Planning application

Baillister Tingwall Shetland ZE2 9SB

Granted Shetland Islands 2019/290/PPF Planning Permission Full

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Extension to existing MOT garage to form new customer waiting room

As published by the council, reference 2019/290/PPF

Application record

Reference
2019/290/PPF
Type
Planning Permission Full
Status
Decided
Decision
Grant subject to conditions
Received
24 Oct 2019
Validated
31 Oct 2019
Decided
25 Nov 2019
Ward
Tingwall, Whiteness & Weisdale
Parish
TINGWALL, WHITENESS & WEISDALE
Decision by
Delegated Decision
Postcode
ZE2 9SB

Timeline

Dates from the published record

  1. 24 Oct 2019

    Received by Shetland Islands

  2. 31 Oct 2019

    Validated

    Checked as complete and ready for consideration.

  3. 25 Nov 2019

    Decision issued: Grant subject to conditions

  4. 21 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Shetland Islands granted permission on 25 November 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Shetland Islands

  • 2025/317/PPF Granted

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.

    19 Dec 2025 Full applications
  • 2026/081/PPF Granted

    The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN

    To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.

    9 Apr 2026 Full applications
  • 2026/103/PPF Granted

    Mossy Hill Wind Farm Lerwick Shetland

    To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry

    22 May 2026 Full applications
  • 2026/052/PPF Granted

    Land To The East Of A970, Hill Of Wethersta, Shetland.

    The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.

    6 Mar 2026 Full applications
  • 2026/093/PPF Granted

    Whirlie Sandwick Shetland ZE2 9HN

    To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.

    11 May 2026 Full applications