Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.

Granted Shetland Islands 2024/006/PPF Planning Permission Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The Proposed Development replaces two previously consented wind turbines at Luggies Knowe, Gremista and will comprise the construction and operation of one wind turbine with a ground to blade tip height of up to 149.9 m, battery energy storage system units, site access tracks and associated infrastructure

As published by the council, reference 2024/006/PPF

Application record

Reference
2024/006/PPF
Type
Planning Permission Full
Status
Decided
Decision
Grant subject to conditions
Received
8 Dec 2025
Validated
22 Jan 2024
Decided
28 Nov 2024
Parish
LERWICK
Decision by
Delegated Decision

Site history

Applications at this address on the Shetland Islands register

This site has had 5 applications since 2025: 3 approved, 0 refused.

  • 2024/006/DCON3 Decided

    Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.

    Application for consent, agreement or approval required by planning condition: 6 (Decommissioning) of planning application 2024/006/PPF

    Submitted 15 Jul 2026
  • 2024/006/DCON Awaiting decision

    Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.

    Application for consent, agreement or approval required by planning condition: 14 (Written Scheme of Investigation for Archaeology) of planning application 2024/006/PPF

    Submitted 3 Jul 2026 Conditions
  • 2024/006/DCON2 Granted

    Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.

    Application for consent, agreement or approval required by planning condition: 16 (Aviation Lighting) of planning application 2024/006/PPF

    Decided 25 Feb 2026 Conditions
  • 2024/006/DCON1 Granted

    Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.

    Application for consent, agreement or approval required by planning condition: 12 (Ecological Clerk of Works) of planning application 2024/006/PPF

    Decided 3 Feb 2026 Conditions

Timeline

Dates from the published record

  1. 22 Jan 2024

    Validated

    Checked as complete and ready for consideration.

  2. 28 Nov 2024

    Decision issued: Grant subject to conditions

  3. 8 Dec 2025

    Received by Shetland Islands

  4. 11 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

5 later applications on the register refer to this one:

  • 2024/006/DCON3 Decided

    Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.

    Application for consent, agreement or approval required by planning condition: 6 (Decommissioning) of planning application 2024/006/PPF

    Submitted 15 Jul 2026
  • 2024/006/DCON Awaiting decision

    Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.

    Application for consent, agreement or approval required by planning condition: 14 (Written Scheme of Investigation for Archaeology) of planning application 2024/006/PPF

    Submitted 3 Jul 2026 Conditions
  • 2024/006/DCON2 Granted

    Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.

    Application for consent, agreement or approval required by planning condition: 16 (Aviation Lighting) of planning application 2024/006/PPF

    Decided 25 Feb 2026 Conditions
  • 2026/014/VCON Granted

    Luggies Knowe, Hill of Gremista

    Section 42 application to vary Condition 8 on 2024/006/PPF - Change of hub height from 82m to 92m

    Decided 12 May 2026 Conditions
  • 2024/006/DCON1 Granted

    Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.

    Application for consent, agreement or approval required by planning condition: 12 (Ecological Clerk of Works) of planning application 2024/006/PPF

    Decided 3 Feb 2026 Conditions

Who's behind it

Company information only, from the register and Companies House

Agent on file

7 applications on PlanIndex · across 5 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

211 documents on file for this application

  • DISCHARGE OF CONDITION 16 - APPROVED Decision · 25 Feb 2026
  • AVIATION LIGHTING Approved Detail · 25 Feb 2026
  • DISCHARGE OF CONDITION 12- APPROVED Decision · 03 Feb 2026
  • DCON APPLICATION Application Form · 08 Dec 2025
  • COVER LETTER / CV Approved Detail · 03 Feb 2025
  • SHETLAND TIMES ADVERT - DECISION MADE Advert · 06 Dec 2024
  • A LOCATION PLAN Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 1 INTRODUCTION Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 1 FIGURE 1_1 SITE LOCATION PLAN Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 1 FIGURE 1_2 SITE LAYOUT PLAN Approved Plans · 28 Nov 2024
  • EIAR - LUGGIES KNOWE EIA REPORT FRONT COVERS CONTENTS AND ABBREVIATIONS Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 1 FIGURE 8_1 HERITAGE ASSETS WITHIN 1KM Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 11 FIG 11_2 SUPERFICIAL GEOLOGY Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 11 FIGURE 11_1 HYDROLOGICAL FEATURES Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 11 FIGURE 11_3 PEAT DEPTH CONTOUR Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 11 FIGURE 11_4 BEDROCK GEOLOGY Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 11 FIGURE 11_5 HYDROGEOLOGICAL OVERVIEW Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 11 FIGURE 11_6 GWDTE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 12 FIGURE 12_1 TELECOMMUNICATIONS LINK Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 3 FIGURE 3_2 LAYOUT 1 Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 3 FIGURE 3_3 LAYOUT 2 Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 3 FIGURE 3_4 LAYOUT 3 Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 3 FIGURE 3_5 LAYOUT 4 Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 3 FIGURE 3_6 LAYOUT 5 Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 3 FIGURE 3_7 LAYOUT 6 Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 2_2_2A BLADE TIP ZTV QUADRANT A Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_1_1 LVIA STUDY AREA Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_1_2 LVIA DESIGNATIONS Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_1_3 LVIA CHARACTER TYPES Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_1_4 LVIA VIEWPOINNTS Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_1 BLADE TIP ZTV Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_10 COMPARATIVE ZTV OVERLAID WITH LANDSCAPE DESIGNATION Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_11 PROPOSED LUGGIES KNOWE EXTENSION VS VISIBILITY OF B Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_2B BLADE TIP ZTV QUADRANT B Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_2C BLADE TIP ZTV QUADRANT C Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_2D BLADE TIP ZTV QUADRANT D Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_3 HUB HEIGHT ZTV Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_4A HUB HEIGHT ZTV QUADRANT A Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_4B HUB HEIGHT ZTV QUADRANT B Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_4C HUB HEIGHT ZTV QUADRANT C Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_4D HUB HEIGHT ZTV QUADRANT D Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_5 BLADE TIP ZTV OVERLAID WITH LANDSCAPE DESIGNATIONS L Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_6 HUB HEIGHT ZTV OVERLAID WITH LANDSCAPE DESIGNATIONS Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 6 FIGURE 6_5 GWDTE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 7 FIGURE 7_1 PROPOSED VPS AND VIEWSHEDS AND SITE LOCATION Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 7 FIGURE 7_2 ORNITHOLOGICAL DESIGNATIONS Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 8 FIGURE 8_2 HERITAGE ASSETS WITHIN 5KM Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 8 FIGURE 8_3 DESIGNATED HERITAGE ASSETS WITHIN 10KM Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 8 FIGURE 8_4 EXTRACT FROM ORDNANCE SURVEY MAP 1881 Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 9 FIGURE 9_1 NSRS AND 35 DB CONTOUR Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 9 FIGURE 9_2 CUMULATIVE STUDY AREA Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_10A VIEWPOINT 10 GIRLSTA A970 VIEWPOINT LOCATION PLAN Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_10B VIEWPOINT 10 GIRLSTA A970 Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_7 BLADE TIP ZTV OVERLAID WITH LANDSCAPE DESIGNATIONS L Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_2_9 COMPARATIVE ZTV OVERLAID WITH LANDSCAPE DESIGNATIONS Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE FIGURE 5_2_8 HUB HEIGHT ZTV OVERLAID WITH LANDSCAPE DESIGN Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_4_1A LVIA CUMULATIVE SITE PLAN 60KM Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_4_1B LVIA CUMULATIVE SITE PLAN 40KM Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_5_1 CUMULATIVE BLADE TIP ZTV WITH BUILT AND CONSENTED SI Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 6 FIGURE 6_1 SITE LOCATION PLAN Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 6 FIGURE 6_2 DESIGNATED SITES Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 6 FIGURE 6_3 NVC RESULTS Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 6 FIGURE 6_4 PHASE 1 CORRESPONDING HABITATS Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_7B VIEWPOINT 7 GARDIE HOUSE BRESSAY EXISTING WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_7C VIEWPOINT 7 GARDIE HOUSE BRESSAY PLANAR WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_7D VIEWPOINT 7 GARDIE HOUSE BRESSAY PLANAR MONTAGE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_8A VIEWPOINT A THE KNAB LERWICK VIEWPOINT LOCATION PLA Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_8B VIEWPOINT 8 THE KNAB LERWICK EXISTING WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_8C VIEWPOINT 8 THE KNAB LERWICK PLANAR WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_8D VIEWPOINT 8 PLANAR MONTAGE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_9A VIEWPOINT 9 BEOSETTER BRESSAY VIEWPOINT LOCATION PL Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_9B VIEWPOINT 9 BEOSETTER BRESSAY EXISTING WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_9D VIEWPOINT 9 BEOSETTER BRESSAY PLANAR MONTAGE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_6_1A CUMULATIVE VIEWPOINT 1 VIEWPOINT 11 NEBISTER HILL V Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_6_1B CUMULATIVE VIEWPOINT 1 VIEWPOINT 11 NEBISTER HILL N Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_6_1C CUMULATIVE VIEWPOINT 1 VIEWPOINT 11 NEBISTER HILL E Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_6_2A CUMULATIVE VIEWPOINT 2 VIEWPOINT 17 SCORE HILL AITH Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_6_2B CUMULATIVE VIEWPOINT 2 VIEWPOINT 17 SCORE HILL AITH Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_6_2C CUMULATIVE VIEWPOINT 2 VIEWPOINT 17 SCORE HILL AITH Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 8_5_1A - ARCHWIRE 1 CULTURAL HERITAGE VIEWPOINT 1 TEIND BA Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 8_5_1B ARCHWIRE 1 VIEWPOINT 1 EXISTING WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 8_5_1C ARCHWIRE 1 VIEWPOINT 1 TEIND BARN120M NORTH OF KEBI Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 8_5_1D ARCHWIRE 1 VIEWPOINT 1 PLANAR MONTAGE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 8_5_2 CULTURAL HERITAGE VIEWPOINT 2 LAW TING HOLM Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE FIGURE 5_3_1B VIEWPOINT 1 - NORTH CALIFF DALES VOE - WIREL Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE FIGURE 5_3_6A VIEWPOINT 6 BRESSAY FERRY VIEWPOINT LOCATION Approved Plans · 28 Nov 2024
  • FIGURE 5_3_12B VIEWPOINT 12 LOCH OF TINGWALL Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 4 FIGURE 4_1 ENVIRONMENTAL CONSTRAINTS Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 4 FIGURE 4_2 CUMULATIVE DEVELOPMENTS Approved Plans · 28 Nov 2024
  • EIAR - NON-TECHNICAL SUMMARY Approved Plans · 28 Nov 2024
  • EIAR - SUPPORTING PLANNING STATEMENT Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_4B VIEWPOINT 4 GILBERTSON PARK LERWICK EXISTING WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_4C VIEWPOINT 4 GILBERTSON PARK LERWICK PLANAR WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_4D VIEWPOINT 4 GILBERTSON PARK LERWICK PLANAR MONTAGE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_5A VIEWPOINT 5 FORT CHARLOTTE LERWICK VIEWPOINT LOCATI Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_5B VIEWPOINT 5 FORT CHARLOTTE LERWICK EXISTING WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_5D VIEWPOINT 5 FORT CHARLOTTE LERWICK PLANAR MONTAGE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_6B VIEWPOINT 6 BRESSAY FERRY EXISTING WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_6C VIEWPOINT 6 BRESSAY FERRY PLANAR WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_6D VIEWPOINT 6 BRESSAY FERRY PLANAR MONTAGE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_7A VIEWPOINT 7 GARDIE HOUSE BRESSAY VIEWPOINT LOCATION Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_10C VIEWPOINT 10 GIRLSTA A970 Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_10D VIEWPOINT 10 GIRLSTA A970 Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_11A VIEWPOINT 11 NEBISTER HILL VIEWPOINT LOCATION PLAN Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_11B VIEWPOINT 11 NEBISTER HILL Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_11C VIEWPOINT 11 NEBISTER HILL Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_11D VIEWPOINT 11 NEBISTER HILL Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_12A VIEWPOINT 12 LOCH OF TINGWALL VIEWPOINT LOCATION P Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_12C VIEWPOINT 12 LOCH OF TINGWALL Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_12D VIEWPOINT 12 LOCH OF TINGWALL Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_13A VIEWPOINT 13 GLETNESS VIEWPOINT LOCATION PLAN Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_13B VIEWPOINT 13 GLETNESS EXISTING WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_13C VIEWPOINT 13 GLETNESS PLANAR WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_13D VIEWPOINT 13 GLETNESS PLANAR MONTAGE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_14C VIEWPOINT 14 KIRKABISTER PLANAR WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_14D VIEWPOINT 14 KIRKABISTER PLANAR MONTAGE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_15A VIEWPOINT 15 FREESTER NEARR LOCH BENSON SOUTH NEST Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_15B VIEWPOINT 15 FREESTER NEAR LOCH BENSON SOUTH NESTI Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_15C VIEWPOINT 15 FREESTER NEAR LOCH BENSON SOUTH NESTI Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_15D VIEWPOINT 15 FREESTER NEAR LOCH BENSON SOUTH NESTI Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_16A VIEWPOINT 16 HELLI NESS VIEWPOINT LOCATION PLAN Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_16B VIEWPOINT 16 HELLI NESS EXISTING WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_16C VIEWPOINT 16 HELLI NESS PLANAR WIRE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_16D VIEWPOINT 16 HELLI NESS PLANAR MONTAGE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_17A VIEWPOINT 17 SCORE HILL AITHNESS BRESSAY VIEWPOINT Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_17B VIEWPOINT 17 SCORE HILL AITHNESS BRESSAY EXISTING Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_17C VIEWPOINT 17 SCORE HILL AITHNESS BRESSAY PLANAR WI Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_17D VIEWPOINT 17 SCORE HILL AITHNESS BRESSAY PLANAR MO Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_18A VIEWPOINT 18 WEST BURRA NSA VIEWPOINT LOCATION PLA Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_18B VIEWPOINT 18 WEST BURRA NATIONAL SCENIC AREA EXIST Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_18C VIEWPOINT 18 WEST BURRA NATIONAL SCENIC AREA PLANA Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_18D VIEWPOINT 18 WEST BURRA NATIONAL SCENIC AREA PLANA Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_19A VIEWPOINT 19 REAWICK NATIONAL SCENIC AREA VIEWPOIN Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_19B VIEWPOINT 19 REAWICK NATIONAL SCENIC AREA EXISTING Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_19C VIEWPOINT 19 REAWICK NATIONAL SCENIC AREA PLANAR W Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_19D VIEWPOINT 19 REAWICK NATIONAL SCENIC AREA PLANAR M Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_1A - VIEWPOINT 1 - NORTH CALIFF DALES VOE - VIEWPOINT Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_1D - VIEWPOINT 1 - NORTH CALIFF DALES VOE - PLANAR MON Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_1C - VIEWPOINT 1 - NORTH CALIFF DALES VOE - PLANAR WIR Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_20A VIEWPOINT 20 SKELD NATIONAL SCENIC AREA VIEWPOINT Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_20B VIEWPOINT 20 SKELD NATIONAL SCENIC AREA EXISTING W Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_20C VIEWPOINT 20 SKELD NATIONAL SCENIC AREA PLANAR WIR Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_20D VIEWPOINT 20 SKELD NATIONAL SCENIC AREA PLANAR MON Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_2A - VIEWPOINT 2- GREMISTA BRAE HOLMSGARTH LERWICK - V Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_2B- VIEWPOINT 2 -GREMISTA BRAE HOLMSGARTH LERWICK - EX Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_2C - VIEWPOINT 2 - GREMISTA BRAE HOLMSGARTH LERWICK - Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_3A - VIEWPOINT 3 - NORTH NESS BUS-PARK LERWICK - VIEWP Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_3B - VIEWPOINT 3 - NORTH NESS BUS-PARK LERWICK - EXIST Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_3C - VIEWPOINT 3 - NORTH NESS BUS-PARK LERWICK PLANAR Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_3D- VIEWPOINT 3 NORTH NESS BUS-PARK - PLANAR MONTAGE Approved Plans · 28 Nov 2024
  • EIAR CHAPTER 5 FIGURE 5_3_4A VIEWPOINT 4 GILBERTSON PARK LERWICK - VIEWPOINT LOC Approved Plans · 28 Nov 2024
  • DELEGATED REPORT OF HANDLING Delegated Report of Handling · 28 Nov 2024
  • DECISION NOTICE Decision · 28 Nov 2024
  • CONSULTATION RESPONSE - BUILDING STANDARDS Consultee Comment · 17 May 2024
  • CONSULTATION RESPONSE SCOTTISH FIRE AND RESCUE SERVICE Consultee Comment · 02 May 2024
  • CONSULTATION RESPONSE - NHO Consultee Comment · 24 Apr 2024
  • CONSULTATION RESPONSE - NHO - LANDSCAPE Consultee Comment · 28 Mar 2024
  • CONSULTEE COMMENT - HES Consultee Comment · 05 Mar 2024
  • MOD COMMENTS Consultee Comment · 28 Feb 2024
  • NATURE SCOT- CONSULTATION COMMENTS Consultee Comment · 22 Feb 2024
  • ROADS COMMENTS Consultee Comment · 06 Feb 2024
  • OUTDOOR ACCESS COMMENTS Consultee Comment · 02 Feb 2024
  • HIAL COMMENTS Consultee Comment · 01 Feb 2024
  • ARCHAEOLOGIST COMMENTS Consultee Comment · 31 Jan 2024
  • ENVIRONMENTAL HEALTH COMMENTS Consultee Comment · 30 Jan 2024
  • SHETLAND TIMES ADVERT Advert · 26 Jan 2024
  • EDINBURGH GAZETTE ADVERT Advert · 26 Jan 2024
  • SHETLAND TIMES ADVERT Advert · 26 Jan 2024
  • SCOTTISH WATER COMMENTS Consultee Comment · 26 Jan 2024
  • DRAINAGE COMMENTS Consultee Comment · 24 Jan 2024
  • NATS COMMENTS Consultee Comment · 24 Jan 2024
  • EIAR CHAPTER 10 TRAFFIC AND TRANSPORT Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 11 GEOLOGY PEAT HYDROLOGY AND HYDROGEOLOGY Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 12 TELECOMMUNICATIONS AVIATION AND RADAR Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 13 SCHEDULE OF ENVIRONMNETAL COMMITMENTS Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 14 SUMMARY OF RESIDUAL EFFECTS Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 2 EIA METHODOLOGY Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 3 SITE SELECTION AND DESIGN Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 4 PROJECT DESCRIPTION Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 5 LANDSCAPE AND VISUAL IMPACT ASSESSMENT Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 6 ECOLOGY Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 8 ARCHAEOLOGY AND CULTURAL HERITAGE Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 9 NOISE Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 4 FIGURE 4_3 TYPICAL ACCESS TRACK CROSS SECTION Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 4 FIGURE 4_4 BESS SITE ELEVATION LAYOUT Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 5 IGURE 5_5_2 - CUMULATIVE BLADE TIP ZTV WITH BUILT AND CONSENTED S Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 2 APPENDIX 2_1 EIA SCOPING REPORT Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 5 APPENDIX 5_1 LANDSCAPE AND VISUAL IMPACT ASSESSMENT METHODOLOGY Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 5 APPENDIX 5_2 LANDSCAPE CHARACTER TYPES WITHIN THE 20KM STUDY AREA Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 5 APPENDIX 5_3 COASTAL CHARACTER AREAS WITHIN THE 20KM STUDY AREA Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 5 APPENDIX 5_4 INVENTORY LISTED GARDENS AND DESIGNED LANDSCAPES Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 11 APPENDIX 11_1 OUTLINE PEAT MANAGEMENT PLAN Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 11 APPENDIX 11_2 PEAT LANDSLIDE HAZARD RISK ASSESSMENT Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 2 APPENDIX 2_2 SHETLAND ISLANDS COUNCIL EIA SCOPING OPINION Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 4 APPENDIX 4_1 OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 42 APPENDIX 4_2 OUTLINE BATTERY SAFETY STATEMENT Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 5 APPENDIX 5_5 SPECIAL LANDSCAPE QUALITIES ASSESSMENT - SHETLAND NA Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 6 APPENDIX 6_1 GREMISTA EXTENDED PHASE1 HABITAT SURVEY AND PROTECTE Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 6 APPENDIX 6_2 NVC SURVEY REPORT Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 6 APPENDIX 6_4 OUTLINE BIODIVERSITY ENHANCEMENT PLAN Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 7 APPENDIX 7_1 YEAR 1 AVIAN REPORT SEPTEMBER 2020 TO AUGUST 2021 Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 7 APPENDIX 7_2 COLLISION RISK MODELLING Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 8 APPENDIX 8_1 DESK BASED ASSESSMENT Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 8 APPENDIX 8_2 CULTURAL HERITAGE PLATES Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 8 APPENDIX 8_3 SETTINGS ASSESSMENT Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 8 APPENDIX 8_4 SITE GAZETTEER Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 9 APPENDIX 9_1 RECORDS OF CORRESPONDANCE Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 9 APPENDIX 9_2 TURBINE SOURCE NOISE TERMS Supporting Documents · 11 Jan 2024
  • EIAR CHAPTER 9 APPENDIX 9_3 PREDICTED NOISE LEVELS COMPARISON Supporting Documents · 11 Jan 2024
  • APPLICATION PDF Application Form · 11 Jan 2024
  • EIAR CHAPTER 5 FIGURE 8_5_3 ARCHWIRE 3 HAWKS NESS BROCH AT CORBIE GEO Supporting Documents · 11 Jan 2024

Trade members open them from here.

Open the documents

What this grant of permission means

Shetland Islands granted permission on 28 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Luggies Knowe, Hill of Gremista

    2026/014/VCON Submitted 23 Jan 2026 0m away

    Section 42 application to vary Condition 8 on 2024/006/PPF - Change of hub height from 82m to 92m

    Granted Conditions 19 docs

In Shetland Islands

  • 2025/317/PPF Granted

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.

    19 Dec 2025 Full applications
  • 2026/081/PPF Granted

    The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN

    To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.

    9 Apr 2026 Full applications
  • 2026/103/PPF Granted

    Mossy Hill Wind Farm Lerwick Shetland

    To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry

    22 May 2026 Full applications
  • 2026/052/PPF Granted

    Land To The East Of A970, Hill Of Wethersta, Shetland.

    The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.

    6 Mar 2026 Full applications
  • 2026/093/PPF Granted

    Whirlie Sandwick Shetland ZE2 9HN

    To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.