Planning application
Trondra Public Hall Grindadale Trondra Shetland ZE1 0XL
Works: Roofing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
To re-roof the existing building and to install air source heat pumps
As published by the council, reference 2021/196/PPF
Application record
- Reference
- 2021/196/PPF
- Type
- Planning Permission Full
- Status
- Decided
- Decision
- Granted As published: Grant subject to conditions
- Received
- 11 Jun 2021
- Validated
- 17 Jun 2021
- Decided
- 9 Sep 2021
- Ward
- Burra & Trondra
- Parish
- BURRA & TRONDRA
- Decision by
- Delegated Decision
- Postcode
- ZE1 0XL
Timeline
Dates from the published record
-
11 Jun 2021
Received by Shetland Islands
-
17 Jun 2021
Validated
Checked as complete and ready for consideration.
-
9 Sep 2021
Decision issued: Grant subject to conditions
-
10 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Scottishbuildingwarrant: BW/2021/088 (Building Work Complete)
Who's behind it
Company information only, from the register and Companies House
DITT Construction Ltd Agent, a construction firm
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
- AIR SOURCE HEAT PUMP SPECIFICATION DETAILS
- EXISTING PLANS SECTIONS AND ELEVATIONS
- SITE AND LOCATION PLAN
- PROPOSED PLANS SECTIONS AND ELEVATIONS
- DELEGATED REPORT OF HANDLING
- DECISION NOTICE
- ENVIRONMENTAL HEALTH CONSULTATION RESPONSE
- SHETLAND TIMES ADVERT
- AIR SOURCE HEAT PUMP CALCULATION
- AIR SOURCE HEAT PUMP CALCULATION
- AIR SOURCE HEAT PUMP SPECIFICATION DETAILS
- APPLICATION FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Shetland Islands granted permission on 9 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Shetland Islands
-
2026/081/PPF Granted
The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN
To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.
-
2026/103/PPF Granted
Mossy Hill Wind Farm Lerwick Shetland
To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry
-
2026/052/PPF Granted
Land To The East Of A970, Hill Of Wethersta, Shetland.
The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.
-
2026/093/PPF Granted
Whirlie Sandwick Shetland ZE2 9HN
To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.
-
2026/116/PPF Granted
Cunningsburgh FC Changing Room Da Moors Cunningsburgh Shetland ZE2 9HB
7.4m x 4.7m extension to changing facility