE
- EIAR CHAPTER 5 FIGURE 8_5_1C ARCHWIRE 1 VIEWPOINT 1 TEIND BARN120M NORTH OF KEBI
- EIAR CHAPTER 5 FIGURE 8_5_1D ARCHWIRE 1 VIEWPOINT 1 PLANAR MONTAGE
- EIAR CHAPTER 5 FIGURE 8_5_2 CULTURAL HERITAGE VIEWPOINT 2 LAW TING HOLM
- EIAR CHAPTER 5 FIGURE FIGURE 5_3_1B VIEWPOINT 1 - NORTH CALIFF DALES VOE - WIREL
- EIAR CHAPTER 5 FIGURE FIGURE 5_3_6A VIEWPOINT 6 BRESSAY FERRY VIEWPOINT LOCATION
- FIGURE 5_3_12B VIEWPOINT 12 LOCH OF TINGWALL
- EIAR CHAPTER 4 FIGURE 4_1 ENVIRONMENTAL CONSTRAINTS
- EIAR CHAPTER 4 FIGURE 4_2 CUMULATIVE DEVELOPMENTS
- EIAR - NON-TECHNICAL SUMMARY
- EIAR - SUPPORTING PLANNING STATEMENT
- EIAR CHAPTER 5 FIGURE 5_3_4B VIEWPOINT 4 GILBERTSON PARK LERWICK EXISTING WIRE
- EIAR CHAPTER 5 FIGURE 5_3_4C VIEWPOINT 4 GILBERTSON PARK LERWICK PLANAR WIRE
- EIAR CHAPTER 5 FIGURE 5_3_4D VIEWPOINT 4 GILBERTSON PARK LERWICK PLANAR MONTAGE
- EIAR CHAPTER 5 FIGURE 5_3_5A VIEWPOINT 5 FORT CHARLOTTE LERWICK VIEWPOINT LOCATI
- EIAR CHAPTER 5 FIGURE 5_3_5B VIEWPOINT 5 FORT CHARLOTTE LERWICK EXISTING WIRE
- EIAR CHAPTER 5 FIGURE 5_3_5D VIEWPOINT 5 FORT CHARLOTTE LERWICK PLANAR MONTAGE
- EIAR CHAPTER 5 FIGURE 5_3_6B VIEWPOINT 6 BRESSAY FERRY EXISTING WIRE
- EIAR CHAPTER 5 FIGURE 5_3_6C VIEWPOINT 6 BRESSAY FERRY PLANAR WIRE
- EIAR CHAPTER 5 FIGURE 5_3_6D VIEWPOINT 6 BRESSAY FERRY PLANAR MONTAGE
- EIAR CHAPTER 5 FIGURE 5_3_7A VIEWPOINT 7 GARDIE HOUSE BRESSAY VIEWPOINT LOCATION
- EIAR CHAPTER 5 FIGURE 5_3_10C VIEWPOINT 10 GIRLSTA A970
- EIAR CHAPTER 5 FIGURE 5_3_10D VIEWPOINT 10 GIRLSTA A970
- EIAR CHAPTER 5 FIGURE 5_3_11A VIEWPOINT 11 NEBISTER HILL VIEWPOINT LOCATION PLAN
- EIAR CHAPTER 5 FIGURE 5_3_11B VIEWPOINT 11 NEBISTER HILL
- EIAR CHAPTER 5 FIGURE 5_3_11C VIEWPOINT 11 NEBISTER HILL
- EIAR CHAPTER 5 FIGURE 5_3_11D VIEWPOINT 11 NEBISTER HILL
- EIAR CHAPTER 5 FIGURE 5_3_12A VIEWPOINT 12 LOCH OF TINGWALL VIEWPOINT LOCATION P
- EIAR CHAPTER 5 FIGURE 5_3_12C VIEWPOINT 12 LOCH OF TINGWALL
- EIAR CHAPTER 5 FIGURE 5_3_12D VIEWPOINT 12 LOCH OF TINGWALL
- EIAR CHAPTER 5 FIGURE 5_3_13A VIEWPOINT 13 GLETNESS VIEWPOINT LOCATION PLAN
- EIAR CHAPTER 5 FIGURE 5_3_13B VIEWPOINT 13 GLETNESS EXISTING WIRE
- EIAR CHAPTER 5 FIGURE 5_3_13C VIEWPOINT 13 GLETNESS PLANAR WIRE
- EIAR CHAPTER 5 FIGURE 5_3_13D VIEWPOINT 13 GLETNESS PLANAR MONTAGE
- EIAR CHAPTER 5 FIGURE 5_3_14C VIEWPOINT 14 KIRKABISTER PLANAR WIRE
- EIAR CHAPTER 5 FIGURE 5_3_14D VIEWPOINT 14 KIRKABISTER PLANAR MONTAGE
- EIAR CHAPTER 5 FIGURE 5_3_15A VIEWPOINT 15 FREESTER NEARR LOCH BENSON SOUTH NEST
- EIAR CHAPTER 5 FIGURE 5_3_15B VIEWPOINT 15 FREESTER NEAR LOCH BENSON SOUTH NESTI
- EIAR CHAPTER 5 FIGURE 5_3_15C VIEWPOINT 15 FREESTER NEAR LOCH BENSON SOUTH NESTI
- EIAR CHAPTER 5 FIGURE 5_3_15D VIEWPOINT 15 FREESTER NEAR LOCH BENSON SOUTH NESTI
- EIAR CHAPTER 5 FIGURE 5_3_16A VIEWPOINT 16 HELLI NESS VIEWPOINT LOCATION PLAN
- EIAR CHAPTER 5 FIGURE 5_3_16B VIEWPOINT 16 HELLI NESS EXISTING WIRE
- EIAR CHAPTER 5 FIGURE 5_3_16C VIEWPOINT 16 HELLI NESS PLANAR WIRE
- EIAR CHAPTER 5 FIGURE 5_3_16D VIEWPOINT 16 HELLI NESS PLANAR MONTAGE
- EIAR CHAPTER 5 FIGURE 5_3_17A VIEWPOINT 17 SCORE HILL AITHNESS BRESSAY VIEWPOINT
- EIAR CHAPTER 5 FIGURE 5_3_17B VIEWPOINT 17 SCORE HILL AITHNESS BRESSAY EXISTING
- EIAR CHAPTER 5 FIGURE 5_3_17C VIEWPOINT 17 SCORE HILL AITHNESS BRESSAY PLANAR WI
- EIAR CHAPTER 5 FIGURE 5_3_17D VIEWPOINT 17 SCORE HILL AITHNESS BRESSAY PLANAR MO
- EIAR CHAPTER 5 FIGURE 5_3_18A VIEWPOINT 18 WEST BURRA NSA VIEWPOINT LOCATION PLA
- EIAR CHAPTER 5 FIGURE 5_3_18B VIEWPOINT 18 WEST BURRA NATIONAL SCENIC AREA EXIST
- EIAR CHAPTER 5 FIGURE 5_3_18C VIEWPOINT 18 WEST BURRA NATIONAL SCENIC AREA PLANA
- EIAR CHAPTER 5 FIGURE 5_3_18D VIEWPOINT 18 WEST BURRA NATIONAL SCENIC AREA PLANA
- EIAR CHAPTER 5 FIGURE 5_3_19A VIEWPOINT 19 REAWICK NATIONAL SCENIC AREA VIEWPOIN
- EIAR CHAPTER 5 FIGURE 5_3_19B VIEWPOINT 19 REAWICK NATIONAL SCENIC AREA EXISTING
- EIAR CHAPTER 5 FIGURE 5_3_19C VIEWPOINT 19 REAWICK NATIONAL SCENIC AREA PLANAR W
- EIAR CHAPTER 5 FIGURE 5_3_19D VIEWPOINT 19 REAWICK NATIONAL SCENIC AREA PLANAR M
- EIAR CHAPTER 5 FIGURE 5_3_1A - VIEWPOINT 1 - NORTH CALIFF DALES VOE - VIEWPOINT
- EIAR CHAPTER 5 FIGURE 5_3_1D - VIEWPOINT 1 - NORTH CALIFF DALES VOE - PLANAR MON
- EIAR CHAPTER 5 FIGURE 5_3_1C - VIEWPOINT 1 - NORTH CALIFF DALES VOE - PLANAR WIR
- EIAR CHAPTER 5 FIGURE 5_3_20A VIEWPOINT 20 SKELD NATIONAL SCENIC AREA VIEWPOINT
- EIAR CHAPTER 5 FIGURE 5_3_20B VIEWPOINT 20 SKELD NATIONAL SCENIC AREA EXISTING W
- EIAR CHAPTER 5 FIGURE 5_3_20C VIEWPOINT 20 SKELD NATIONAL SCENIC AREA PLANAR WIR
- EIAR CHAPTER 5 FIGURE 5_3_20D VIEWPOINT 20 SKELD NATIONAL SCENIC AREA PLANAR MON
- EIAR CHAPTER 5 FIGURE 5_3_2A - VIEWPOINT 2- GREMISTA BRAE HOLMSGARTH LERWICK - V
- EIAR CHAPTER 5 FIGURE 5_3_2B- VIEWPOINT 2 -GREMISTA BRAE HOLMSGARTH LERWICK - EX
- EIAR CHAPTER 5 FIGURE 5_3_2C - VIEWPOINT 2 - GREMISTA BRAE HOLMSGARTH LERWICK -
- EIAR CHAPTER 5 FIGURE 5_3_3A - VIEWPOINT 3 - NORTH NESS BUS-PARK LERWICK - VIEWP
- EIAR CHAPTER 5 FIGURE 5_3_3B - VIEWPOINT 3 - NORTH NESS BUS-PARK LERWICK - EXIST
- EIAR CHAPTER 5 FIGURE 5_3_3C - VIEWPOINT 3 - NORTH NESS BUS-PARK LERWICK PLANAR
- EIAR CHAPTER 5 FIGURE 5_3_3D- VIEWPOINT 3 NORTH NESS BUS-PARK - PLANAR MONTAGE
- EIAR CHAPTER 5 FIGURE 5_3_4A VIEWPOINT 4 GILBERTSON PARK LERWICK - VIEWPOINT LOC
- DELEGATED REPORT OF HANDLING
- DECISION NOTICE
- CONSULTATION RESPONSE - BUILDING STANDARDS
- CONSULTATION RESPONSE SCOTTISH FIRE AND RESCUE SERVICE
- CONSULTATION RESPONSE - NHO
- CONSULTATION RESPONSE - NHO - LANDSCAPE
- CONSULTEE COMMENT - HES
- MOD COMMENTS
- NATURE SCOT- CONSULTATION COMMENTS
- ROADS COMMENTS
- OUTDOOR ACCESS COMMENTS
- HIAL COMMENTS
- ARCHAEOLOGIST COMMENTS
- ENVIRONMENTAL HEALTH COMMENTS
- SHETLAND TIMES ADVERT
- EDINBURGH GAZETTE ADVERT
- SHETLAND TIMES ADVERT
- SCOTTISH WATER COMMENTS
- DRAINAGE COMMENTS
- NATS COMMENTS
- EIAR CHAPTER 10 TRAFFIC AND TRANSPORT
- EIAR CHAPTER 11 GEOLOGY PEAT HYDROLOGY AND HYDROGEOLOGY
- EIAR CHAPTER 12 TELECOMMUNICATIONS AVIATION AND RADAR
- EIAR CHAPTER 13 SCHEDULE OF ENVIRONMNETAL COMMITMENTS
- EIAR CHAPTER 14 SUMMARY OF RESIDUAL EFFECTS
- EIAR CHAPTER 2 EIA METHODOLOGY
- EIAR CHAPTER 3 SITE SELECTION AND DESIGN
- EIAR CHAPTER 4 PROJECT DESCRIPTION
- EIAR CHAPTER 5 LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- EIAR CHAPTER 6 ECOLOGY
- EIAR CHAPTER 8 ARCHAEOLOGY AND CULTURAL HERITAGE
- EIAR CHAPTER 9 NOISE
- EIAR CHAPTER 4 FIGURE 4_3 TYPICAL ACCESS TRACK CROSS SECTION
- EIAR CHAPTER 4 FIGURE 4_4 BESS SITE ELEVATION LAYOUT
- EIAR CHAPTER 5 IGURE 5_5_2 - CUMULATIVE BLADE TIP ZTV WITH BUILT AND CONSENTED S
- EIAR CHAPTER 2 APPENDIX 2_1 EIA SCOPING REPORT
- EIAR CHAPTER 5 APPENDIX 5_1 LANDSCAPE AND VISUAL IMPACT ASSESSMENT METHODOLOGY
- EIAR CHAPTER 5 APPENDIX 5_2 LANDSCAPE CHARACTER TYPES WITHIN THE 20KM STUDY AREA
- EIAR CHAPTER 5 APPENDIX 5_3 COASTAL CHARACTER AREAS WITHIN THE 20KM STUDY AREA
- EIAR CHAPTER 5 APPENDIX 5_4 INVENTORY LISTED GARDENS AND DESIGNED LANDSCAPES
- EIAR CHAPTER 11 APPENDIX 11_1 OUTLINE PEAT MANAGEMENT PLAN
- EIAR CHAPTER 11 APPENDIX 11_2 PEAT LANDSLIDE HAZARD RISK ASSESSMENT
- EIAR CHAPTER 2 APPENDIX 2_2 SHETLAND ISLANDS COUNCIL EIA SCOPING OPINION
- EIAR CHAPTER 4 APPENDIX 4_1 OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- EIAR CHAPTER 42 APPENDIX 4_2 OUTLINE BATTERY SAFETY STATEMENT
- EIAR CHAPTER 5 APPENDIX 5_5 SPECIAL LANDSCAPE QUALITIES ASSESSMENT - SHETLAND NA
- EIAR CHAPTER 6 APPENDIX 6_1 GREMISTA EXTENDED PHASE1 HABITAT SURVEY AND PROTECTE
- EIAR CHAPTER 6 APPENDIX 6_2 NVC SURVEY REPORT
- EIAR CHAPTER 6 APPENDIX 6_4 OUTLINE BIODIVERSITY ENHANCEMENT PLAN
- EIAR CHAPTER 7 APPENDIX 7_1 YEAR 1 AVIAN REPORT SEPTEMBER 2020 TO AUGUST 2021
- EIAR CHAPTER 7 APPENDIX 7_2 COLLISION RISK MODELLING
- EIAR CHAPTER 8 APPENDIX 8_1 DESK BASED ASSESSMENT
- EIAR CHAPTER 8 APPENDIX 8_2 CULTURAL HERITAGE PLATES
- EIAR CHAPTER 8 APPENDIX 8_3 SETTINGS ASSESSMENT
- EIAR CHAPTER 8 APPENDIX 8_4 SITE GAZETTEER
- EIAR CHAPTER 9 APPENDIX 9_1 RECORDS OF CORRESPONDANCE
- EIAR CHAPTER 9 APPENDIX 9_2 TURBINE SOURCE NOISE TERMS
- EIAR CHAPTER 9 APPENDIX 9_3 PREDICTED NOISE LEVELS COMPARISON
- APPLICATION PDF
- EIAR CHAPTER 5 FIGURE 8_5_3 ARCHWIRE 3 HAWKS NESS BROCH AT CORBIE GEO
Trade members open them from here.
Open the documentsWhat this grant of permission means
Shetland Islands granted permission on 28 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Luggies Knowe, Hill of Gremista
Section 42 application to vary Condition 8 on 2024/006/PPF - Change of hub height from 82m to 92m
Granted Conditions 19 docs
Other full applications
In Shetland Islands
-
2025/317/PPF Granted
Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU
The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.
-
2026/081/PPF Granted
The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN
To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.
-
2026/103/PPF Granted
Mossy Hill Wind Farm Lerwick Shetland
To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry
-
2026/052/PPF Granted
Land To The East Of A970, Hill Of Wethersta, Shetland.
The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.
-
2026/093/PPF Granted
Whirlie Sandwick Shetland ZE2 9HN
To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.