Skip to content
PlanIndex Get alerts
Menu

Planning application

Eastshore Virkie Shetland ZE3 9JS

Granted Shetland Islands 2021/065/PPF Planning Permission Full

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed extension to form new entrance porch and sun lounge. Conversion of outbuilding to form new lounge. Cladding of external walls of kitchen extension. Re-roofing of entire dwelling roof. Erection of detached double garage.

As published by the council, reference 2021/065/PPF

Application record

Reference
2021/065/PPF
Type
Planning Permission Full
Status
Decided
Decision
Granted As published: Grant subject to conditions
Received
15 Feb 2021
Validated
26 Feb 2021
Decided
20 Jul 2021
Parish
DUNROSSNESS
Decision by
Delegated Decision
Postcode
ZE3 9JS

Timeline

Dates from the published record

  1. 15 Feb 2021

    Received by Shetland Islands

  2. 26 Feb 2021

    Validated

    Checked as complete and ready for consideration.

  3. 20 Jul 2021

    Decision issued: Grant subject to conditions

  4. 5 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Scottishbuildingwarrant: BW/2021/071 (Warrant Expired)

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

  • NID FORM Discharge of Condition(s) · 16 Aug 2021
  • COVER EMAIL WITH NID FORM Discharge of Condition(s) · 16 Aug 2021
  • LOCATION PLAN Approved Plans · 21 Jul 2021
  • EXISTING FLOOR AND ELEVATIONS Approved Plans · 21 Jul 2021
  • PROPOSED FLOOR AND ELEVATIONS Approved Plans · 21 Jul 2021
  • EXISTING SITE PLAN Approved Plans · 21 Jul 2021
  • PROPOSED SITE PLAN Approved Plans · 21 Jul 2021
  • REPORT Delegated Report of Handling · 21 Jul 2021
  • DECISION NOTICE Decision · 21 Jul 2021
  • ROAD SERVICE CONSULTATION RESPONSE Consultee Comment · 18 Jun 2021
  • FLOODING AND DRAINAGE RECONSULTATION RESPONSE Consultee Comment · 31 May 2021
  • ROAD SERVICE RECONSULTATION RESPONSE Consultee Comment · 31 May 2021
  • ROAD SERVICE CONSULTATION RESPONSE SUPPORTING DOCUMENT Consultee Comment · 31 May 2021
  • PROPOSED SITE PLAN Superseded Drawing · 28 May 2021
  • RECONSULTATION COMMENT - DRAIN/FLOOD Consultee Comment · 26 May 2021
  • HIAL CONSULTATION RESPONSE Consultee Comment · 21 May 2021
  • PROPOSED SITE PLAN Superseded Drawing · 10 May 2021
  • TO APPLICANT RE ADDITIONAL INFO REQUIRED Correspondence · 03 May 2021
  • ROAD AUTHORITY CONSULTATION RESPONSE Consultee Comment · 10 Mar 2021
  • NATS CONSULTATION RESPONSE Consultee Comment · 09 Mar 2021
  • P HARVEY REPRESENTATION Representation · 09 Mar 2021
  • NATS CONSULTATION RESPONSE Consultee Comment · 09 Mar 2021
  • FLOODING AND DRAINAGE CONSULTATION RESPONSE Consultee Comment · 01 Mar 2021
  • PROPOSED SITE PLAN AND GARAGE DETAILS Superseded Drawing · 24 Feb 2021
  • APPLICATION FORM Application Form · 15 Feb 2021
  • EXISTING SITE PLAN Superseded Drawing · 15 Feb 2021

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Shetland Islands granted permission on 20 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Shetland Islands

  • 2026/081/PPF Granted

    The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN

    To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.

    Received 9 Apr, published by the council 28 Jul 2026 Full applications
  • 2026/103/PPF Granted

    Mossy Hill Wind Farm Lerwick Shetland

    To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry

    Received 22 May, published by the council 28 Jul 2026 Full applications
  • 2026/052/PPF Granted

    Land To The East Of A970, Hill Of Wethersta, Shetland.

    The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.

    Received 6 Mar, published by the council 28 Jul 2026 Full applications
  • 2026/093/PPF Granted

    Whirlie Sandwick Shetland ZE2 9HN

    To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.

    Received 11 May, published by the council 28 Jul 2026 Full applications
  • 2026/116/PPF Granted

    Cunningsburgh FC Changing Room Da Moors Cunningsburgh Shetland ZE2 9HB

    7.4m x 4.7m extension to changing facility

    Received 3 Jun, published by the council 28 Jul 2026 Full applications