Planning application
Toll Bar Cottage 189 Burngreave Road Sheffield S3 9DL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Removal of existing bathroom partitions, formation of a new accessible wet room, installation of replacement kitchen units, blocking up of an existing internal archway, replacement ceilings and internal redecoration, repair and rebuilding of boundary wall, replacement of timber gate frame to match existing, installation of timber boundary fencing, formation of a concrete hardstanding within the rear yard and repair of the front entrance threshold
As published by the council, reference 26/02038/LBC
Application record
- Reference
- 26/02038/LBC
- Category
- Heritage and listed buildings
- Status
- Decided
- Decision
- Granted As published: Grant Conditionally
- Received
- 8 Jul 2026
- Validated
- 8 Jul 2026
- Decided
- 2 Sep 2026
- Ward
- Burngreave
- Decision by
- Delegated decision
- Postcode
- S3 9DL
Site history
Applications at this address on the Sheffield register
This site has had 2 applications since 2026: 2 approved, 0 refused.
-
26/02037/FUL Granted
Toll Bar Cottage 189 Burngreave Road Sheffield S3 9DL
Repair and rebuilding of boundary wall, replacement of timber gate frame to match existing, installation of timber boundary fencing, formation of a concrete hardstanding within the rear yard
Timeline
Dates from the published record
-
8 Jul 2026
Received by Sheffield
-
22 Jul 2026
Added to PlanIndex
-
2 Sep 2026
Decision issued: Grant Conditionally
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Sheffield granted permission on 2 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Toll Bar Cottage 189 Burngreave Road Sheffield S3 9DL
Repair and rebuilding of boundary wall, replacement of timber gate frame to match existing, installation of timber boundary fencing, formation of a concrete hardstanding within the rear yard
Granted Full applications 10 docsSmall domestic -
46-84 Pinfold Lane Sheffield S3 9BB
Erection of secure front entrance porch and new rear security door
Granted Full applications Extension 8 docsSmall domestic -
World Class Supermarket 290 Pitsmoor Road Sheffield S3 9AW
Removal of existing 6no. antennas, supporting poles and ancillary equipment and installation of 7.5m stub tower (height to the top 20.2m above ground level) mounted on steel grillage, supporting 6no. antennas and ancillary development thereto including 18no. Remote Radio Units
Granted Telecoms 32 docs -
31 Holtwood Road Sheffield S4 7BA
Alterations to roof space including erection of a dormer window
Granted Full applications Loft or dormer Windows or glazing 7 docs -
16 Cooks Wood Road Sheffield S3 9AB
Erection of single-storey rear extension - the extension is 6 metres from the rear of the original dwelling house, ridge height no more than 3.21 metres and height to the eaves of 2.97 metres
Withdrawn Prior approval Extension Roofing 7 docsSmall domestic -
251 Pitsmoor Road Sheffield S3 9AQ
Application to approve details in relation to condition number: 4 (Window Details) Relating to planning permission 25/03576/FUL
Decided Windows or glazing 5 docs
Other heritage and listed building applications
In Sheffield
-
26/03192/LBC Awaiting decision
46 Doncaster Street Sheffield S3 7BD
Temporary works, remedial works, repairs and rebuild of various parts of Listed Building to prevent further deterioration (Application under Section 19 to vary directive no(s) 3 (approved plans) and remove/discharge condition no(s) 2 (mortar specification), 3 (bricks/roofing slates) and 4 (internal staircase/structures) as imposed by 25/00590/LBC)
-
26/01516/LBC Granted
450 Fulwood Road Sheffield S10 3GH
Internal alterations to the first floor including structural alterations, formation of a new landing, conversion of the existing bathroom to a bedroom, erection of an internal partition wall, and enclosure of the rear stairwell
-
26/03087/LBC Awaiting decision
Hadfield Cawkwell Davidson Ltd Broomgrove Lodge 13 Broomgrove Road Sheffield S10 2LZ
Refurbishment and replacement of single-glazed windows at ground and first floor level with slim double-glazed windows
-
26/03066/LBC Awaiting decision
The Stables Barnes Hall Bracken Hill Sheffield S35 1RD
Internal and external alterations to dwellinghouse including internal reconfiguration, alterations to doors and windows, formation of new window/door openings, partial infilling of existing opening, installation of replacement windows and doors, new entrance steps, alterations to rear off-shot and installation of external battery storage
-
26/03058/LBC Awaiting decision
Turret House Manor House Manor Lane Sheffield S2 1UH
Replacement and extension to fire alarm system