Planning application
26/01396/FUL
Sheffield Park Academy Beaumont Road North Sheffield S2 1SN
Proposal
Erection of single-storey extension to dining room, alterations and single-storey extension to toilet block, three-storey extension to classroom wing to form 6no. additional classrooms and 2no. offices and alterations to lower car park to provide additional parking spaces
As published by the council, reference 26/01396/FUL
Timeline
Dates from the published record
-
13 May 2026
Received by Sheffield
-
5 Jun 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Sheffield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
19/03559/FUL Granted
Manor Dental Practice 1A Motehall Road Sheffield S2 1RA
Erection of a single-storey side/rear extension and provision of new entance to front elevation
-
19/03776/FULTEL Refused
Telecommunications Mast On Grass Verge Outside Lidl Castlebeck Avenue Sheffield S2 1DS
Removal of 12.5m monopole and erection of 20m monopole and associated equipment cabinets
-
19/03777/TEL Refused
Telecommunications Mast Outside Lidl Prince Of Wales Road Sheffield S2 1DS
Erection of 20m telecommunications monopole and associated equipment cabinets (Application for determination if approval required for siting and appearance)
-
19/03671/HPN Granted
37 Littledale Road Sheffield S9 4GA
Single-storey rear extension to dwellinghouse - the extension is 3.5m from the rear of the original dwellinghouse, ridge height no more than 3.9m and the height of the eaves 2.8m
-
26/01328/FUL Granted
653 Prince Of Wales Road Sheffield S9 4ES
Erection of a single-storey front/side extension to dwellinghouse
Other full applications applications
In Sheffield
-
26/01807/FUL Granted
15 Rawson Close Sheffield S2 2DF
Erection of a two-storey side and single/two-storey rear extension to dwellinghouse
-
26/02272/FUL Awaiting decision
The Shiregreen Arms 5 Mason Lathe Road Sheffield S5 0TL
Erection of three-storey apartment block comprising 21 apartments (Use Class C3) with associated landscaping, access and parking
-
26/01721/FUL Granted
Old Wheel Farm Rowell Lane Sheffield S6 6SH
Erection of a single-storey rear extension to dwellinghouse
-
26/01622/FUL Granted
24 Richmond Hill Road Sheffield S13 8LN
Formation of mono pitch roof to dwellinghouse
-
26/02257/FUL Awaiting decision
Lowedges Road Fire Station Lowedges Road Sheffield S8 7JN
Erection of single-storey timber gazebo with accessible ramp