Planning application
Land At Rear Of Owlerton Sports Stadium Livesey Street Sheffield S6 2BL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of reactors, switchroom, blast wall and ancillary infrastructure and associated works including new access onto Livesey Street, erection of a security fence, internal drives and cable connection to Neepsend Substation to supply reactive absorption grid stability to the National grid as part of Voltage 2026 initiative
As published by the council, reference 24/00930/FUL
Application record
- Reference
- 24/00930/FUL
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Granted As published: Grant Conditionally
- Received
- 25 Mar 2024
- Validated
- 25 Apr 2024
- Decided
- 20 Jun 2024
- Ward
- Hillsborough
- Decision by
- Delegated decision
- Postcode
- S6 2BL
Timeline
Dates from the published record
-
25 Mar 2024
Received by Sheffield
-
25 Apr 2024
Validated
Checked as complete and ready for consideration.
-
20 Jun 2024
Decision issued: Grant Conditionally
-
17 Nov 2026
Added to PlanIndex
Documents
21 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Sheffield granted permission on 20 June 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Owlerton Sports Stadium Penistone Road Owlerton Sheffield S6 2DE
Erection of two single-sided illuminated free-standing signs
Granted Advertising 11 docs -
Independent Forgings & Alloys Ltd Victoria Forge Livesey Street Sheffield S6 2BL
Application to allow amended wording to condition 8 (Surface Water Drainage Design) (Amendment to planning permission 25/03726/FUL)
Granted Amendments -
Independent Forgings & Alloys Ltd Victoria Forge Livesey Street Sheffield S6 2BL
Application to approve details in relation to condition no(s) 3 (Construction Environmental Management Plan (CEMP)), 4 (dust emission), 5 (wheel cleaning), 6 (Employment and Skills Strategy), 9 (tree protection measures), 10 (renewable/low carbon energy), 11 (BREEAM), 18 (ground gas protection measures), and the Statutory Biodiversity Net Gain condition relating to planning permission 25/03726/FUL
Decided Trees 10 docs -
Lay-by Off Livesey Street Sheffield S6 2BL
Use of lay-by for parking a mobile hot food take-away van
Granted Full applications 12 docs -
Hillsborough Fencing Company Ltd 20 Livesey Street Sheffield S6 2BL
Application to approve details in relation to Condition No(s) 3. Land Contamination Investigation, 4. Intrusive Site Investigation Report, 5. Remediation Works, 6. Remediation Strategy, and 7. Approved Remediation Strategy; relating to planning permission No. 21/00308/FUL
Decided Conditions 5 docs -
Independent Forgings & Alloys Ltd Victoria Forge Livesey Street Sheffield S6 2BL
Redevelopment of site including, demolition / partial demolition of existing buildings and erection of new industrial and ancillary buildings, alterations and extensions to existing industrial and ancillary buildings, erection of new gantry cranes and associated alterations to parking and landscaping, to be delivered in severable phases.
Granted Full applications Extension Demolition 72 docs
Other full applications
In Sheffield
-
26/02828/FUL Withdrawn
177 High Storrs Road Sheffield S11 7LH
Alterations to existing dwelling to form 2x dwellinghouses including erection of a two-storey and a single-storey rear extension, 2x two-storey front extensions, new roof over with raised eaves and ridge levels, rear dormer windows and new vehicular access to the front (Application under Section 73 to vary condition no(s) 2 (approved plans) as imposed by planning permission 26/00095/FUL)
-
26/02827/FUL Granted
41 Westland Gardens Sheffield S20 8ES
Erection of single-storey front extension to dwellinghouse
-
26/02805/FUL Granted
38 Osberton Place Sheffield S11 8XL
Demolition of detached garage, erection of single-storey front/side/rear extension, formation of rear dormer, alterations to frontage including part removal of boundary wall to facilitate new parking arrangement, provision of retaining wall with balustrade over and provision of external access steps
-
26/02712/FUL Granted
Tam Hangers (UK) Reuse Ltd Part A Unit 2 Provincial Park Nether Lane Sheffield S35 9ZX
Overcladding of existing metal roof with new insulated metal cladding system, installation of new GRP roof light cladding sheets to match existing, raising the overall ridge height, recoating of existing wall cladding to improve external appearance
-
26/03033/FUL Granted
60 Garry Road Sheffield S6 4FS
Erection of single-storey side extension to dwellinghouse and alterations to garage roof from a flat roof to single pitch roof