Planning application
Clousta Bixter ZE2 9LX
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erect shellfish farm shore base, with associated jetty, sea water intake pipe and septic tank with sea outfall
As published by the council, reference 2004/220/PCD
Application record
- Reference
- 2004/220/PCD
- Type
- Ful Planning
- Status
- Permitted
- Decision
- Permitted
- Received
- 25 May 2004
- Validated
- 18 May 2004
- Decided
- 17 May 2005
- Parish
- SANDSTING & AITHSTING
- Postcode
- ZE2 9LX
Timeline
Dates from the published record
-
18 May 2004
Validated
Checked as complete and ready for consideration.
-
25 May 2004
Received by Shetland Islands
-
17 May 2005
Decision issued: Permitted
-
31 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Shetland Islands granted permission on 17 May 2005, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Shetland Islands
-
2025/317/PPF Granted
Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU
The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.
-
2026/081/PPF Granted
The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN
To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.
-
2026/103/PPF Granted
Mossy Hill Wind Farm Lerwick Shetland
To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry
-
2026/052/PPF Granted
Land To The East Of A970, Hill Of Wethersta, Shetland.
The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.
-
2026/093/PPF Granted
Whirlie Sandwick Shetland ZE2 9HN
To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.