Skip to content
PlanIndex Get alerts
Menu

Planning application

2 - 8 Crookes Road Sheffield S10 5BB

Awaiting decision Sheffield 26/02029/FUL Full applications

Works: New dwelling Extension Loft or dormer Several homes

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Alterations to first and second floor to form 4 flats (Use Class C3) including erection of rear dormer extensions and rooflights to front, erection of external access steps and walkway to rear

As published by the council, reference 26/02029/FUL

Application record

Reference
26/02029/FUL
Category
Full applications
Status
Awaiting decision
Received
7 Jul 2026
Validated
6 Aug 2026
Postcode
S10 5BB

Timeline

Dates from the published record

  1. 7 Jul 2026

    Received by Sheffield

  2. 6 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 12 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 1 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Sheffield took a median of 49 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Sheffield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 184 - 186 Whitham Road Sheffield S10 2SS

    20/01824/COND1 Submitted 1 Jun 2021 62m away

    Application to approve details in relation to condition number 4. Noise Validation; Relating to planning permission 20/01824/FUL

    Decided Conditions 5 docs
  • 216 Fulwood Road Sheffield S10 3BB

    23/03875/FUL Submitted 6 Dec 2023 74m away

    Alterations and formation of new shopfront with glazed bi-fold doors (Retrospective)

    Granted Full applications Windows or glazing 12 docs
  • 216 Fulwood Road Sheffield S10 3BB

    23/03876/ADV Submitted 6 Dec 2023 74m away

    1 x internally illuminated fascia sign and 1 x non illuminated information sign (Retrospective)

    Granted Advertising 9 docs
  • Yorkshire Bank 209 - 211 Whitham Road Sheffield S10 2SP

    19/03672/FUL Submitted 7 Oct 2019 91m away

    Provision of railings to flat roof at first floor level

    Granted Full applications 12 docs
  • 19 Nile Street Sheffield S10 2PN

    08/03096/COND Submitted 23 Jun 2008 95m away

    Submission of 07/03837/FUL condition details. Condition numbers: 2. Material details; 12. Heating, cooling and ventilation equipment details; 15. Waste storage; 16. Drainage; 17. Disposal of surface water; 18. Sewer access; 19. Surface water calculations; 20. Discharge of surface water; 21. Prevention of surface water onto highway

    Withdrawn Conditions 6 docs
  • 1 Nile Street Sheffield S10 2PN

    21/02857/TCA Submitted 23 Jun 2021 95m away

    Removal of trees (Broomhill Conservation Area)

    Granted Trees 9 docs

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications