Skip to content
PlanIndex Get alerts
Menu

Planning application

Oakes Park Lodge School Lane Norton Sheffield S8 8BL

Granted Sheffield 25/02819/LBC Listed Building Consent Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single-storey extension and internal alterations

As published by the council, reference 25/02819/LBC

Application record

Reference
25/02819/LBC
Type
Listed Building Consent Application
Status
Decided
Decision
Grant Conditionally
Received
22 Sep 2025
Validated
22 Sep 2025
Decided
24 Feb 2026
Ward
Graves Park
Decision by
Delegated decision
Postcode
S8 8BL

Site history

Applications at this address on the Sheffield register

This site has had 3 applications since 2025: 3 approved, 0 refused.

  • 25/03076/TCA Granted

    Oakes Park Lodge School Lane Norton Sheffield S8 8BL

    Removal of a tree (Oakes Park Conservation Area)

    Decided 20 Nov 2025 Trees
  • 25/02818/FUL Granted

    Oakes Park Lodge School Lane Norton Sheffield S8 8BL

    Erection of a single-storey extension and internal alterations

    Decided 24 Feb 2026 Full applications

Timeline

Dates from the published record

  1. 22 Sep 2025

    Received by Sheffield

  2. 24 Feb 2026

    Decision issued: Grant Conditionally

  3. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Sheffield granted permission on 24 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Oakes Park Lodge School Lane Norton Sheffield S8 8BL

    25/02818/FUL Submitted 22 Sep 2025 0m away

    Erection of a single-storey extension and internal alterations

    Granted Full applications Extension 17 docs
    Small domestic
  • 298 Norton Lane Sheffield S8 8HE

    21/01808/FUL Submitted 19 Apr 2021 110m away

    Demolition of dwellinghouse and erection of 14 apartments in 2x three/four-storey blocks with associated parking

    Granted Full applications New dwelling Demolition 37 docs
    Major scheme
  • Land At Rear Of Waterfall Close And Summerhouse Drive Norton Lane Sheffield S8 8BL

    26/00607/FUL Submitted 5 Mar 2026 170m away

    92% historically approved · decision due ~6 May

    Erection of 13 dwellinghouses and associated infrastructure, including new vehicular and pedestrian access, service roads and landscaping works (Application under Section 73 to vary condition no(s) 2 (approved plans) and remove/discharge condition no(s) 3, 4 and 5 (drainage) and 19 (external materials/finishes) as imposed by planning permission 24/03241/FUL)

    Awaiting decision Full applications 55 docs
    Major scheme
  • Beecholme 282 Norton Lane Sheffield S8 8HE

    24/00859/FUL Submitted 18 Mar 2024 177m away

    Erection of single-storey rear extension, alterations to roof of dwellinghouse including installation of rooflights and solar panels

    Granted Full applications Extension Loft or dormer 11 docs
    Small domestic
  • 7 Norton Green Close Sheffield S8 8BP

    21/03840/FUL Submitted 25 Aug 2021 247m away

    Demolition of conservatory and single-storey rear extension and erection of two/single-storey rear extension to dwellinghouse

    Granted Full applications Extension Demolition 5 docs
    Small domestic
  • 26 School Lane Norton Sheffield S8 8BL

    24/00668/FUL Submitted 1 Mar 2024 269m away

    Demolition of car port and conservatory, erection of single-storey front/side and rear extensions to dwelling house

    Granted Full applications Extension Demolition 6 docs
    Small domestic

In Sheffield

  • 26/02605/LBC Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Heritage and listed buildings
  • 26/02568/LBC Awaiting decision

    Pumpkin Cafe And WHSmiths Between Platform 6 And 8 Sheffield Midland Railway Station Sheaf Street Sheffield S1 2BP

    Alterations and refurbishment of cafe including decoration of internal walls and timber window/door frames, erection of partition wall, installation of internal and external signage

    28 Aug 2026 Heritage and listed buildings
  • 26/02565/LBC Awaiting decision

    Wharncliffe Works Green Lane Shalesmoor Sheffield S3 8SE

    Removal of the roof of existing building and erection of a 4 storey building comprising of ground floor office accommodation, 2 x 4-bedroom and 1 x 3-bedroom apartments within the retained walls (Application under Section 73 to vary condition non no(s) 2 (approved plans) as imposed by planning permission 18/03815/LBC)

    25 Aug 2026 Heritage and listed buildings
  • 26/01264/LBC Granted

    2 Furnival Road Sheffield S4 7YA

    Installation of 2no. security gates/fences at either end of Victoria Quays elevated walkway

    29 Apr 2026 Heritage and listed buildings
  • 26/01465/LBC Granted

    South Road Spiritualist Church South Road Walkley Sheffield S6 3TA

    Alterations to Grade II listed building, including widening of existing access onto Fir Street, partial removal and alteration of existing boundary wall, installation of timber entrance gates, associated hardstanding, low-level lighting and soft landscaping works, and refurbishment of existing single-storey South Road wing including replacement hipped roof, replacement timber windows, internal insulation, damp treatment and associated internal refurbishment works

    18 May 2026 Heritage and listed buildings