Skip to content
PlanIndex Get alerts
Menu

Planning application

Church Road Lerwick

Granted Shetland Islands 2021/101/PPF Planning Permission Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retrospective Application to site a 44kW electric vehicle charge point to serve two parking spaces, one of them a disabled parking space. installation includes a mini-pillar to house the SSEN cutout, electricity supply meter etc.

As published by the council, reference 2021/101/PPF

Application record

Reference
2021/101/PPF
Type
Planning Permission Full
Status
Decided
Decision
Grant subject to conditions
Received
12 Mar 2021
Validated
12 Mar 2021
Decided
31 Aug 2021
Parish
LERWICK
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 12 Mar 2021

    Received by Shetland Islands

  2. 31 Aug 2021

    Decision issued: Grant subject to conditions

  3. 31 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

8 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

32 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 10 CHROMATE LANE Lerwick Shetland ZE1 0AL

    2026/048/PN Submitted 2 Mar 2026 17m away

    Proposed change of existing hardwood windows with like for like Upvc windows

    Granted Prior approval Windows or glazing 9 docs
  • 81 Commercial Street Lerwick Shetland ZE1 0AD

    2025/209/LBC Submitted 13 Aug 2025 76m away

    Demolition of roof and first floor of existing extension and construction of new mono-pitch roof to extension. Repair and reinstatement of existing damaged blockwork and external finishes.

    Granted Heritage and listed buildings Extension Demolition 25 docs
  • 81 Commercial Street Lerwick Shetland ZE1 0AD

    2025/210/PPF Submitted 13 Aug 2025 76m away

    Demolition of roof and first floor of existing extension and construction of new mono-pitch roof to extension. Repair and reinstatement of existing damaged blockwork and external finishes.

    Granted Full applications Extension Demolition 26 docs
  • 81 Commercial Street Lerwick Shetland ZE1 0AD

    2026/122/LBC Submitted 4 Jun 2026 98m away

    99% historically approved · decision due ~7 Aug

    Proposed replacement of the existing ATM located on the east facade of Queens Lane with a new ATM within the existing aperture

    Decided Heritage and listed buildings 13 docs
  • Kveldsro House Hotel Greenfield Place Lerwick Shetland ZE1 0AQ

    2026/130/PN Submitted 11 Jun 2026 106m away

    99% historically approved · decision due ~13 Aug

    Replacement of 40 no. windows like for like with double glazed timber sash coloured white for original building and double glazed white uPVC windows. 26 no. window frames to be changed from red to white to match other frames

    Awaiting decision Prior approval Windows or glazing 5 docs
  • Kveldsro House Hotel 20 Greenfield Place Lerwick Shetland ZE1 0AQ

    2026/159/PPF Submitted 31 Jul 2026 106m away

    99% historically approved · decision due ~6 Oct

    Installation of a new external pedestrian accessible ramp with handrail, inc alterations to doors and windows, onsite parking adjustments, a new covered cycle rack and a new rooflight.

    Awaiting decision Loft or dormer Windows or glazing 17 docs

In Shetland Islands

  • 2025/317/PPF Granted

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.

    19 Dec 2025 Full applications
  • 2026/081/PPF Granted

    The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN

    To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.

    9 Apr 2026 Full applications
  • 2026/103/PPF Granted

    Mossy Hill Wind Farm Lerwick Shetland

    To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry

    22 May 2026 Full applications
  • 2026/052/PPF Granted

    Land To The East Of A970, Hill Of Wethersta, Shetland.

    The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.

    6 Mar 2026 Full applications
  • 2026/093/PPF Granted

    Whirlie Sandwick Shetland ZE2 9HN

    To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.

    11 May 2026 Full applications