Skip to content
PlanIndex Get alerts
Menu

Planning application

Da Auld Methodist Kirk Bridge End Burra Shetland ZE2 9LD

Withdrawn Shetland Islands 2020/021/PPF Planning Permission Full

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Retrospective application for change of use from place of worship to studio/workshop

As published by the council, reference 2020/021/PPF

Application record

Reference
2020/021/PPF
Type
Planning Permission Full
Status
Decided
Decision
Withdrawn
Received
6 Feb 2020
Validated
19 May 2021
Decided
11 Aug 2021
Parish
BURRA & TRONDRA
Postcode
ZE2 9LD

Timeline

Dates from the published record

  1. 6 Feb 2020

    Received by Shetland Islands

  2. 19 May 2021

    Validated

    Checked as complete and ready for consideration.

  3. 11 Aug 2021

    Decision issued: Withdrawn

  4. 5 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Shetland

22 applications on PlanIndex · across 4 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What withdrawal means

The applicant withdrew this application before Shetland Islands decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Shetland Islands

  • 2025/317/PPF Granted

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.

    19 Dec 2025 Full applications
  • 2026/081/PPF Granted

    The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN

    To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.

    9 Apr 2026 Full applications
  • 2026/103/PPF Granted

    Mossy Hill Wind Farm Lerwick Shetland

    To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry

    22 May 2026 Full applications
  • 2026/052/PPF Granted

    Land To The East Of A970, Hill Of Wethersta, Shetland.

    The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.

    6 Mar 2026 Full applications
  • 2026/093/PPF Granted

    Whirlie Sandwick Shetland ZE2 9HN

    To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.

    11 May 2026 Full applications