Skip to content
PlanIndex Get alerts
Menu

Planning application

Lodge & Bird Observatory Fair Isle Shetland ZE2 9JU

Granted Shetland Islands 2021/355/NMV Planning Permission Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non-material variation - Revision to external sprinkler tank

As published by the council, reference 2021/355/NMV

Application record

Reference
2021/355/NMV
Type
Planning Permission Full
Status
Decided
Decision
Approved
Received
20 Nov 2024
Validated
20 Nov 2024
Decided
3 Dec 2024
Ward
Dunrossness
Parish
DUNROSSNESS
Decision by
Delegated Decision
Postcode
ZE2 9JU

Timeline

Dates from the published record

  1. 20 Nov 2024

    Received by Shetland Islands

  2. 3 Dec 2024

    Decision issued: Approved

  3. 11 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Inverness

5 applications on PlanIndex · across 3 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Lodge & Bird Observatory Fair Isle Shetland ZE2 9JU

    2026/182/PPF Submitted 31 Aug 2026 0m away

    99% historically approved · decision due ~26 Oct

    To erect a 12m x 4m polycrub.

    Awaiting decision 7 docs
  • Church Of Scotland Fair Isle Shetland ZE2 9JU

    2026/082/DCON1 Submitted 16 Jul 2026 0m away

    99% historically approved · decision due ~10 Sep

    Application for consent, agreement or approval required by planning Condition: 02 (Photographic Survey) & Condition 03 (Pew Details) of planning application 2026/082/LBC.

    Decided 4 docs
  • North Haven Fair Isle Shetland ZE2 9JU

    2023/142/DCON8 Submitted 5 Mar 2026 0m away

    Application for consent, agreement or approval required by planning condition 9 (Vehicle Parking and turning).

    Granted Conditions 8 docs
  • Pund Fair Isle Shetland ZE2 9JU

    2022/278/DCON5 Submitted 22 Aug 2025 0m away

    Application for consent, agreement or approval required by planning condition: 4 - (Biosecurity) of planning application 2022/278/PPF

    Granted Conditions 4 docs
  • Pund Fair Isle Shetland ZE2 9JU

    2022/278/DCON3 Submitted 18 Aug 2025 0m away

    Application for consent, agreement or approval required by planning condition: 5 - Timber Fence of planning application 2022/278/PPF

    Granted Conditions 3 docs
    Small domestic
  • Pund Fair Isle Shetland ZE2 9JU

    2022/278/DCON2 Submitted 18 Aug 2025 0m away

    Application for consent, agreement or approval required by planning conditions: 7 - Visability Splays, Condition 8: Access Arrangements, Condition 9: Surfacing of planning application 2022/278/PPF

    Granted Conditions 3 docs

In Shetland Islands

  • 2025/317/PPF Granted

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.

    19 Dec 2025 Full applications
  • 2026/081/PPF Granted

    The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN

    To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.

    9 Apr 2026 Full applications
  • 2026/103/PPF Granted

    Mossy Hill Wind Farm Lerwick Shetland

    To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry

    22 May 2026 Full applications
  • 2026/052/PPF Granted

    Land To The East Of A970, Hill Of Wethersta, Shetland.

    The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.

    6 Mar 2026 Full applications
  • 2026/093/PPF Granted

    Whirlie Sandwick Shetland ZE2 9HN

    To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.

    11 May 2026 Full applications