Planning application
Plot (Goose Park) Bressay Shetland
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erect dwellinghouse with decking and air source heat pump
As published by the council, reference 2020/269/PPF
Application record
- Reference
- 2020/269/PPF
- Type
- Planning Permission Full
- Status
- Decided
- Decision
- Granted As published: Grant subject to conditions
- Received
- 30 Nov 2020
- Validated
- 11 Jan 2021
- Decided
- 18 Aug 2021
- Parish
- BRESSAY
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
30 Nov 2020
Received by Shetland Islands
-
11 Jan 2021
Validated
Checked as complete and ready for consideration.
-
18 Aug 2021
Decision issued: Grant subject to conditions
-
11 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
31 documents on file for this application
- REPORT
- DECISION NOTICE
- EXISTING ROAD ACCESS PLAN
- PROPOSED GROUND FLOOR PLAN
- PROPOSED LOFT PLAN
- AIR SOURCE HEAT PUMP SPEC
- LOCATION PLAN
- PROPOSED ELEVATIONS
- SITE PLAN
- OVERMARKED SITE PLAN WITH FILTER STRIPS
- FILTER STRIP INFORMATION
- DRAWING TO BE READ WITH DECISION NOTICE
- FLOODING AND DRAINAGE RECONSULTATION RESPONSE
- EMAIL WITH FURTHER INFO
- ROAD SERVICE RECONSULTATION RESPONSE 2
- ROAD SERVICE RECONSULTATION RESPONSE 2 SUPPORTING DOCUMENT
- EMAIL TO STOP THE CLOCK
- SEPA CONSULTATION RESPONSE - 24.5.2021
- ROAD SERVICE RECONSULTATION RESPONSE
- RE OVERDUE CONSULTATION RESPONSE
- RESPONSE TO ROADS CONSULTATION
- VISIBILITY SPLAYS SUPPORTING INFO
- EMAIL RE FURTHER INFO
- CONSULTATION RESPONSE - ROADS
- SHETLAND TIMES ADVERT
- CONSULTATION RESPONSE - SCOTTISH WATER
- CONSULTATION RESPONSE - MARINE PLANNING
- CONSULTATION RESPONSE - DRAINAGE
- CONSULTATION RESPONSE - REGIONAL ARCHAEOLOGIST
- DESIGN STATEMENT
- APPLICATION PDF
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Shetland Islands granted permission on 18 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Shetland Islands
-
026/188/PPF Awaiting decision
Land West Of Culsetter Park, Brae, Shetland
Full Planning Permission for the construction of new access road and associated drainage infrastructure; and Planning Permission in Principle for ten number 1-2 storey detached residential dwellings for Culsetter Park Phase 3 housing development
-
2026/183/PPF Awaiting decision
8 Fogralea Lerwick Shetland ZE1 0SE
Gable garage extension with alterations to a vehicular access.
-
2026/184/PPF Awaiting decision
23 Gressy Loan Lerwick Shetland ZE1 0YB
To erect single storey extension to south elevation, install SUDS device and relocate oil tank
-
2025/242/DCON1 Awaiting decision
Buildbase Freefield Road Lerwick Shetland ZE1 0NH
Application for consent, agreement or approval required by planning Condition: 03 (realigned Core Path) of planning application 2025/242/PPF.
-
2026/172/PPF Awaiting decision
Plot Lower Hillside Gulberwick Shetland
2 No. self-catering glamping pods, drainage works, and timber boundary fence 1.2M - 1.8M.