Planning application
Rohaven East Voe Scalloway ZE1 0US
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Extend existing dwellinghouse (north-west elevation)
As published by the council, reference 2006/444/PCD
Application record
- Reference
- 2006/444/PCD
- Type
- Ful Planning
- Status
- Permitted
- Decision
- Approval Details
- Received
- 11 Dec 2006
- Validated
- 5 Dec 2006
- Decided
- 29 Jan 2007
- Parish
- SCALLOWAY
- Postcode
- ZE1 0US
Timeline
Dates from the published record
-
5 Dec 2006
Validated
Checked as complete and ready for consideration.
-
11 Dec 2006
Received by Shetland Islands
-
29 Jan 2007
Decision issued: Approval Details
-
5 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Shetland Islands granted permission on 29 January 2007, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Filska East Voe Scalloway Shetland ZE1 0US
To site new mobile static home for personal use and rental.
Granted Full applications 23 docs -
New Plot Sundibanks East Voe Scalloway Shetland
Proposed new house site and access road (Planning Permission in Principle)
Granted Outline 15 docs
Other full applications
In Shetland Islands
-
2025/317/PPF Granted
Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU
The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.
-
2026/081/PPF Granted
The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN
To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.
-
2026/103/PPF Granted
Mossy Hill Wind Farm Lerwick Shetland
To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry
-
2026/052/PPF Granted
Land To The East Of A970, Hill Of Wethersta, Shetland.
The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.
-
2026/093/PPF Granted
Whirlie Sandwick Shetland ZE2 9HN
To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.